LORAN Station (former) Yap LTM (Post Cleanup Monitoring)

Forecast New Requirement Updated

Agency
Solicitation expected
Estimated value
$1,000,000 to $2,000,000
Set-aside
No set-aside

Forecast facts

Anticipated award
Through
NAICS code
562910 Remediation Services
Place of performance
Colonia, Yap, FM
Forecast number
F2026075493
Points of contact

Forecast details come from DHS's Acquisition Planning Forecast System. Agencies' dates and values are estimates.

About this forecast

The U.S. Coast Guard, part of the Department of Homeland Security, forecasts a new requirement for post-cleanup monitoring at the former LORAN Station Yap, with an estimated solicitation release date of April 1, 2027. The work supports a supplemental Remedial Investigation following the December 2025 RI Report and includes removing 400 cubic yards of lead- and PCB-contaminated soil from specified DUs and DAs in Area A, followed by confirmation sampling. Additional tasks include multi-increment sediment sampling in Landfill-1, biota sampling inside and outside the Maakiy Causeway to track declining PCB concentrations, and inspection and removal of debris marked during the last investigation. The estimated award date is June 1, 2027.

The estimated award value range is $1.0 million to $2.0 million, under a firm fixed price contract type through the Architecture and Engineering Services III contract vehicle, with no set-aside used. The estimated period of performance runs from June 1, 2027 through September 30, 2028, and performance is in Colonia, Yap, Micronesia. Points of contact are Matthew Casey, Environmental Engineer, at matthew.c.casey@uscg.mil or (206) 820-3967, and alternate contact Anthony Laycock at anthony.j.laycock@uscg.mil or (571) 610-6507.

Forecast text

The objectives at LORAN Station Yap are to perform a supplemental Remedial Investigation (RI) following the recommendations detailed in the December 2025 RI Report. This will be accomplished through the following actions:

1. Removal of 400cy of lead and PCB contaminated soils from specific DUs and DAs in Area A. This will be followed by confirmation sampling.

2. Multi-Increment sampling of sediment from specific DUs in Landfill-1 to track the anticipated decline of PCB concentrations.

3. Biota sampling from both inside and outside the Maakiy Causeway to track the anticipated decline of PCB concentrations.

4. Inspect and remove debris that was marked and left during the last investigation.