Otay Mesa Pedestrian Walkway Replacement

Past New Requirement Updated

Agency
Solicitation expected
Not on record
Estimated value
Up to $2,000,000
Set-aside
8(a) Sole Source

Forecast facts

Anticipated award
Through
NAICS code
236220 Commercial and Institutional Building Construction
Place of performance
Otay Mesa, CA
Forecast number
22763
Points of contact

Forecast details come from the GSA Acquisition Gateway. Agencies' dates and values are estimates.

About this forecast

The U.S. General Services Administration (GSA) Public Buildings Service (PBS) is seeking a general contractor to provide construction services for the replacement of the pedestrian walkway at the U.S. Land Port of Entry (USLPOE)-Otay Mesa Main Building in San Diego, CA. The contract will require the removal and replacement of approximately 11,240 square feet of existing exterior porcelain floor tiled walkway with new low embodied carbon concrete pavement, as well as surveying, material and soil testing, grading, drainage, erosion protection, and seal coating.

The contract will be funded in part by the Inflation Reduction Act of 2022 and contains specific requirements related to pricing, invoicing, submittals, materials, and construction. The contract will be awarded as an 8(a) sole source with an estimated award date of June 30, 2024. The place of performance is Otay Mesa, San Diego, CA.

Forecast text

 The Inflation Reduction Act of 2022 (IRA), Public Law No. 117-169, enacted in August 2022, provided the U.S. General Services Administration (GSA) with significant funding for: (a.) measures necessary to convert facilities to high-performance green buildings, (b.) acquisition and installation of construction materials and products with substantially lower levels of embodied greenhouse gas emissions, and (c.) emerging and sustainable technologies. The Contract resulting from this Solicitation will be funded in part by IRA appropriations, and it contains numerous IRA-specific requirements. Requirements include, but are not limited to, requirements regarding pricing, invoicing, submittals, materials, and construction. In addition, please note that this Solicitation contains an evaluation factor favoring certain construction materials with the lowest possible levels of embodied carbon. Offerors shall
carefully review this Solicitation, the Agreement, the Statement of Work, the Specifications, and the Drawings. Offerors are responsible for accurately pricing and, if successful, fully performing all Contract requirements.


The U.S. General Services Administration (GSA) Public Buildings Service (PBS) Pacific Rim Region San Diego Field Office (SDFO) is seeking the professional services of a General Contractor (GC) to provide construction for the “GSA/SDFO-Otay Mesa Main Building Pedestrian Walkway Replacement Construction Services-CA0267JJ” project at the U.S. Land Port of Entry (USLPOE)-Otay Mesa Main Building.


The USLPOE is located at 2500 Paseo Internacional, San Diego, CA 92154. It consists of consists of eight (8) buildings totaling 316,637 gross square feet. The Main Building was built in 1984 and a remodel project was completed in 2024. Its exterior requires a walkway replacement due to many cracks, chipped paversc, and missing tiles.


This contract will be to provide construction for the entire campus: (a.) removal, disposal, and structural replacement of approximately: eleven thousand two hundred and forty (11,240) square feet (sq. ft.) of existing exterior porcelain floor tiled walkway with new low embodied carbon concrete pavement at the USLPOE-Otay Mesa Main Building as per the attached construction
document in order to properly and safely execute port operations. This non-recurring, non-prospectus work includes surveying, material and soil testing, grading, drainage, erosion protection, seal coating, order to create an easily accessible and safe space for officers and general public.

On GovTribe