DBB Construction; MACC TO; PE20E10M; Repair Las Pulgas Landfill Phase 1 and 2 Liner (C)

Past New Requirement Updated

Agency
Solicitation expected
Not on record
Estimated value
$7,500,000 to $50,000,000
Set-aside
No set-aside

Forecast facts

Anticipated award
NAICS code
237990 Other Heavy and Civil Engineering Construction
Place of performance
San Diego, Ca Navafac Sw
Forecast number
N62473-26-RFPREQ-SW-CORE-0356

Forecast details come from the Navy's Long Range Acquisition Estimates. Agencies' dates and values are estimates.

About this forecast

The Department of the Navy Naval Facilities Engineering Command Southwest is procuring construction services to repair the Las Pulgas Landfill Phase 1 and 2 liner systems, with an estimated award date of April 1, 2026. The work includes removal of the failed Phase I toe and slope liner systems, the compromised interface with the Phase II slope liner, the complete Leachate Collection and Removal System (LCRS), and the associated LCRS subdrain system, followed by reconstruction of the toe and slope liner systems and reinstallation of the LCRS with its subdrain system in full compliance with the Corrective Action Plan and San Diego Regional Water Quality Control Board Waste Discharge Requirements, Order No. R9-2011-039. This is a single-award indefinite-delivery, fixed-price procurement.

The estimated award value range is $7.5 million to $50 million. Performance takes place at 750 Pacific Highway, San Diego, California 92132. NAVFAC Southwest (UIC N62473) is the contracting office, and the procurement is structured as a competitive multiple award IDIQ delivery order vehicle for awards between $10 million and $50 million.

Forecast text

This project will remove the failed Las Pulgas Landfill Phase I toe and slope liner

systems, the compromised interface with the Phase II slope liner, the complete

Leachate Collection and Removal System (LCRS), and the associated LCRS subdrain

system. Following removal, the toe and slope liner systems will be reconstructed and

the LCRS with its subdrain system reinstalled in full compliance with the Corrective

Action Plan (CAP) and the San Diego Regional Water Quality Control Board (RWQCB)

Waste Discharge Requirements, Order No. R9-2011-039.