Bear Butte Livestock Water Pipeline Replacement

Forecast New Requirement Updated

Agency
Solicitation expected
Estimated value
$500,000 to $999,000
Set-aside
Not on record

Forecast facts

Anticipated award
NAICS code
237110 Water and Sewer Line and Related Structures Construction
Place of performance
SD
Forecast number
56238
Points of contact

Forecast details come from the GSA Acquisition Gateway. Agencies' dates and values are estimates.

About this forecast

The Department of the Interior, with the Bureau of Land Management as funding organization, plans to procure replacement of the Bear Butte livestock water system, with an estimated solicitation release on January 31, 2027 and an estimated award on March 31, 2027. The firm fixed price requirement replaces approximately 27,800 feet of failing PVC pipeline with new 1.5- to 2-inch HDPE pipe installed in existing disturbed corridors at depths of 5 to 6 feet, and replaces twelve fiberglass stock water tanks (minimum 1,000 gallons each) with units that include wildlife escape ramps, calf barriers, floats, and overflow pipes. Existing tanks and hydrants are removed, and environmental and cultural clearances are complete.

The estimated award value range is $500,000 to $999,000, with set-aside, award type, and extent competed all to be determined. Work is performed in the Bear Butte Allotment, Fort Meade, South Dakota, within the Bureau of Land Management's Rocky Mountain Region. The point of contact is Jacob Williams, Bureau of Land Management, jtwilliams@blm.gov.

Forecast text

The Bear Butte livestock water system in the Bear Butte Allotment, Fort Meade, South Dakota, will replace approximately 27,800 feet of failing PVC pipeline with new 1.5- to 2-inch HDPE pipe installed in existing disturbed corridors at depths of 5 to 6 feet. Twelve fiberglass stock water tanks (minimum 1,000 gallons each) will replace existing tanks and include wildlife escape ramps, calf barriers, floats, and overflow pipes. Existing tanks and hydrants will be removed. Environmental and cultural clearances are complete. This project is critical to restore livestock water and protect grazing revenue