Z1NZ--Water Tower and Reservoir Cleaning and Inspection (VA-22-00078399)
Closed Pre-Solicitation Posted
Not the latest version. See the latest solicitation from .
- Solicitation number
- 36C24522Q0965
- Agency
-
Veterans Integrated Service Network 5
Veterans Health Administration, Department of Veterans Affairs
- Responses due
- Set-aside
- Total Small Business
Opportunity facts
- NAICS code
- 221310 Water Supply and Irrigation Systems
- PSC
- Z1NZ Maintenance Of Other Utilities
- Place of performance
- Martinsburg VA Medical Center 510 Butler Ave. Building 306A-17 Martinsburg WV 25405
Notice details come from SAM.gov. Updated .
Notice text
Description: Water Tower Cleaning & Inspection Services
VA Medical Center Martinsburg, West Virginia
This is a combined synopsis/solicitation for commercial items prepared in accordance with the format in Federal Acquisition Regulation (FAR) subpart 12.6, Streamlined Procedures for Evaluation and Solicitation for Commercial Items, as supplemented with additional information included in this notice. This announcement constitutes the only solicitation; quotes are being requested.
This solicitation is a request for quotations (RFQ).
Order of preference of qualified Small Business providers able to provide all services detailed in statement of work.
1) service-disabled veteran owned business (SDVOSB)
2) veteran owned small business (VOSB)
3) small business (SB)
Please submit all written questions by Monday 9-6 by 1300 1pm Est
GENERAL:
Scope of work for the elevated water tower, in-ground water reservoir, and
clear water tank:
The purpose of this contract involves the cleaning, internal and external inspection, and removal of all sludge and debris from one (1) 750,000-gallon elevated potable water tower, one (1) 400,000 gallon in-ground potable water reservoir. The contractor shall completely remove all sludge and debris from tower and reservoir through use of an in-tank vacuum system which does not require drainage of any potable water from tower, or reservoir. Additionally, work includes cleaning of the external surface of the 750,000-gallon elevated potable water tower. Cleaning products and methods should be non-destructive and environmentally friendly. Completion of all work including cleanings, inspection, site cleanup and sludge / debris disposal shall be within 10 days of mobilization and not longer than 60 days after award.
Files
| File | Type | Posted |
|---|---|---|
| 36C24522Q0965_1.docx | DOCX document |
Notice history
| Notice | Type | Posted |
|---|---|---|
| Z1NZ--Water Tower and Reservoir Cleaning and Inspection (VA-22-00078399) | Solicitation | |
| This notice | Pre-Solicitation |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Find teaming partners
- Similar opportunities
- Ask GovTribe AI about this opportunity