Electromagnetic Aircraft Launch System (EMALS) Production - CVN 81 ECP-I-EMALS-0025R1 Transformer-Rectifier (T/R) Fuse Fault Detection
Past New Requirement Updated
- Agency
-
Naval Air Systems Command HQ
Naval Air Systems Command, Department of Defense
- Solicitation expected
- Estimated value
- Up to $2,000,000
- Set-aside
- No set-aside
Forecast facts
- Anticipated award
- NAICS code
- 336413 Other Aircraft Parts and Auxiliary Equipment Manufacturing
- Place of performance
- Pax River, MD
- Forecast number
- N00019-26-RFPREQ-TPM251-0247
Forecast details come from the Navy's Long Range Acquisition Estimates. Agencies' dates and values are estimates.
About this forecast
Naval Air Systems Command is procuring Fuse Fault Detection system modifications for the Electromagnetic Aircraft Launch System (EMALS) Transformer-Rectifier on CVN 81 under Engineering Change Proposal ECP-I-EMALS-0025R1, with solicitation estimated for release on 1 January 2026 and award targeted for 1 October 2026. The modification addresses deficiencies identified in System Functional Demonstration, Ship Certification, and Component-Level Shock Test activities, with implementation essential to resolving technical and operational compliance issues and improving overall system reliability.
Award value is estimated not to exceed $2 million under a fixed-price "C" type contract on a sole-source procurement basis. Performance takes place at 47123 Buse Rd #540, Patuxent River, Maryland 20670. The requirement falls under NAICS 336413 (Other Aircraft Parts and Auxiliary Equipment Manufacturing) and PSC 1710 (Aircraft Landing Equipment); contractor facility clearance at the Secret level and personnel clearance at the Top Secret level are required.
Forecast text
To enhance system reliability and address critical deficiencies, ECP-I-EMALS-0025R1 will be implemented to correct System Functional Demonstration (SFD), Ship Certification and Component-Level Shock Test deficiencies related to Fuse Fault Detection in the Electromagnetic Aircraft Launch System (EMALS) Transformer-Rectifier (T/R) for CVN 81. This implementation is essential to resolving identified issues, ensuring compliance with technical and operational requirements and improving system performance.