Honolulu (HNL) Institutional Removal Program (IRP) Facility Exterior Repair and Painting

Past New Requirement Updated

Agency
Solicitation expected
Estimated value
$500,000 to $1,000,000
Set-aside
Competitive 8(a)

Forecast facts

Anticipated award
Through
NAICS code
238320 Painting and Wall Covering Contractors
Place of performance
Honolulu, HI
Forecast number
F2024066823
Points of contact

Forecast details come from DHS's Acquisition Planning Forecast System. Agencies' dates and values are estimates.

About this forecast

The federal contract opportunity is for the repair and painting of the exterior surfaces at the Honolulu (HNL) Institutional Removal Program (IRP) Facility, which includes three buildings, four sections of perimeter walls, one carport, and three storage containers. The Contractor shall provide all required designs, parts, materials, qualified labor, equipment, tools, training, transportation, and supervision necessary to complete the required work. The estimated solicitation release date is July 26, 2024, and the estimated award date is September 13, 2024.

The estimated award value range for this Competitive 8(a) set-aside contract is $500,000 to $1,000,000. The Contractor and its employees shall perform all work in compliance with Local, State, and Federal Codes, Regulations, and Policies. The work will take place at the Honolulu, HI location, and the Contractor is responsible for providing employees who are trained, certified, and licensed as required to perform the assigned work.

Forecast text

Repair and paint all exterior surfaces at the HNL IRP Facility which includes three buildings, four sections of perimeter walls, one carport, and three storage containers. The Contractor shall provide all required designs, parts, materials, qualified labor, equipment, tools, training, transportation, and supervision necessary to complete the required work. The Contractor and its employees shall perform all work in compliance with Local, State and Federal Codes, Regulations and Policies. The Contractor is responsible for providing employees who are trained, certified, and licensed as required to perform the work that they are assigned to perform.

ASBESTOS DISCLOSURE: The Facility was constructed prior to January 1, 1981. Under the Occupational Exposure to Asbestos Rule ("Rule") [59 Fed. Reg. 40963 (Aug. 10, 1994)] promulgated by the U.S. Occupational Health and Safety Administration ("OSHA"), every building constructed prior to 1981 is presumed to have asbestos-containing materials ("ACM") in the building. In addition to the presumption set out in the Rule, the Office of Asset and Facility Management has obtained an Asbestos Survey ("Report") with respect to the Facility that notes the existence and location of ACM in the Building. The Report indicates certain activities that reasonably would be expected to cause a release of asbestos fibers and should be avoided. Those activities include, but are not limited to, (i) cutting or drilling into the ACM; (ii) attaching anything to the ACM with nails or pins; (iii) sanding or moving the ACM; or (iv) bumping into or rubbing against ACM.