Little Creek Campground Design-Build
Forecast New Requirement Updated
- Agency
-
Bureau of Land Management
Department of the Interior
- Solicitation expected
- Estimated value
- $500,000 to $999,000
- Set-aside
- Not on record
Forecast facts
- Anticipated award
- Not on record
- NAICS code
- 238910 Site Preparation Contractors
- Place of performance
- UT
- Forecast number
- 56127
- Points of contact
-
- Chad Kunz ckunz@blm.gov
Forecast details come from the GSA Acquisition Gateway. Agencies' dates and values are estimates.
About this forecast
The Department of the Interior's Bureau of Land Management is forecasting a design-build contract to redesign the existing Little Creek Campground, with solicitation release estimated for December 1, 2026. The work addresses site erosion, traffic circulation, campsite sun exposure, and limited parking by replacing a deteriorated wood-framed group pavilion with a metal pavilion, adding metal shade structures at each campsite, replacing the potable water system with hydrants throughout the campsites and landscape irrigation for shade trees, and improving group site parking for large RVs and trailers. The campground must retain restrooms, picnic tables, potable water, and adequate parking to collect fees, and the design includes two ABA compliant campsites with accessible pathways and two accessible pathways to ABA compliant tent pads.
The estimated award value range is $500,000 to $999,000. The Salt Lake Field Office secured a $1 million cost-reimbursable grant from the Utah Division of Outdoor Recreation, and BLM must initially fund the work before the State of Utah reimburses it upon project completion. Place of performance is Utah, USA. The point of contact is Chad Kunz, Contracting Officer's Representative, at ckunz@blm.gov or +1 435-979-7711.
Forecast text
This project will award a design-build contract to redesign the existing Little Creek Campground to address site erosion, traffic circulation, sun exposure at campsites, and limited parking within the campground. The work will include replacing a deteriorated wood-framed group pavilion with a new metal pavilion, along with new metal shade structures at each campsite. The existing potable water system will be replaced and will provide hydrants throughout the campsites as well as landscape irrigation for shade trees. Group site parking will be improved to allow easier access for the large RVs and trailers that frequent the site. The Salt Lake Field Office secured a $1,000,000.00 cost-reimbursable grant from the Utah Division of Outdoor Recreation to accomplish this work. The BLM must initially fund the work, after which the State of Utah will provide reimbursement once the project is complete. In order to collect fees at this site, the Salt Lake Field Office must maintain specific amenities such as restrooms, picnic tables, potable water, and adequate parking. Fees collected at this site will be used to maintain the infrastructure and support annual operational costs. This project will allow the SLFO to provide high-quality recreation opportunities to the public in highly visited areas. This campground is being designed to provide two ABA compliant campsites with accessible pathways to restrooms, picnic tables, and fire pits along with two accessible pathways to ABA compliant tent pads. The group site will have accessible picnic tables and is connected to the main parking lot by a concrete accessible walk-way. This campground meets all requirements of the Architectural Barriers Act for the number of campsites provided.
On GovTribe
Work this forecast
- Track it in your pipeline
- Find teaming partners
- Similar forecasts
- Ask GovTribe AI about this forecast