Repair Floors L04/RDF Building at USCG C5ISC, Alexandria, VA - PSN 29848975
Forecast New Requirement Updated
- Agency
-
Coast Guard
Department of Homeland Security
- Solicitation expected
- Estimated value
- $350,000 to $500,000
- Set-aside
- Total Small Business
Forecast facts
- Anticipated award
- Through
- NAICS code
- 236210 Industrial Building Construction
- Place of performance
- Alexandria, VA
- Forecast number
- F2026074953
- Points of contact
-
- Robert Spangler robert.t.spangler@uscg.mil (571) 610-7286
Forecast details come from DHS's Acquisition Planning Forecast System. Agencies' dates and values are estimates.
About this forecast
The U.S. Coast Guard, part of the Department of Homeland Security, is forecasting a new Total Small Business requirement to repair floors in Building L04/RDF at USCG C5ISC in Alexandria, Virginia, with an estimated solicitation release on February 19, 2027. The work replaces cracked and water-damaged floor joists and failing sub-floor across impacted sections of the building, addressing systemic structural floor failures caused by excessive moisture accumulation and construction/engineering deficiencies. The procurement is a firm fixed price action under the Design/Build Construction Services II (Regional) (RMACC II) vehicle, with an estimated award date of May 11, 2027.
The estimated award value range is $350,000 to $500,000, with an estimated period of performance from May 11, 2027 through August 19, 2027. Place of performance is Alexandria, Virginia. Robert Spangler, Contracting Officer, is the primary point of contact (robert.t.spangler@uscg.mil, (571) 610-7286); CEU Cleveland is the contracting office, with requirements developed by the CEU Cleveland Design Team Bravo Supervisor under USCG/CG-SHORE.
Forecast text
Repair Floors L04/RDF Building at USCG C5ISC, Alexandria, VA - PSN 29848975
Project Scope:
This project addresses systemic structural floor failures in Building L04 caused by excessive moisture accumulation and construction/engineering deficiencies. The scope includes the replacement of cracked and water-damaged floor joists and the failing sub-floor across the impacted sections of the building.