FY26 Pisgah South Ranger District Ditch Culvert Replacements and Road Reconditioning
Past New Requirement Updated
- Agency
-
Department of Agriculture
- Solicitation expected
- Estimated value
- $2,000,000 to $4,900,000
- Set-aside
- No set-aside
Forecast facts
- Anticipated award
- NAICS code
- 237310 Highway, Street, and Bridge Construction
- Forecast number
- 46461
- Points of contact
-
- Ashley Thompson sm.fs.smallbusiness@usda.gov
Forecast details come from the GSA Acquisition Gateway. Agencies' dates and values are estimates.
About this forecast
The Department of Agriculture's Pisgah South Ranger District is seeking contractors to perform ditch culvert replacements and road reconditioning work on the South Roads of the Pisgah Ranger District. The project scope includes installation of 24-inch aluminized corrugated metal ditch relief pipes (CMP), removal and disposal of existing culverts, ditch reshaping and reforming for positive drainage, rip-rap for outlet structures, and sediment and erosion control measures including sediment traps, lined ditches, drop inlets, catch basins, and flanged culvert inlets, along with headwall construction and road elevation alterations involving excavation and backfill work. The estimated solicitation release date is September 30, 2026, with an estimated award date of June 30, 2026.
The estimated award value ranges from $2,000,000 to $4,900,000, with a basic exercised value of $4,096,811. This procurement is being conducted as a full and open competition without any set-asides and will be awarded as a purchase order to a contractor specializing in highway, street, and bridge construction (NAICS 237310). Interested parties should direct inquiries to the United States Department of Agriculture's Small Business office at sm.fs.smallbusiness@usda.gov, with the project located in Region 08.
Forecast text
Project located on South Roads of the Pisgah Ranger District. The road reconditioning ditch relief culvert installations/replacements contract will include all associated work related to the installation of 24 inch aluminized corrugated metal ditch relief pipes (CMP) removal and disposal of existing culverts off government land reshaping/reforming ditches for positive drainage rip-rap for outlet structures and sediment and erosion control sediment traps lined ditches drop inlets catch basins flanged culvert inlets headwalls road elevation alterations excavation and backfill
On GovTribe
Work this forecast
- Track it in your pipeline
- Find teaming partners
- Similar forecasts
- Ask GovTribe AI about this forecast