CBP USBP El Centro Sector HQ & Station: Replace HVAC Cooling Towers & Related Infrastructure
Past New Requirement Updated
- Agency
-
Customs and Border Protection
Department of Homeland Security
- Solicitation expected
- Estimated value
- $2,000,000 to $5,000,000
- Set-aside
- Competitive 8(a)
Forecast facts
- Anticipated award
- Through
- NAICS code
- 238220 Plumbing, Heating, and Air-Conditioning Contractors
- Place of performance
- Imperial, CA
- Forecast number
- F2025069957
- Points of contact
Forecast details come from DHS's Acquisition Planning Forecast System. Agencies' dates and values are estimates.
About this forecast
The Department of Homeland Security Customs and Border Protection is seeking to procure design, engineering, and installation services for a new cooling tower system at the CBP USBP El Centro Sector Headquarters and Station. The project scope includes demolishing the existing dual cooling tower system, removing and replacing the concrete foundation slab, upgrading electrical circuits, fabricating and installing a new structural steel frame, and installing new cooling tower equipment with associated pumps, valves, and piping. Additionally, the contractor must upgrade the existing Building Automation System controls utilizing Johnson Controls technology to integrate with the new cooling tower system. The solicitation is expected to be released on May 22, 2026, with an anticipated award date of July 6, 2026.
The estimated award value ranges from $2,000,000 to $5,000,000 under a Firm Fixed Price contract vehicle, with an estimated period of performance from July 6, 2026, through July 6, 2027. This is a directed 8(a) sole source contract opportunity classified under NAICS code 238220 (Plumbing, Heating, and Air-Conditioning Contractors). The work will be performed in Imperial, California, with primary points of contact including Demetrius Smith (Small Business Coordinator) at demetrius.smith@cbp.dhs.gov and (317) 614-4591, and William Barnes (Requirements Contact) at william.p.barnes@cbp.dhs.gov and (949) 795-2872.
Forecast text
Design and engineer new cooling tower system design to upgrade required capacity and function.
Demolish existing cooling tower system, including both existing colling towers.
Remove and replace existing cooling tower concrete slab.
Upgrade electrical circuits and system as required for new cooling tower system.
Fabricate and install new structural steel frame for cooling towers.
Remove and replace cooling tower system with newly design system to include: pumps, valves, piping, and cooling towers.
Upgrade existing Building Automation System (BAS) controls system utilizing Johnson Controls (JCI) to accommodate new cooling tower system
Acquisition Strategy: This is a directed 8(a) sole source contract.