Replace Boat Bay Roof at Sector Northern Great Lakes, Sault Ste Marie, MI - PSN 12165041

Forecast New Requirement Updated

Agency
Solicitation expected
Estimated value
$1,000,000 to $2,000,000
Set-aside
No set-aside

Forecast facts

Anticipated award
Through
NAICS code
236210 Industrial Building Construction
Place of performance
Sault Ste Marie, MI
Forecast number
F2026074130
Points of contact

Forecast details come from DHS's Acquisition Planning Forecast System. Agencies' dates and values are estimates.

About this forecast

The U.S. Coast Guard is forecasting a new firm-fixed-price requirement to replace the boat bay roof at Sector Northern Great Lakes, with an estimated solicitation release on December 15, 2026, and an estimated award on February 25, 2027, under the RMACC II (Design/Build Construction Services II, Regional) vehicle. The work includes removing the existing EPDM roof system and metal fascia, installing a new PVC roof system with tapered insulation, gypsum cover board, and membrane, and installing new HVAC curbs, a new wood parapet, four new overflow drains with 5-inch cast iron piping, and scuppers at the Admin/Barracks and Galley roofs. The contractor must maintain 68°F minimum heat or 78°F maximum cooling using existing or temporary equipment, and no electrical, mechanical, or controls work is called for beyond disconnection and reconnection.

The estimated award value range is $1.0 million to $2.0 million, with an estimated period of performance from February 25, 2027, through June 5, 2027, and no set-aside is used. Place of performance is Sault Ste. Marie, MI 49783, and the CEU Cleveland contracting office is listed with Contracting Officer Robert Spangler (robert.t.spangler@uscg.mil, +1 571-610-7286) as the primary point of contact and Gabriel Perez (gabriel.d.perez@uscg.mil, (571) 607-1542) as the SBS coordinator. The additional information field lists an anticipated award date of January 15, 2027, which differs from the Estimated Award Date of February 25, 2027.

Forecast text

Replace Boat Bay Roof at Sector Northern Great Lakes, Sault Ste Marie, MI - PSN 12165041

1. WORK INCLUDED: Major items of work shall include the following:

1.1 Remove the existing metal fascia and wood blocking at roof edges.

1.2 Remove existing single ply EPDM roof system including roof membrane, roof flashings,

roof insulation and roof edge to expose the existing concrete roof deck. The existing flat portion

of the roof is constructed with tapered insulation sloping to roof drains.

1.3 All existing roof top equipment is scheduled to remain. All existing roof penetrations are

scheduled to remain.

1.4 The contractor shall provide temporary heating or cooling to allow for the maintenance of

68 degrees F heat minimum with existing or temporary heating equipment or 78 degrees F

maximum with existing or temporary cooling equipment.

1.5 Install new Polyvinyl-Chloride (PVC) roof system including new tapered roof insulation,

multiple ply roof membrane with ½” gypsum cover board, associated roof flashings including

various base and pipe penetration configurations. Existing roof drains shall be in sump pans.

1.6 Provide and install new curbs at roof top HVAC units to accommodate new roofing

thickness. Secure split-system air conditioners to new roof. Disconnect, remove, store, and

protect the existing exhaust fans during re-roofing operations, then re-install to the original

condition on a new curb. No electrical, mechanical, or controls work outside of disconnection

and reconnection is called for.

1.7 Install new wood parapet wall at roof edge to accommodate new roofing thickness and

install new metal fascia. Install scuppers at Admin/Barracks roof and Galley roof.

1.8 Install new overflow drains (4 locations) and 5” cast iron piping under the roof structure

down to outlet at 36” above grade.

1.9 Work associated with these items are described in the following specification sections

and/or are shown on the contract drawings. Incidental work items not listed above and necessary

for completing the project shall be included.