Krome Service Processing Center (SPC) - Bldg. 1 Visitation & Bldg. 11 Dormitory Fire Sprinkler System Installation

Past New Requirement Updated

Agency
Solicitation expected
Estimated value
$500,000 to $1,000,000
Set-aside
Competitive 8(a)

Forecast facts

Anticipated award
Through
NAICS code
238220 Plumbing, Heating, and Air-Conditioning Contractors
Place of performance
Miami, FL
Forecast number
F2024065915
Points of contact

Forecast details come from DHS's Acquisition Planning Forecast System. Agencies' dates and values are estimates.

About this forecast

The contract opportunity is for the installation of a fire suppressing sprinkler system in the Bldg. 1 visitation area and Bldg. 11 dormitory at the Krome Service Processing Center in Miami, Florida. The contractor will be responsible for providing all materials, labor, tools, and equipment necessary to deliver, install, and test the new fire sprinkler system. The work must meet or exceed the standards set forth in the International Building Code and applicable Federal Government Standards. The estimated solicitation release date is April 30, 2024, and the estimated award date is June 3, 2024.

The estimated award value range for this contract is $500,000 to $1,000,000. The contractor will be required to develop a work and safety plan, protect adjacent surfaces and equipment, and maintain a clean and orderly work site throughout the project. The contract will be set aside for competitive 8(a) businesses.

Forecast text

The purpose of this Project is installation of a fire suppressing sprinkler system in the Bldg. 1 visitation area and Bldg. 11 dormitory. Contractor shall provide all materials, labor, tools, equipment and daily supervision required to deliver, install and test the newly installed fire suppressing sprinkler system. Contractor shall field verify all conditions pertaining to this project prior to starting any work. Any discrepancies between field conditions and the statement of work (SOW) shall be immediately brought up to the Contracting Officer's Representative (COR) attention. All work shall meet or exceed the minimum standards as set forth in the current edition of the International Building Code and any applicable Federal Government Standards. Whichever document is more stringent.

All work shall conform to the most current regulation of the Occupational Safety and Health Administration (OSHA).

Contractor shall ensure all employees (contractor and sub-contractor) use appropriate protective clothing and equipment at all times.

Contractor shall develop a work and safety plan and adhere to it. Plan shall be reviewed by ICE upon request.

Contractor shall maintain all safety measures during work to protect agency personnel, people in general and adjacent property.

Contractor shall protect all adjacent surfaces, furnishings and equipment during the performance of the project.

The Contractor shall be held responsible for all damages directly related to the work.

Contractor shall keep work areas clean and free of debris at all times.

Contractor shall not store materials or equipment in any area other than those designated by the agency and the COR. All the equipment and materials related to the project are the Contractor’s responsibility to secure daily. The Government shall not be liable for equipment and/or materials that get damaged or stolen from the work area.

All submittals and proposed methods for making the necessary installations shall be approved by the COR prior to the commencement of any work.

All workspace, staging areas, areas used for moving materials, trash, tools, etc. are to be kept clean at all times. All trash from the day’s work is to be removed and the work site clean and orderly.

Contractor shall contact the COR upon completion of the work to schedule the final inspection and acceptance.

On GovTribe

Work this forecast

  • Track it in your pipeline
  • Find teaming partners
  • Similar forecasts
  • Ask GovTribe AI about this forecast