Ranger IV Vessel Construction Management
Forecast New Requirement Updated
- Agency
-
Department of Transportation
- Solicitation expected
- Estimated value
- $20,000,000 to $49,000,000
- Set-aside
- No set-aside
Forecast facts
- Anticipated award
- Through
- NAICS code
- 336611 Ship Building and Repairing
- Forecast number
- 52642
- Points of contact
-
- Digvijay Singh digvijay.singh@dot.gov
Forecast details come from the GSA Acquisition Gateway. Agencies' dates and values are estimates.
About this forecast
The Maritime Administration (MARAD), procuring on behalf of the National Park Service, seeks a qualified contractor to provide Vessel Construction Management services for the design development, construction, oversight, testing, and delivery of the new Ranger IV passenger and cargo vessel, which will replace M/V Ranger III and support operations at Isle Royale National Park. The contractor will support MARAD in refining vessel technical requirements, reviewing design documents, validating construction cost estimates, evaluating constructability, and providing technical and engineering oversight throughout shipyard construction, including quality assurance, inspections, system integration, commissioning, dock and sea trials, and final acceptance activities. The vessel must meet U.S. Coast Guard requirements and American Bureau of Shipping classification standards for unrestricted service, and the contractor will oversee technical documentation, as-built drawings, preventive maintenance plans, logistics and spare parts planning, and post-delivery warranty administration. The estimated solicitation release date is July 30, 2027, with an estimated award date of September 15, 2027.
The estimated award value ranges from $20 million to $49 million under a firm fixed price contract. The contract will span five years, extending from award on September 15, 2027, through vessel acceptance and the applicable warranty period, with the period of performance ending September 15, 2032. Digvijay Singh at digvijay.singh@dot.gov (U.S. Department of Transportation) is the point of contact.
Forecast text
The U.S. Department of Transportation’s Maritime Administration (MARAD), on behalf of the National Park Service (NPS), seeks a qualified contractor to provide Vessel Construction Management (VCM) services supporting the design development, construction, oversight, testing, and delivery of the new Ranger IV passenger and cargo vessel. Ranger IV will replace the existing M/V Ranger III and support passenger transportation, cargo delivery, and operational requirements at Isle Royale National Park. The contractor will support MARAD in refining vessel technical requirements, reviewing design documents, validating construction cost estimates, evaluating constructability, and overseeing shipyard construction to ensure the vessel meets NPS operational needs, applicable maritime regulations, and industry standards.
The contractor will provide technical and engineering oversight throughout vessel construction, including quality assurance, inspections, system integration, commissioning, dock and sea trials, and final acceptance activities. The vessel must meet applicable U.S. Coast Guard requirements and American Bureau of Shipping (ABS) classification standards for unrestricted service. Services will also include oversight of technical documentation, as-built drawings, preventive maintenance plans, logistics and spare parts planning, and post-delivery warranty administration. MARAD will manage the contract and coordinate NPS participation in design reviews, inspections, and acceptance activities. The anticipated project period is five years, with contractor support extending from contract award through vessel acceptance and the applicable warranty period.
On GovTribe