Berth Foxtrot and National Security Cutter (NSC) Crane Improvement at Base Honolulu, HI

Past New Requirement Updated

Agency
Solicitation expected
Estimated value
$20,000,000 to $50,000,000
Set-aside
Total Small Business

Forecast facts

Anticipated award
Through
NAICS code
236220 Commercial and Institutional Building Construction
Place of performance
Honolulu, HI
Forecast number
F2026075247
Points of contact

Forecast details come from DHS's Acquisition Planning Forecast System. Agencies' dates and values are estimates.

About this forecast

The U.S. Coast Guard, part of the Department of Homeland Security, forecasts a new firm-fixed-price design-build contract at Base Honolulu, Hawaii, with an estimated award date of 2026-12-15 and an estimated solicitation release date of 2026-10-05. The scope is to design and construct a 220 by 25 foot pile-supported berth with full homeporting capabilities, including vessel support utility infrastructure, and to improve load capacity on a 100 by 50 foot section of existing pile-supported pier to support National Security Cutter crane operations. The requirement is set aside for Total Small Business and classified under NAICS 236220, Commercial and Institutional Building Construction.

The estimated award value range is $20,000,000 to $50,000,000, to be procured under the Design/Build & Construction Services III (National) (NMACC III) contract vehicle. SMC Seattle is the contracting office, and the requirements office is FDCCLANT. Work is performed in Honolulu, Hawaii. Points of contact are Gabriel Perez, Maritime Law Enforcement Specialist (gabriel.d.perez@uscg.mil, +1 571-607-1542), and Edward Wieland (edward.a.wieland@uscg.mil, (757) 667-1120).

Forecast text

This is a contract for design and construction services at Base Honolulu, HI. This contract will design and construct a vessel berth and improve berth load capacity at Base Honolulu, Hawaii including vessel support utility infrastructure. This project will include a 220 by 25 FT pile supported berth with full homeporting capabilities and load capacity improvements of a 100 FT by 50 FT section of existing pile supported pier to support NSC crane operations.