USMMA - Women's Locker Room Renovation
Past New Requirement Updated
- Agency
-
Department of Transportation
- Solicitation expected
- Estimated value
- $250,000 to $499,000
- Set-aside
- Total Small Business
Forecast facts
- Anticipated award
- Through
- Acquisition strategy
- Open Market
- NAICS code
- 236220 Commercial and Institutional Building Construction
- Place of performance
- Kings Point, NY
- Forecast number
- 47137
- Points of contact
Forecast details come from the GSA Acquisition Gateway. Agencies' dates and values are estimates.
About this forecast
The Department of Transportation is forecasting a firm fixed price purchase order, set aside for total small business, to renovate the women's locker room at the U.S. Merchant Marine Academy, with an estimated solicitation release on 2026-05-22 and an estimated award on 2026-06-23. The contractor must provide all labor, materials, and equipment to replace rubber flooring and bathroom mosaic tile, remove old metal lockers and install layout-approved configurations, replace ceilings with moisture-resistant suspended PVC panels, and upgrade lighting with new LED fixtures. Work also includes reconfiguring bathroom and shower layouts with heavy-duty floor-anchored HDPE dividers, installing shower fixtures, floor drains, and mirrors, repairing deficient electrical wiring, insulating exposed piping, installing an HVAC ventilation timer, patching masonry, and painting the entire space.
The estimated award value range is $250,000 to $499,000, with a current fiscal year projected obligation of $466,186.68, funded by the Maritime Administration from agency funds. The performance period is forty-five calendar days, and the period of performance dates listed are 2026-06-23 through 2026-08-17, at Kings Point, New York, within the Northeast and Caribbean region. Charles McInnis, Facility Operations Specialist at the U.S. Merchant Marine Academy, is the point of contact at mcinnisc@usmma.edu.
Forecast text
This project requires a qualified contractor to provide all labor, materials, and equipment to perform comprehensive renovations within the women's locker room facility. The scope includes the mechanical removal and replacement of existing rubber flooring and bathroom mosaic tile , removing old metal lockers to install new layout-approved configurations , and replacing existing ceilings with new moisture-resistant suspended PVC panels. Contractors will also upgrade the lighting with new LED fixtures , reconfigure the bathroom and shower layouts using heavy-duty floor-anchored HDPE dividers , and install new shower fixtures, floor drains, and mirrors. Finally, the project requires repairing deficient electrical wiring , insulating exposed piping , installing an HVAC ventilation timer , patching masonry , and painting the entire space within a forty-five calendar day performance period.
On GovTribe
Work this forecast
- Track it in your pipeline
- Find teaming partners
- Similar forecasts
- Ask GovTribe AI about this forecast