USCGC ALEX HALEY Switchboard Replacement

Forecast New Requirement Updated

Agency
Solicitation expected
Estimated value
$2,000,000 to $5,000,000
Set-aside
Not on record

Forecast facts

Anticipated award
Through
NAICS code
335313 Switchgear and Switchboard Apparatus Manufacturing
Place of performance
Kodiak, AK
Forecast number
F2026075455
Points of contact

Forecast details come from DHS's Acquisition Planning Forecast System. Agencies' dates and values are estimates.

About this forecast

The U.S. Coast Guard, within the Department of Homeland Security, is forecasting a firm fixed price purchase order under FAR Subpart 13.5 to replace the ship's service switchboards on the 282-foot USCGC ALEX HALEY (WMEC-39), which are no longer supportable, with an estimated solicitation release date of May 20, 2027, and an estimated award date of December 6, 2027. The contracting office CPD2/LREPL is procuring for requirements office LREPL, and the three-phase scope covers design, fabrication, and installation support for a new 450 VAC, three-phase switchboard that must measure no more than 192 inches in length, 25.25 inches in depth, and 81 inches in height, be built to UL 891 and IEEE 45 standards, and withstand up to 45 rolls and 10 pitch in a marine environment. The switchboard will consist of four separable sections to facilitate rigging and installation, and the vendor must perform electrical system analyses covering fault currents, protective device coordination, arc flash, and failure modes.

The estimated award value range is $2.0 million to $5.0 million, and the requirement is listed for fiscal year 2028 with award anticipated in Q1 2028. Place of performance is Kodiak, Alaska. Points of contact are Corry Thomas, Chief Warrant Officer 3, at corry.d.thomas@uscg.mil or +12168152046; Benjamin Clark at benjamin.e.clark@uscg.mil or (571) 614-2865; and Laura Lugo, SBS coordinator, at laura.j.lugo2@uscg.mil or (206) 827-4369.

Forecast text

The 282-FT USCGC ALEX HALEY (WMEC-39) Ship Service Switchboards are no longer supportable and require replacement. This project entails the replacement of the ship's service switchboards through a comprehensive three-phase process covering design, fabrication, and installation support. The new 450 VAC, three-phase switchboard must adhere to strict dimensional constraints, with a maximum size of 192 inches in length, 25.25 inches in depth, and 81 inches in height, and must be built to UL 891 and IEEE 45 standards. Designed for a marine environment, it will consist of four separable sections to facilitate rigging and installation and must withstand up to 45° rolls and 10° pitch. Additionally, the vendor will be required to perform critical electrical system analyses, including studies on fault currents, protective device coordination, arc flash, and failure modes.

On GovTribe

Work this forecast

  • Track it in your pipeline
  • Find teaming partners
  • Similar forecasts
  • Ask GovTribe AI about this forecast