Eagle Pier New Dredging at New London’s City Pier, Connecticut
Past New Requirement Updated
- Agency
-
Coast Guard
Department of Homeland Security
- Solicitation expected
- Estimated value
- $2,000,000 to $5,000,000
- Set-aside
- Total Small Business
Forecast facts
- Anticipated award
- Through
- NAICS code
- 237990 Other Heavy and Civil Engineering Construction
- Place of performance
- New London, CT
- Forecast number
- F2026074421
- Points of contact
-
- Michael Carosotto michael.p.carosotto@uscg.mil (571) 608-9991
Forecast details come from DHS's Acquisition Planning Forecast System. Agencies' dates and values are estimates.
About this forecast
The Department of Homeland Security US Coast Guard is procuring dredging services at Eagle Pier in New London, Connecticut under a Total Small Business set-aside Firm Fixed Price contract, with solicitation release estimated July 31, 2026 and award anticipated October 1, 2026. The scope includes dredging approximately 3,700 cubic yards of spoil to a depth of 17.0 feet at Mean Lower Low Water plus 2.0 feet overdredging allowance, removal of approximately 50 underwater piles with remaining piles cut at 21.0 feet MLLW, and transport of dredge material to an upland disposal site. Dredging is restricted to Connecticut's seasonal environmental window of October 1 through March 1.
The estimated award value ranges from $2 million to $5 million, with performance scheduled from October 1, 2026 through March 31, 2027 at New London, Connecticut. CEU Providence serves as the contracting office. Michael Carosotto, Technical Director, is the requirements point of contact (michael.p.carosotto@uscg.mil, 571-608-9991), and Sean Waldron (sean.e.waldron@uscg.mil, 401-318-3344) is the small business set-aside coordinator.
Forecast text
This project dredges a new area immediately south of Coast Guard Cutter EAGLE’s new berth at New London’s City Pier, Connecticut. The intent is to deepen the area to allow tug boats to assist the cutter for mooring/unmooring at all tide levels. Requirements of the design specify dredging to a depth of -17.0’ at Mean Lower Low Water (MLLW) +2.0’ overdredging allowance. This equates to approximately 3,700 cubic yards (CY) of dredge spoils to removed to an upland disposal site. Offshore disposal is not permitted due to environmental sample analysis of the dredge area. There is an environmental time of year restriction in Connecticut that only permits dredging activities between October 1st and March 1st. The scope of work also includes removals of approximately 50 piles that remain below the waterline. Any piles that cannot be fully removed are to be cut at -21.0’ MLLW.