Peak-Load Generator Emissions Compliance Services at USCG Base Portsmouth
Forecast Recompete Updated
- Agency
-
Coast Guard
Department of Homeland Security
- Solicitation expected
- Estimated value
- $350,000 to $500,000
- Set-aside
- No set-aside
Forecast facts
- Anticipated award
- Through
- Acquisition strategy
- Follow-on to Existing Contract
- NAICS code
- 811310 Commercial and Industrial Machinery and Equipment (except Automotive and Electronic) Repair and Maintenance
- Place of performance
- Portsmouth, VA
- Forecast number
- F2026075360
- Points of contact
Forecast details come from DHS's Acquisition Planning Forecast System. Agencies' dates and values are estimates.
About this forecast
The U.S. Coast Guard, within the Department of Homeland Security, forecasts a recompete for peak-load generator emissions compliance services at USCG Base Portsmouth, with an estimated solicitation release on 2026-12-01 and an estimated award on 2027-02-01, although the additional information lists an anticipated award date of 2027-01-15. The contractor must provide all labor, materials, equipment, and supervision to service emissions control equipment, verify and calibrate monitoring systems, test and record required operating conditions, conduct emissions performance tests, and provide certified results and documentation demonstrating compliance with state air quality permit requirements.
The forecast estimates an award value range of $350,000 to $500,000 on a firm fixed price basis through a GSA Schedule vehicle, as a follow-on to an existing contract held by Dominion Energy, with no set-aside used and NAICS 811310 assigned. Place of performance is Portsmouth, VA. Malita M. Smith, Senior Field Contracting Officer at SILC-CON Specialization, serves as the contracting office point of contact at malita.m.smith@uscg.mil and (206) 827-1213, with Joe Cloonan of the United States Coast Guard also listed at joeseph.m.cloonan@uscg.mil and +12068150982, while the Engineering Services Division serves as the requirements office.
Forecast text
The Contractor shall provide all labor, materials, equipment, and supervision necessary to perform the work required for peak-load generators to pass applicable state emissions requirements. Work shall include servicing emissions control equipment, verifying and calibrating monitoring systems, testing and recording required operating conditions, conducting required emissions performance tests, and providing certified results and documentation needed to demonstrate compliance with state air quality permit requirements.
On GovTribe
Work this forecast
- Track it in your pipeline
- Find teaming partners
- Similar forecasts
- Ask GovTribe AI about this forecast