ARC Flash Hazard Analysis & Short Circuit Study Services
Past New Requirement Updated
- Agency
-
Immigration and Customs Enforcement
Department of Homeland Security
- Solicitation expected
- Estimated value
- $2,000,000 to $5,000,000
- Set-aside
- Competitive 8(a)
Forecast facts
- Anticipated award
- Through
- NAICS code
- 541330 Engineering Services
- Place of performance
- Multiple
- Forecast number
- F2024065585
- Points of contact
Forecast details come from DHS's Acquisition Planning Forecast System. Agencies' dates and values are estimates.
About this forecast
The key details of this forecasted federal contract opportunity are as follows:
The objective of this requirement is to perform short circuit, coordination, and arc flash hazard studies to provide the information necessary for the safe and reliable operation and maintenance of the Immigration & Customs Enforcement (ICE) Office of Asset and Facilities Management (OAFM) owned facilities' electrical distribution system. The contractor will be responsible for data collection, site surveys, development of single line drawings, fault current analysis, protective device coordination evaluation, maintenance staff training, PPE recommendations, and installation of arc flash labels at 18 facilities.
The estimated award value range for this Competitive 8(a) set-aside contract is between $2,000,000 and $5,000,000. The estimated solicitation release date is May 1, 2024, and the estimated award date is June 3, 2024.
Forecast text
The objective of this requirement is to perform a short circuit, coordination, and arc flash hazard studies to provide the information necessary for the safe and reliable operation and maintenance of the Immigration & Customs Enforcement (ICE) Office of Asset and Facilities Management (OAFM) owned facilities’ electrical distribution system and meet the safety requirements of NFPA 70E and OSHA 1910.132(d). Furnish all labor, tools, materials, permits, and supervision to complete short circuit, protective device coordination, and Arc Flash Hazard Studies including Arc flash incident energy analysis, including voltage drop calculations on the entire electrical systems (both normal and emergency) at 18 facilities. This includes data collection and site survey, development of single line drawings, as needed, arc flash equipment labeling, fault current analysis, protective device coordination evaluation, maintenance staff training and PPE recommendations, and maintenance program guidance to improve system safety and protection, and installation of the arc flash labels and a report documenting the results for each facility.
The Contractor shall be responsible for obtaining all necessary data for these studies and reports from as-built drawings, field investigations, and from available OAFM staff (utilizing the staff’s knowledge and familiarity of the facility electrical systems). Information for site electrical utilities will also be gained from as-built drawings and the Contractor’s personal inspection of these utilities. However, drawings may not be available or are incomplete or inaccurate.