Design/Build Substation with Step-Up Transformer
Past New Requirement Updated
- Agency
- Not on record
- Solicitation expected
- Estimated value
- Up to $500,000
- Set-aside
- No set-aside
Forecast facts
- Anticipated award
- Not on record
- NAICS code
- 238210 Electrical Contractors and Other Wiring Installation Contractors
- Place of performance
- Fairbanks, AK
- Forecast number
- 21124
- Points of contact
Forecast details come from the GSA Acquisition Gateway. Agencies' dates and values are estimates.
About this forecast
The forecasted federal contract opportunity is for the design and build of a relocatable electrical substation with a step-up transformer. The key objectives are to provide the necessary equipment and power cable to enable the use of the station's existing 480 Volt portable engine-generator to serve 4160 Volt electrical distribution on the ridge and at other locations, for powering critical loads if normal electrical service is disabled. The estimated solicitation release date is March 15, 2023.
The contract does not include a set-aside, and the place of performance is Fairbanks, Alaska. The numerical details and budget range are not provided in the forecast, but the scope includes a relocatable transformer, terminations, and power cable to support the critical electrical distribution needs in the event of a power outage.
Forecast text
Provides a relocatable transformer; terminations; and power cable to enable use of the station's existing 480 Volt portable engine-generator to serve 4160 Volt electrical distribution on the ridge and at other locations; for powering critical loads if normal electrical service is disabled.
On GovTribe
Work this forecast
- Track it in your pipeline
- Find teaming partners
- Similar forecasts
- Ask GovTribe AI about this forecast