Study/Design Stormwater Management Best Management Practice Features to Achieve 3rd Cycle Chesapeake Bay Total Maximum Daily Load at CG Training Center Yorktown
Past New Requirement Updated
- Agency
-
Coast Guard
Department of Homeland Security
- Solicitation expected
- Estimated value
- $350,000 to $500,000
- Set-aside
- No set-aside
Forecast facts
- Anticipated award
- Through
- NAICS code
- 541620 Environmental Consulting Services
- Place of performance
- Yorktown, VA
- Forecast number
- F2026073058
- Points of contact
-
- Doreen Leah Masterson doreen.l.masterson@uscg.mil (571) 614-5609
- Thomas Ankers thomas.j.ankers@uscg.mil (571) 494-0734
Forecast details come from DHS's Acquisition Planning Forecast System. Agencies' dates and values are estimates.
About this forecast
The U.S. Coast Guard is forecasting a new requirement to identify and design Best Management Practice (BMP) Features at the CG Training Center in Yorktown, Virginia to achieve 3rd cycle Chesapeake Bay Total Maximum Daily Load (TMDL) goals established by the EPA. The design work will utilize LIDAR topography maps, site visits, and geotechnical evaluations to develop BMPs that meet specified TMDL objectives based on identified drainage areas. The solicitation is estimated for release on May 18, 2026, with an anticipated award date of June 19, 2026.
The estimated contract award value ranges from $350,000 to $500,000 under a Firm Fixed Price contract vehicle utilizing Architecture and Engineering Services II. The period of performance is estimated to run from June 19, 2026 through December 16, 2026, with all work performed in Yorktown, Virginia. The primary point of contact is Thomas Ankers at thomas.j.ankers@uscg.mil or (757) 262-9588, with Doreen Masterson serving as the alternate contact at doreen.l.masterson@uscg.mil or (571) 614-5609. This requirement is open to small business set-asides and is being managed by CEU Cleveland as the contracting office.
Forecast text
This requirement consists of identifying and designing Best Management Practice (BMP) Features to achieve 3rd cycle Chesapeake Bay Total Maximum Daily Load (TMDL) Goals set by the EPA. Design work should take into account drainage areas identified utilizing LIDAR topography maps, a site visit, and geotechnical evaluations to best identify BMPs that meet TMDL goals.
On GovTribe
Work this forecast
- Track it in your pipeline
- Find teaming partners
- Similar forecasts
- Ask GovTribe AI about this forecast