Reconfigure Locker Room Hangar at AIRSTA Traverse City, Traverse City, MI PSN 10578118

Past New Requirement Updated

Agency
Solicitation expected
Estimated value
$500,000 to $1,000,000
Set-aside
No set-aside

Forecast facts

Anticipated award
Through
NAICS code
236210 Industrial Building Construction
Place of performance
Traverse City, MI
Forecast number
F2026073944
Points of contact

Forecast details come from DHS's Acquisition Planning Forecast System. Agencies' dates and values are estimates.

About this forecast

The U.S. Coast Guard is procuring industrial building construction services to reconfigure a locker room hangar at Air Station Traverse City, Michigan, through the Design/Build Construction Services II (Regional) (RMACC II) vehicle via CEU Cleveland, with solicitation release targeted for July 16, 2026 and award estimated for August 28, 2026. The scope includes partitioning the space into separate male and female personnel areas with dedicated restrooms, converting the existing battery storage room to general storage, installing a dedicated wet PPE hanging area with dehumidification, removing peeling paint from ductwork, reconfiguring the HVAC system, replacing existing lighting with new luminaires, upgrading plumbing and electrical systems including six electrical panels and transformers, and reconfiguring fire alarm and PA system components to accommodate the new layout.

The estimated award value ranges from $500,000 to $1,000,000, with the period of performance running from August 28, 2026 through February 12, 2027. Work is performed at Traverse City, Michigan. Robert Spangler, Contracting Officer at CEU Cleveland, serves as the primary point of contact at (571) 610-7286 or robert.t.spangler@uscg.mil.

Forecast text

Reconfigure Locker Room Hangar at AIRSTA Traverse City, Traverse City, MI PSN 10578118

Reconfigure the space to accommodate male and female personnel. The renovated locker

room shall include a small restroom for men and a small restroom for women. The existing

battery storage room shall be reconfigured as a storage room. The renovated space shall have a

separate area to hang wet PPE and dehumidification shall be provided for this area. Peeling

paint shall be removed from the existing ductwork within the renovated area. The existing

HVAC system shall be reconfigured to accommodate the new space. The new plumbing fixtures

shall be connected to the existing domestic hot and cold water and sanitary mains. The existing

lighting shall be replaced with new luminaires to accommodate the new layout of the space.

New convenience receptacles shall be provided. The existing fire alarm system and PA system

speakers shall be reconfigured to accommodate the new layout of the space. Replacement of 6

electrical panels and transformers shall be included in scope of work.