Construction Inspection Services for Utility Energy Services Contract (UESC) at USCG Base Kodiak
Past New Requirement Updated
- Agency
-
Coast Guard
Department of Homeland Security
- Solicitation expected
- Estimated value
- $500,000 to $1,000,000
- Set-aside
- No set-aside
Forecast facts
- Anticipated award
- Through
- NAICS code
- 541330 Engineering Services
- Place of performance
- Kodiak, AK
- Forecast number
- F2025072072
- Points of contact
-
- Malita Smith malita.m.smith@uscg.mil (206) 827-1213
- David Allen Smith david.a.smith6@uscg.mil (206) 827-3537
Forecast details come from DHS's Acquisition Planning Forecast System. Agencies' dates and values are estimates.
About this forecast
The U.S. Coast Guard is procuring continuous, independent construction inspection services for USCG Base Kodiak under a Utility Energy Services Contract (UESC), with solicitation release estimated for December 31, 2025 and award anticipated by June 30, 2026. The contractor will oversee Energy Service Company (ESCO) compliance across electrical, mechanical, civil, and utility infrastructure disciplines—including boiler and steam systems, building envelopes, electrical distribution, and process systems upgrades—ensuring adherence to technical specifications, design documents, safety protocols, and USCG requirements throughout the approximately 24-30 month construction duration from site preparation through equipment installation, commissioning, and acceptance.
The estimated contract value ranges from $500,000 to $1,000,000 under a firm fixed price contract on a GSA Schedule vehicle. Performance occurs in Kodiak, Alaska, with the contractor required to provide daily updates to the Contracting Officer Representative throughout the project. Contracting Officer Malita Smith (malita.m.smith@uscg.mil, 206-827-1213) and alternate contact David Allen Smith (david.a.smith6@uscg.mil, 206-827-3537) are available for inquiries.
Forecast text
The Contractor shall provide continuous, independent construction inspection services (CI) to ensure compliance that the Energy Service Company (ESCO) and its subcontractors meet technical specifications, design documents, safety protocols, and USCG requirements for all ECMs implemented under the Base Kodiak UESC. These measures range across multiple disciplines, electrical, mechanical, civil, and utility infrastructure, and include boiler and steam system upgrades, building envelope improvements, electrical distribution enhancements, and process system upgrades.
Coordination between all projects is necessary. Construction inspection requirements for this project include labor, material, equipment, mobilization, demobilization, quality control services and ancillary items required to oversee and verify construction progress for the new and upgraded facilities and infrastructure improvements. Inspection services will span the entire UESC construction duration estimated at approximately 24-30 months, from construction planning and site preparation, through equipment installation, and ultimately to commissioning and acceptance. The inspection services will be coordinated by the COR and/or KO assigned and the CI will be in contact with the COR on a daily basis to provide updates of all project progress and problems.
On GovTribe
Work this forecast
- Track it in your pipeline
- Find teaming partners
- Similar forecasts
- Ask GovTribe AI about this forecast