BG0071 handrails repainting
Past New Requirement Updated
- Agency
-
Federal Law Enforcement Training Center
Department of Homeland Security
- Solicitation expected
- Estimated value
- $350,000 to $500,000
- Set-aside
- Total Small Business
Forecast facts
- Anticipated award
- Through
- NAICS code
- 236220 Commercial and Institutional Building Construction
- Place of performance
- Glynco, GA
- Forecast number
- F2026073459
- Points of contact
Forecast details come from DHS's Acquisition Planning Forecast System. Agencies' dates and values are estimates.
About this forecast
The Department of Homeland Security Federal Law Enforcement Training Center is procuring surface preparation, priming, and repainting of approximately 5,000 linear feet of existing welded steel handrails throughout Dormitory 71 under a Total Small Business set-aside contract. Surface preparation must meet SSPC-SP2 or SSPC-SP3 standards, and the contractor must apply rust-inhibitive metal primer and brown metal enamel finish while coordinating a phasing plan with facility management to temporarily offline occupied dormitory wings or sections during standard business hours 0600 to 1800, unless written approval is obtained for off-hours execution. The solicitation release is estimated for April 30, 2026, with award anticipated July 15, 2026.
The estimated award value ranges from $350,000 to $500,000 under a Firm Fixed Price contract, with performance scheduled between July 15, 2026, and November 15, 2026, at Glynco, Dock Junction, Georgia 31520. Michael Hickox (michael.hickox@fletc.dhs.gov, 912-267-3103) serves as the primary procurement point of contact, and Traci Davis (traci.a.davis@fletc.dhs.gov, 912-267-2330) coordinates facility requirements.
Forecast text
This project involves: Provide all labor, materials, tools, equipment, supervision, and incidentals necessary to prepare, sand, prime, and repaint approximately 5,000 linear feet of existing welded steel handrails located throughout Dormitory 71 at FLETC Glynco. Dormitory 71 is an occupied training dormitory. Work shall be coordinated with the COR and facility management to allow entire wings or sections to be temporarily taken offline. Contractor shall provide a proposed phasing plan and schedule prior to beginning work.
Typical phasing may include:
• - Wing-by-wing execution
• - Floor-by-floor execution
• - Corridor sections as directed by the COR
4. Surface Preparation
Prepare all metal surfaces prior to painting. Remove loose paint, rust, and corrosion using sanding, power tools, or wire brushing. Surface preparation shall be equivalent to SSPC-SP2 or SSPC-SP3.
5. Protection of Building Areas
Contractor shall protect adjacent floors, walls, doors, carpet, furniture, and fixtures using drop cloths, plastic containment, and dust control methods. Work areas must remain safe for occupants and staff.
6. Priming
Apply rust-inhibitive metal primer to all bare metal areas in accordance with manufacturer recommendations.
7. Finish Painting
Apply high-quality metal enamel suitable for institutional environments. Minimum one full finish coat shall be applied over all handrail surfaces. Color shall match existing brown unless otherwise directed by the COR.
8. Estimated Quantity
Approximately 5,000 linear feet of metal handrail. Contractors shall verify quantities in the field.
9. Cleanup
Contractor shall remove debris, materials, masking, and protective coverings upon completion of each phase and leave areas ready for occupancy
Work shall be performed during standard business hours 0600 to 1800 7. Requests for work during off-hours, weekends, or holidays must be submitted in writing to the COR as soon as possible.