Modification to Order #N00164259G083 - SLCM-N Missile Long Lead Material for Leidos
Past New Requirement Updated
- Agency
-
Navy NAVSEA NSWC Crane Division
Naval Sea Systems Command, Department of Defense
- Solicitation expected
- Estimated value
- $7,500,000 to $50,000,000
- Set-aside
- No set-aside
Forecast facts
- Anticipated award
- NAICS code
- 541715 Research and Development in the Physical, Engineering, and Life Sciences (except Nanotechnology and Biotechnology)
- Place of performance
- Crane, IN
- Forecast number
- N00164-26-RFPREQ-CR-GXL-0017
Forecast details come from the Navy's Long Range Acquisition Estimates. Agencies' dates and values are estimates.
About this forecast
Naval Sea Systems Command Naval Surface Warfare Center Crane Division is procuring long lead material to support Fly-Off #1 test objectives for the SLCM-N missile program through a modification to Order #N00164259G083 with Leidos, with solicitation estimated to release January 1, 2026 and award estimated for April 1, 2026. The procurement uses Other Transaction Authority as the contracting instrument and is structured as a sole-source, fixed-price engagement requiring Top Secret facility and personnel clearances.
Award value is estimated between $7.5 million and $50 million, with performance at Naval Surface Warfare Center Crane Division in Crane, Indiana. The contracting office is N00164 (NSWCCR), and the procurement falls under PSC AC24 (National Defense R&D Services; Atomic Energy Defense Activities; R&D Administrative Expenses), classified under NAICS 541715 (Research and Development in the Physical, Engineering, and Life Sciences).
Forecast text
Long Lead material to support Fly-Off #1 test objectives