Electromagnetic Aircraft Launch System (EMALS) / Advanced Arresting Gear (AAG) Production - CVN 81 Installation and Checkout (INCO) Spares
Past New Requirement Updated
- Agency
-
Naval Air Systems Command HQ
Naval Air Systems Command, Department of Defense
- Solicitation expected
- Estimated value
- Not on record
- Set-aside
- No set-aside
Forecast facts
- Anticipated award
- Through
- NAICS code
- 336413 Other Aircraft Parts and Auxiliary Equipment Manufacturing
- Place of performance
- Pax River, MD
- Forecast number
- N00019-24-RFPREQ-TPM251-0133
Forecast details come from the Navy's Long Range Acquisition Estimates. Agencies' dates and values are estimates.
About this forecast
The Naval Air Systems Command is procuring Electromagnetic Aircraft Launch System (EMALS) and Advanced Arresting Gear (AAG) Installation and Checkout (INCO) spares for integration into the CVN 81 production contract, with estimated solicitation release on 2026-01-01 and award on 2027-01-01. These spares will support the efficient installation, testing, and commissioning of these advanced technologies to ensure seamless system integration and successful delivery of mission-critical capabilities for CVN 81. The procurement is structured as a sole-source, fixed-price "C" type contract with a 60-month period of performance.
Work will be performed at Patuxent River, Maryland. Personnel holding Top Secret clearances are required, and facility Secret clearance is needed. The procurement falls under NAICS 336413 (Other Aircraft Parts and Auxiliary Equipment Manufacturing) with PSC code 1710 (Aircraft Landing Equipment), and is forecasted for award in fiscal quarter FY27 Q2.
Forecast text
In order to enhance operational readiness and ensure seamless integration of critical systems, Electromagnetic Aircraft Launch System (EMALS) and Advanced Arresting Gear (AAG) Installation and Checkout (INCO) Spares will be incorporated into the CVN 81 Production Contract. This strategic addition supports the efficient installation, testing and commissioning of these advanced technologies, aligning with program objectives and ensuring the successful deliver of mission critical capabilities for CVN 81.
On GovTribe
Work this forecast
- Track it in your pipeline
- Find teaming partners
- Similar forecasts
- Ask GovTribe AI about this forecast