Repair HVAC MMB, Coast Guard Stations Gloucester and Merrimack River, PSN 32721096
Forecast New Requirement Updated
- Agency
-
Coast Guard
Department of Homeland Security
- Solicitation expected
- Estimated value
- $2,000,000 to $5,000,000
- Set-aside
- Total Small Business
Forecast facts
- Anticipated award
- Through
- NAICS code
- 236220 Commercial and Institutional Building Construction
- Place of performance
- gloucester, MA
- Forecast number
- F2026075158
- Points of contact
-
- Michael Carosotto michael.p.carosotto@uscg.mil (571) 608-9991
Forecast details come from DHS's Acquisition Planning Forecast System. Agencies' dates and values are estimates.
About this forecast
The U.S. Coast Guard, within the Department of Homeland Security, is forecasting a new total small business set-aside requirement to repair HVAC systems at Coast Guard Stations Gloucester and Merrimack River (PSN 32721096), with solicitation release estimated for December 7, 2026. Required work includes removing and replacing both RTUs and all VAVs, replacing registers and diffusers, installing new return ductwork in the Galley, interlocking the MMB RTU to the existing BAS and the Galley RTU to the Kitchen Hood to prevent negative pressure, and cleaning ductwork of dust and debris. Award is estimated for February 15, 2027.
The estimated award value range is $2.0 million to $5.0 million on a firm fixed price basis under the Design/Build Construction Services II (Regional) (RMACC II) vehicle, with an estimated period of performance from February 15, 2027 through September 30, 2027. Place of performance is listed as Gloucester, Massachusetts. CEU Providence is the contracting office, and Michael Carosotto, Technical Director, United States Coast Guard, is the primary point of contact at michael.p.carosotto@uscg.mil or (571) 608-9991, with Sean Waldron as the small business set-aside coordinator at sean.e.waldron@uscg.mil or (401) 318-3344.
Forecast text
Repair HVAC system components at both Stations Gloucester and Merrimack River. Work includes:
- Remove and replace both RTUs
- Remove and replace all VAVs
- Remove and replace registers/diffusers
- Install new return ductwork in the Galley
- Interlock MMB RTU to existing BAS
- Interlock Galley RTU to Kitchen Hood to prevent negative pressure
- Clean ductwork of dust and debris