Design/Build Substation with Step-Up Transformer

Past New Requirement Updated

Agency
Solicitation expected
Estimated value
$251,000 to $500,000
Set-aside
No set-aside

Forecast facts

Anticipated award
Through
NAICS code
238210 Electrical Contractors and Other Wiring Installation Contractors
Place of performance
Fairbanks, Alaska, United States
Forecast number
30150
Points of contact

Forecast details come from the Commerce Department's procurement forecast. Agencies' dates and values are estimates.

About this forecast

The National Oceanic and Atmospheric Administration (NOAA) is seeking a design/build substation contract with a step-up transformer for electrical infrastructure. The project involves providing a relocatable transformer, terminations, and power cable to enable the use of an existing 480 Volt portable engine-generator to serve 4160 Volt electrical distribution at critical load locations. The estimated solicitation release date is February 14, 2023, with an anticipated contract award date of May 14, 2023.

The estimated contract value ranges between $251,000 and $500,000, targeting electrical contractors within NAICS code 238210. The place of performance is located in Fairbanks, Alaska, with the contract being competitively bid and managed through NOAA's National Environmental Satellite, Data and Information Services (NESDIS) office. The primary point of contact for this opportunity is Stacey Hurcombe, a Program Analyst, who can be reached at stacey.hurcombe@noaa.gov for further information about the project.

Forecast text

Provides a relocatable transformer, terminations, and power cable to enable use of the station's existing 480 Volt portable engine-generator to serve 4160 Volt electrical distribution on the ridge and at other locations, for powering critical loads if normal electrical service is disabled.