Aircraft Electrical Component Test Stand (AECTS)

Past New Requirement Updated

Agency
Solicitation expected
Estimated value
$1,000,000 to $2,000,000
Set-aside
No set-aside

Forecast facts

Anticipated award
Through
NAICS code
334515 Instrument Manufacturing for Measuring and Testing Electricity and Electrical Signals
Place of performance
Elizabeth City, NC
Forecast number
F2026073680
Points of contact

Forecast details come from DHS's Acquisition Planning Forecast System. Agencies' dates and values are estimates.

About this forecast

The U.S. Coast Guard, under the Department of Homeland Security, forecasts a new requirement to replace its Aircraft Electrical Component Test Stand (AECTS), with an estimated solicitation release on October 30, 2026 and an estimated award on January 15, 2027. The stand will repair and test MH-65 Starter/Generators, MH-65 AC Generators, MH-60 Main Generators, and MH-60 APU Generators for the Aviation Logistics Center, a depot-level repair station responsible for programmed depot maintenance on MH-60 and MH-65 airframes, and it will support both airframes. The forecast carries no set-aside and is coded under NAICS 334515, Instrument Manufacturing for Measuring and Testing Electricity and Electrical Signals.

The estimated award value range is $1 million to $2 million, to be procured as a firm fixed price purchase order under FAR Subpart 13.5, with an estimated period of performance from January 15, 2027 through January 15, 2028 at Elizabeth City, NC 27909. Contracting is handled by the ESD/IOD contracting office, with the requirement originating from USCG/CG-AIR and the ALD requirements office. Points of contact are Adam Finnell, Contract Specialist (adam.a.finnell2@uscg.mil, +1 571-610-6145), and Denise J. Bulone, Contract Specialist, Legal-Contracts (denise.j.bulone@uscg.mil, +1 571-608-8577), with small business coordinator Justin Midgett (justin.l.midgett@uscg.mil, +1 206-831-1114).

Forecast text

The United States Coast Guard (USCG), Aviation Logistics Center (ALC), Industrial Operations Division (IOD) has a requirement to replace the Aircraft Electrical Component Test Stand (AECTS) used to repair and test the following items:

• MH-65 Starter/Generators

• MH-65 AC Generators

• MH-60 Main Generators

• MH-60 APU Generators

The ALC is a Depot Level Repair-Station responsible for programmed depot maintenance for MH-60 and MH-65 airframes. The AECTS will support both airframes.

On GovTribe

Work this forecast

  • Track it in your pipeline
  • Find teaming partners
  • Similar forecasts
  • Ask GovTribe AI about this forecast