MIO GALICE 2 BRIDGE (SO Engineering Project)
Forecast New Requirement Updated
- Agency
-
Department of the Interior
- Solicitation expected
- Estimated value
- $2,000,000 to $4,900,000
- Set-aside
- Not on record
Forecast facts
- Anticipated award
- Not on record
- NAICS code
- 237310 Highway, Street, and Bridge Construction
- Place of performance
- OR
- Forecast number
- 56210
- Points of contact
-
- Bonnie M. Million bmillion@blm.gov
Forecast details come from the GSA Acquisition Gateway. Agencies' dates and values are estimates.
About this forecast
The Department of the Interior is forecasting a new requirement, funded by the Bureau of Land Management, to replace Galice Creek Bridge #2 under the MIO GALICE 2 BRIDGE engineering project (NAICS 237310, Highway, Street, and Bridge Construction), with an estimated solicitation release date of January 1, 2027. The existing 1951 bridge was load-restricted to 25 tons in 2017 and serves timber haul operations, emergency response, and public access, supporting the Administration's priorities for forest management, domestic timber production, wildfire resilience, and stewardship of public lands. Failure to replace the structure would constrain active management of federal and private timber, impede wildfire suppression, and increase long-term deferred maintenance liabilities.
The estimated award value range is $2.0 million to $4.9 million. Work is performed in Oregon, USA. The point of contact is Bonnie M. Million, Assistant Field Manager, Natural Resources, Bureau of Land Management, bmillion@blm.gov.
Forecast text
This project is for the replacement of Galice Creek Bridge #2. It is a critical infrastructure investment that supports the Administration's priorities for forest management, domestic timber production, wildfire resilience, and stewardship of public lands. The existing 1951 bridge was load-restricted to 25 tons in 2017 and serves as a key transportation corridor for timber haul operations, emergency response, and public access. Failure to replace this structure will constrain active management of federal and private timber, impede wildfire suppression efforts, and increase long term deferred maintenance liabilities.
On GovTribe
Work this forecast
- Track it in your pipeline
- Find teaming partners
- Similar forecasts
- Ask GovTribe AI about this forecast