DBB Construction; MACC TO; PE20E10M; Repair Las Pulgas Landfill Phase 1 and 2 Liner (C)
Past New Requirement Updated
- Agency
-
Navy NAVFAC Southwest
Naval Facilities Engineering Command, Department of Defense
- Solicitation expected
- Not on record
- Estimated value
- $7,500,000 to $50,000,000
- Set-aside
- No set-aside
Forecast facts
- Anticipated award
- NAICS code
- 237990 Other Heavy and Civil Engineering Construction
- Place of performance
- San Diego, Ca Navafac Sw
- Forecast number
- N62473-26-RFPREQ-SW-CORE-0356
Forecast details come from the Navy's Long Range Acquisition Estimates. Agencies' dates and values are estimates.
About this forecast
The Department of the Navy Naval Facilities Engineering Command Southwest is procuring construction services to repair the Las Pulgas Landfill Phase 1 and 2 liner systems, with an estimated award date of April 1, 2026. The work includes removal of the failed Phase I toe and slope liner systems, the compromised interface with the Phase II slope liner, the complete Leachate Collection and Removal System (LCRS), and the associated LCRS subdrain system, followed by reconstruction of the toe and slope liner systems and reinstallation of the LCRS with its subdrain system in full compliance with the Corrective Action Plan and San Diego Regional Water Quality Control Board Waste Discharge Requirements, Order No. R9-2011-039. This is a single-award indefinite-delivery, fixed-price procurement.
The estimated award value range is $7.5 million to $50 million. Performance takes place at 750 Pacific Highway, San Diego, California 92132. NAVFAC Southwest (UIC N62473) is the contracting office, and the procurement is structured as a competitive multiple award IDIQ delivery order vehicle for awards between $10 million and $50 million.
Forecast text
This project will remove the failed Las Pulgas Landfill Phase I toe and slope liner
systems, the compromised interface with the Phase II slope liner, the complete
Leachate Collection and Removal System (LCRS), and the associated LCRS subdrain
system. Following removal, the toe and slope liner systems will be reconstructed and
the LCRS with its subdrain system reinstalled in full compliance with the Corrective
Action Plan (CAP) and the San Diego Regional Water Quality Control Board (RWQCB)
Waste Discharge Requirements, Order No. R9-2011-039.