- NAICS code
- 236220 Commercial and Institutional Building Construction
Notice details come from SAM.gov. Updated .
Notice text
2 versions
Update #2 · Latest ·
Request For Information (RFI)
Stratton VA Medical Center
Project Name: Parking Lot & Traffic Marking Rehab/Striping
Project #: 528A8-22-824
Solicitation#: 36C24222B0064
August 17, 2022
RFI #1
Q; When will the contractor be able to schedule all work requirements? Please provide the time and days.
A: Fri evening 5PM- thru Monday morning 6AM. Lots are to be returned to full operation during the week.
RFI #2
Q; On Page 48, section D reads, work will be accomplished in phases to reduce the impact on normal operations of the Medical Center. Based on this statement, can it be clarified how the VA wants to see the phases executed? (i.e. Break each phase one parking lot at a time, break each phase into half a parking lot at a time, break each phase into sections of a parking lot only, etc.)
A: No more than 25% of Lot-A at a time. No more than 33% of Lot-B at a time. No more than 25% of Lot-C at a time.
RFI #3
Q; Does the VA want one layer or two layers of sealcoating on the asphalt?Â
A: One layer will be fine.
RFI #4
Q; Please confirm the VA does not require crack sealing done.
A: No crack sealing.
RFI #5
Q; Do you have the square footage, number of parking spaces that need to be lined, traffic lines and crosswalks?
A: Contractor shall furnish all parts and labor to sealcoat all areas of parking lots A-C @ 375,000 sg ft. Contractor shall furnish all parts and labor to restripe all 7 parking lots A-C, Fisher House & Bldgs. 25, 26/27 & 67. to match existing layout. @ 1430 parking spots. Contractor shall furnish all parts and labor to restripe all roadways to match existing layout. Including crosswalks, turn lanes and stop stripes. @ 15 crosswalks and 3000 LF of pavements markings.
Update #1 ·
Statement of Work
Parking Lot & Traffic Marking Rehab/Striping
Stratton VAMC Albany, NY.
Introduction Stratton VAMC s mission is to provide world class healthcare for veterans in the capital region and upstate New York.
Background /Objective The Stratton VA Medical Center, 113 Holland Ave. Albany NY 12208 is currently seeking a vendor to provide all labor, materials and travel to sealcoat our parking lots and restripe all parking stalls as well as all traffic lines and crosswalks.
Place of Performance Stratton VAMC parking lots and roadways.
Period of Performance Work will be accomplished in phases to reduce impact on normal operations of the Medical Center, and such a way as to reduce the negative impact to parking and traffic flow. Work should be accomplished within 30 days from notice to proceed as weather dictates.
Scope of Work Clean and sealcoat lots A-C & restripe all lots, roadways and crosswalks.
Specific Tasks
Contractor shall furnish all parts and labor for full traffic control of work areas.
Contractor shall furnish all parts and labor to properly clean and prepare all areas to ensure the best adhesion of seal coat material and paint to existing asphalt.
Contractor shall furnish all parts and labor to sealcoat all areas of parking lots A-C @ 375,000 sg ft.
Contractor shall furnish all parts and labor to restripe all 7 parking lots A-C, Fisher House & Bldgs. 25, 26/27 & 67. to match existing layout. @ 1430 parking spots.
Contractor shall furnish all parts and labor to restripe all roadways to match existing layout. Including crosswalks, turn lanes and stop stripes. @ 15 crosswalks and 3000 LF of pavements markings.
Drawings, and Other Attachments Attachment-A, drawing of existing parking lot layouts. Attachment-B, Pavement Parking Spec. Attachment-C Seal Coat Spec.
Noncompliance - The Contracting Officer or his/her designee will notify the contractor of any noncompliance with the foregoing provisions and the action to be taken. The Contractor shall, after receipt of such notice, immediately correct the conditions to which attention has been directed. Such notice, when served on the Contractor or his/her representative at the site of the work, shall be deemed sufficient for the purpose aforesaid. If the Contractor fails or refuses to comply promptly, the Contracting Officer may issue an order stopping all and any part of the work and hold the Contractor in default.
Inspection - Upon completion of each phase of service, the COR/POC will perform the inspection in the presence of the contractor personnel, prior to the contractor personnel leaving the facility. This inspection will ensure that all work is done in a satisfactory manner No invoices will be processed for payment prior to the completion of POC inspection.
Other Related Services (Not Included in the Scope of Work) - Any services not expressly stated in this statement of work are not authorized. No other person, including the COR or any other VA personnel are authorized to request additional work be performed by the contractor. Any additional services performed that are not authorized by the contracting officer will be considered inclusive.
ATTACHMENT A
ATTACHMENT B
SECTION 32Â 17Â 23
PAVEMENT MARKINGS
GENERAL
SUMMARY
Section Includes:
Paint on pavement surfaces, in form of traffic lanes, parking bays, areas restricted to handicapped persons, crosswalks, and other detail pavement markings.
RELATED REQUIREMENTS
Paint VOC Limits: Section 01Â 81Â 13, SUSTAINABLE CONSTRUCTION REQUIREMENTS.
Paint Color: Section 09Â 06Â 00, SCHEDULE FOR FINISHES.
APPLICABLE PUBLICATIONS
Comply with references to extent specified in this section.
Federal Specifications (Fed. Spec.):
TT P 1952F - Paint, Traffic and Airfield Marking, Waterborne.
Master Painters Institute (MPI):
No. 97 - Traffic Marking Paint, Latex.
SUBMITTALS
Manufacturer's Literature and Data:
Description of each product.
Application instructions.
Certificates: Certify products comply with specifications.
Qualifications: Substantiate qualifications comply with specifications.
Installer with project experience list.
QUALITY ASSURANCE
Installer Qualifications:
Regularly installs specified products.
Installed specified products with satisfactory service on five similar installations for minimum five years.
Project Experience List: Provide contact names and addresses for completed projects.
ATTACHMENT B
DELIVERY
Deliver products in manufacturer's original sealed packaging.
Mark packaging, legibly. Indicate manufacturer's name or brand, type, color, production run number, and manufacture date.
Before installation, return or dispose of products within distorted, damaged, or opened packaging.
STORAGE AND HANDLING
Store products indoors in dry, weathertight conditioned facility.
Protect products from damage during handling and construction operations.
FIELD CONDITIONS
Environment:
Product Temperature: Minimum 13 degrees C (55 degrees F) for minimum 48 hours before installation.
Surface to be painted and ambient temperature: Minimum 10 degrees C (50 degrees F) and maximum 35 degrees C (95 degrees F).
Field Measurements: Verify field conditions affecting traffic marking installation.
WARRANTY
Construction Warranty: FAR clause 52.246 21, "Warranty of Construction."
PRODUCTS
SYSTEM PERFORMANCE
Design paint complying with specified performance:
Application: Fed. Spec. TT P 1952.
PRODUCTS - GENERAL
Basis of Design: Section 09Â 06Â 00, SCHEDULE FOR FINISHES.
Provide each product from one manufacturer and from one production run.
Low Pollutant Emitting Materials: Comply with VOC limits specified in Section 01Â 81Â 13, SUSTAINABLE CONSTRUCTION REQUIREMENTS for the following products:
Paints and coatings.
ATTACHMENT B
PAINT APPLICATOR
Apply marking paint with approved mechanical equipment. Provide equipment with constant agitation of paint and travel at controlled speeds. Synchronize one or more paint "guns" to automatically begin and cut off paint flow in case of skip lines. Equipment to have manual control to apply continuous lines of varying length and marking widths as indicated on Drawings. Provide pneumatic spray guns for hand application of paint in areas where mobile paint applicator cannot be used. // Use separate piece of equipment when equipment does not have glass bead dispenser. Adjust and synchronize equipment with paint applicator to distribute reflective beads on paint lines uniformly within ten seconds without any waste. //
PAINT
Paint: MPI No. 97. For obliterating existing markings comply with Fed. Spec. TT P 1952. Provide minimum 18 L (5 gallons) containers.
EXECUTION
PREPARATION
Examine and verify substrate suitability for product installation.
Protect existing construction and completed work from damage.
Clean substrates. Remove contaminants capable of affecting subsequently installed product's performance.
Remove dust, dirt, and other granular surface deposits by sweeping, blowing with compressed air, rinsing with water, or combination of these methods.
As an option, comply with Fed. Spec. TT P 1952 for removal of existing paint markings on asphalt pavement. Apply black paint in as many coats as necessary to completely obliterate existing markings.
Scrub affected areas with several applications of trisodium phosphate solution or other approved detergent or degreaser, and rinse thoroughly after each application, Where oil or grease are present on old pavements to be marked, .
Clean and dry surface before pavement marking. Do not begin any marking until Contracting Officer's Representative inspected surface and gives permission to proceed.
ATTACHMENT B
INSTALLATION - GENERAL
Install products according to manufacturer's instructions and approved submittal drawings.
When manufacturer's instructions deviate from specifications, submit proposed resolution for Contracting Officer's Representative consideration.
PAINT APPLICATION
Apply uniformly painted pavement marking of required colors, length, and width with true, sharp edges and ends on properly cured, prepared, and dried surfaces.
Comply with details as indicated on drawings and established control points.
Apply paint at wet film thickness of 0.4Â mm (0.015Â inch). Apply paint in one coat. When directed by Contracting Officer's Representative, apply additional coats at markings showing light spots. Comply with paint manufacturer's maximum drying time requirements to prevent undue softening of asphalt, and pick up, displacement, or discoloration by tires of traffic.
When deficiency in marking drying occurs, discontinue paint operations until cause of slow drying is determined and corrected.
Remove and replace marking applied less than minimum material rates, deviates from true alignment, exceeds stipulated length and width tolerances, or shows light spots, smears, or other deficiencies or irregularities.
DETAIL PAVEMENT MARKING APPLICATION
Apply Detail Pavement Markings, exclusive of actual traffic lane marking as follows:
At exit and entrance islands and turnouts.
On curbs.
At crosswalks.
At parking bays.
Other locations as indicated on drawings.
Install detail pavement markings of colors, widths and lengths, and design pattern at locations indicated on drawings.
ATTACHMENT B
TOLERANCES
Length and Width of Lines: Plus or minus 75Â mm (3Â inches) and plus or minus 3Â mm (1/8Â inch), respectively, in case of skip markings.
Length of intervals exceeding line length tolerance are not acceptable.
CLEANING
Remove excess paint before paint sets.
PROTECTION
Protect pavement markings from traffic and construction operations.
Protect newly painted markings from vehicular traffic until paint is dry and track free.
Place warning signs at beginning of wet line, and at points well in advance of marking equipment for alerting approaching traffic from both directions.
Place small flags or other similarly effective small objects near freshly applied markings at frequent intervals to reduce crossing by traffic.
Repair damage.
- - - E N D - - -
ATTACHMENT C
SECTION 32 12 16
ASPHALT PAVING
PART 1 GENERAL
1.1 APPLICATION OF SEAL COAT
A. Prepare the surfaces, mix the seal coat material, and apply in accordance with the manufacturer s recommendations as approved by the Architect or Engineer.
B. Achieve a finished surface seal which, when dry and thoroughly set, is smooth, tough, resilient, of uniform black color, and free from coarse
C. When resealing existing paving 5, 10, 15 years and older, that is oxidized and is very light in color, squeegee apply the first coat of seal coat and spray on a second coat. Two coats are preferred in older paving when the asphalt cement has oxidized leaving the seal coat with nothing to bond to other than the aggregate that in many cases has polished over time leaving less than a desirable surface to bond to.//
1.2 PROTECTION
Protect the asphaltic paved areas from traffic until the sealer is set and cured and does not pick up under foot or wheeled traffic.
1.3 FINAL CLEAN-UP
Remove all debris, rubbish, and excess material from the work area.
E N D
Files
| File | Type | Posted |
|---|---|---|
| 36C24222B0064 0001.docx | DOCX document | |
| SAM Wage Determination.pdf | ||
| VAAR 819 219 77 VA Notice of Limitation on subcontracting.docx | DOCX document | |
| 36C24222B0064_1.docx | DOCX document | |
| FAR 52.225-2 Buy American Certification.docx | DOCX document |
Notice history
| Notice | Type | Posted |
|---|---|---|
| Z1DA--528A8-22-824 albany parking lot & traffic marking rehab/striping | Award Notice | |
| This notice | Solicitation | |
| Z1DA--528A8-22-824 albany parking lot & traffic marking rehab/striping | Pre-Solicitation |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Find teaming partners
- Similar opportunities
- Ask GovTribe AI about this opportunity