About this forecast

The Department of the Interior is forecasting a design-build contract, funded by the Bureau of Land Management, to redesign the existing Little Creek Campground in Utah, with solicitation release estimated for April 1, 2027. The redesign addresses site erosion, traffic circulation, campsite sun exposure, and limited parking, and includes replacing a deteriorated wood-framed group pavilion with a metal pavilion, adding metal shade structures at each campsite, replacing the potable water system with hydrants throughout the campsites and landscape irrigation for shade trees, and improving group site parking for large RVs and trailers. The design calls for two ABA-compliant campsites with accessible pathways to restrooms, picnic tables, and fire pits, two accessible pathways to ABA-compliant tent pads, accessible group site picnic tables, and a concrete accessible walkway connecting the group site to the main parking lot, and the campground must keep restrooms, picnic tables, potable water, and adequate parking in place to continue collecting fees.

The estimated award value range is $500,000 to $999,000, classified under NAICS 238910, Site Preparation Contractors. Place of performance is Utah, USA. Point of contact is Chad D. Kunz, Contracting Officer's Representative, Bureau of Land Management, reachable at ckunz@blm.gov or +1-435-979-7711.

Forecast text

This project will award a design-build contract to redesign the existing Little Creek Campground to address site erosion, traffic circulation, sun exposure at campsites, and limited parking within the campground. The work will include replacing a deteriorated wood-framed group pavilion with a new metal pavilion, along with new metal shade structures at each campsite. The existing potable water system will be replaced and will provide hydrants throughout the campsites as well as landscape irrigation for shade trees. Group site parking will be improved to allow easier access for the large RVs and trailers that frequent the site. In order to collect fees at this site, the Salt Lake Field Office must maintain specific amenities such as restrooms, picnic tables, potable water, and adequate parking. Fees collected at this site will be used to maintain the infrastructure and support annual operational costs. This project will allow the SLFO to provide high-quality recreation opportunities to the public in highly visited areas. This campground is being designed to provide two ABA compliant campsites with accessible pathways to restrooms, picnic tables, and fire pits along with two accessible pathways to ABA compliant tent pads. The group site will have accessible picnic tables and is connected to the main parking lot by a concrete accessible walk-way.  This campground meets all requirements of the Architectural Barriers Act for the number of campsites provided.