2572785 - CG STA NEW LONDON Major M&R STA New London (FY26 RPOP)
Forecast New Requirement Updated
- Agency
-
Coast Guard
Department of Homeland Security
- Solicitation expected
- Estimated value
- $2,000,000 to $5,000,000
- Set-aside
- Total Small Business
Forecast facts
- Anticipated award
- Through
- NAICS code
- 236220 Commercial and Institutional Building Construction
- Place of performance
- New London, CT
- Forecast number
- F2026075222
- Points of contact
-
- Michael Carosotto michael.p.carosotto@uscg.mil (571) 608-9991
Forecast details come from DHS's Acquisition Planning Forecast System. Agencies' dates and values are estimates.
About this forecast
The U.S. Coast Guard plans to procure exterior repairs for the 21,000-square-foot MMB at CG STA New London, with an estimated solicitation release on 2027-06-25 and an estimated award on 2027-09-27. The work focuses on siding repairs to restore a watertight exterior envelope, with additional scope for the brick facade and windows, localized roof repairs, replacement of rake and cornice trim with cellular PVC trim of similar profiles, new gutters and downspouts, carpentry repairs, and new flashing at open joints. Work at the main block and boat bay entrance is a priority, and the roof at the 1-1/2 story wing could be an optional bid item or done later. The requirement is a Total Small Business set-aside, procured as a firm fixed-price design/build construction effort through the Design/Build Construction Services II (Regional) (RMACC II) vehicle.
The estimated award value range is $2.0 million to $5.0 million, with an estimated period of performance from 2027-09-27 through 2028-03-27. Place of performance is New London, Connecticut. CEU Providence is the contracting and requirements office, with Michael Carosotto, Technical Director, United States Coast Guard, as the primary point of contact at michael.p.carosotto@uscg.mil or (571) 608-9991, and Sean Waldron as the small business coordinator at sean.e.waldron@uscg.mil or (401) 318-3344.
Forecast text
Repair the exterior of the 21,000SF MMB. The focus of this project is the siding repairs, to ensure a watertight exterior envelope. The brick façade and/or windows are also a potential source of water intrusion and need to be assessed and repaired. The project includes localized roof repairs, replacing rake and cornice trim with new cellular PVC trim with similar profiles, and providing new gutters and downspouts. Include carpentry repairs and new flashing to close up open joints. At the north side of the boat bay entrance, above the copper pan roof, remove siding to permit installation of new copper or stainless steel flashing that closes the open joint, and reinstall/replace siding. Work at the main block and boat bay entrance is a priority; the roof at the 1-1/2 story wing could be an optional bid item or done later. Also, investigate other sources of potential water intrusion, and repair as needed.