About this forecast

The Department of the Interior is soliciting for rehabilitation of the deteriorated potable water system at Scorpion on Santa Cruz Island, California, with an estimated solicitation release date of January 31, 2027. The project will install approximately 5,600 linear feet of new 3-inch HDPE piping to replace the existing 1-inch and 2-inch PVC water main, remove and dispose of the existing PVC piping, valving, and appurtenances off-island, and install five hose bibs with RPZ assemblies, two spigots, and a water filling station.

The estimated award value ranges from $500,000 to $999,000. Work is performed on Santa Cruz Island, California. The point of contact is Ethan McKinley, Superintendent at the National Park Service, reachable at ethan_mckinley@nps.gov.

Forecast text

his project will rehabilitate the existing deteriorated potable water system at Scorpion on Santa Cruz Island. Approximately 5,600 LF of new 3” HDPE piping will be installed and replace the existing 1” and 2” PVC water main. The existing PVC piping, valving, and appurtenances will be removed and disposed of off the island. Five hose bibs with RPZ assemblies, two spigots, and a water filling station will be included