Youghiogheny Resource Managers Building Siding Replacement

Closed Pre-Solicitation Posted

Not the latest version. See the latest solicitation from .

Solicitation number
W911WN26QA059
Agency
Responses due
Set-aside
Total Small Business

Opportunity facts

NAICS code
238170 Siding Contractors
Place of performance
Youghiogheny River Lake 497 Flanigan Road Confluence, PA 15424 15424

Notice details come from SAM.gov. Updated .

About this opportunity

The U.S. Army Corps of Engineers, Pittsburgh District, intends to solicit exterior siding replacement at the Resource Managers Office at Youghiogheny River Lake, with responses to the pre-solicitation notice due August 19, 2026. This procurement is set aside for total small business. Work is performed at the Resource Managers Office building in Confluence, Pennsylvania, a 1986-constructed multi-level timber-framed structure that serves as administrative office space for the Corps. The scope consists of complete removal and disposal of existing T1-11 plywood siding and asphalt-saturated fibrous sheathing, followed by installation of a new exterior wall assembly comprising 1/2-inch APA-rated structural wood sheathing, continuous weather-resistive barrier, 3/8-inch nominal preservative-treated wood furring strips, and 5/16-inch fiber cement lap siding installed per manufacturer requirements. The existing structure features 2x6 wood stud framing with R-19 insulation and cedar trim. No contract value, period of performance, or solicitation release date is specified in the notice.

Notice text

2 versions

Update #2 · Latest ·

USACE, Pittsburgh District, has an upcoming requirement to replace the siding of the Resource Managers Office at Youghiogheny River Lake. The work described herein shall be performed at the Youghiogheny Resource Managers Office (RMO) building located within the Youghiogheny River Lake project area in Confluence, Pennsylvania. The building currently serves as administrative office space for the U.S. Army Corps of Engineers. The RMO building was constructed in 1986 and is a multi-level, timber-framed structure built into the hillside overlooking the impoundment side of the dam. The exterior walls consist of 2x6 wood stud framing with 6-inch fiberglass batt insulation (R-19, foil-faced). Interior partitions consist of 2x4 wood studs with 1/2-inch gypsum wallboard. The existing exterior wall assembly consists of 1/2-inch asphalt-saturated fibrous sheathing with 5/8-inch cedar-faced T1-11 plywood siding, for a combined nominal thickness of 1-1/8 inches. Exterior trim and fascia consist of various widths of cedar lumber. The building is supported by cast-in-place concrete footings and 12-inch concrete masonry unit (CMU) foundation walls. The rear wall section and balcony framing are supported by 4 feet-0 inches wide by 5 feet-0 inches deep concrete footings, laminated wood columns (8-3/4 inches x 15 feet-0 inches), and laminated wood beams (8-3/4 inches x 15 feet-0 inches).This project consists of the removal and replacement of the existing exterior wall cladding system. The Contractor shall remove and dispose of the existing T1-11 siding and 1/2-inch asphalt-saturated fibrous sheathing in their entirety. The Contractor shall furnish and install a new exterior wall assembly consisting of 1/2-inch APA-rated structural wood sheathing, a continuous weather-resistive barrier (WRB), 3/8-inch nominal preservative-treated wood furring strips, and 5/16-inch fiber cement lap siding in accordance with manufacturer requirements. The new wall assembly is intended to match the existing wall thickness (approximately 1-1/8 inches) to maintain alignment with existing window and door openings. Minor dimensional variation within normal construction tolerances are acceptable and shall not require modification or resetting of existing windows and doors. The Contractor shall not reset, relocate, or otherwise modify existing windows and doors. Furring strips shall be installed vertically over the WRB at a maximum spacing of 16 inches on center and shall be fastened through the sheathing into wall framing members. Fiber cement siding shall be installed horizontally over the furring strips and fastened through the furring and sheathing into wall framing members. Furring strips are intended to provide a drainage and ventilation cavity and shall not be used as the sole fastening substrate for the fiber cement lap siding. The Contractor shall ensure that all fiber cement lap siding edges are supported by framing members or approved blocking in accordance with manufacturer requirements. The Contractor shall furnish and install all required trim at windows, doors, corners, and transitions. Trim material shall be fiber cement. The cedar hand railing on the balconys is to be new capped PVC or capped composite decking of matching color to fiber cement board siding. The Contractor shall provide complete flashing at all required locations, including but not limited to head flashing at windows and doors, Z-flashing at horizontal joints and transitions, and kick-out flashing at roof-to-wall intersections. All flashing shall be integrated with the WRB in a shingle-lap manner to maintain a continuous drainage plane.

The work shall be completed within 180 after written Notice to Proceed. 

The acquisition will be procured as 100% Set-Aside for Small Business.  The resulting award will be for one (1) Firm-Fixed-Price (FFP) Contract.  All responsible Quoters are encouraged to participate. The Request for Quotes (RFQ) will be issued on or about 19 August 2026, online through Procurement Integrated Enterprise Environment (PIEE) which posts the opportunity to SAM.gov; therefore, requests for hardcopies of the solicitation will not be honored.

The North American Industrial Classification System (NAICS) Code for this acquisition is 238170 - Siding Contractors. 

The Small Business Size Standard for this NAICS Code is $19,000,000.00.

In order to submit a Bid on this project, your company must-

  1. Be registered in System for Award Management (SAM) and maintain an active registration status. 
  2. Be registered in the Procurement Integrated Enterprise Environment (PIEE) for the Solicitation Module with the PROPOSAL MANAGER Manger role.

System for Award Management (SAM) Registration

Registering in SAM.gov includes both entity validation and entity registration.

To register in SAM:

  1. Navigate to SAM.gov
  2. Select Sign-In (top right)
  3. Select Create an Account then Follow the Instructions.
  4. After Account is Set-up, Select Sign In.
  5. Under the Entity Management widget, Select “Get Started” button.
  6. Select Register Entity. As part of entity registration, a Unique Entity ID will be assigned.

For Additional Information on SAM

To Register Your Entity (company), please visit https:/www.fsd.gov/gsafsd_sp?id=gsa_index . Here you will find the following,

            Get Started with Your Registration

            Check Registration Status – ACTIVE, INACTIVE, PENDING

            Update Your Registration

            Become an Entity Administrator

            Validate Your Entity

            *Access User Guides

            *By selecting this option, you can obtain a Quick Start Guide for Contract Registrations.

Also, here you will find in addition to the User Guides - FAQs, Videos, and Definitions.

PLEASE NOTE

It is mandatory that all companies be registered in SAM in order to receive federal contracts.

There is no charge to register or maintain your company (entity) registration.

Login.gov manages usernames and passwords for SAM.gov.

*Important* Registration Information

Registration can take at least ten (10) business days to be active in SAM.gov.

Registration must be in active status upon offer submission and remain active during award period.

Registration must be renewed every 365 days to remain active.

The Federal Service Desk (FSD) for SAM questions, may be contacted.  

Phone Number: 866-606-8220

Hours of Operation: Monday-Friday 8 a.m. to 8 p.m. ET

Procurement Integrated Enterprise Environment (PIEE) Solicitation Module Registration

To register for PIEE follow the below instructions. 

Register in PIEE:

a. Navigate to https://piee.eb.mil/

b. Select Register [top right]

c. Select Vendor

d. Create a User ID and Password and follow the prompts [next]

e. Create Security Questions [next]

f. Complete your User Profile Information [next]

g. Complete your Supervisor or Approving Official Information [next]

h. Complete Roles

i. Step 1. Select SOL-Solicitation

ii. Step 2. Select Proposal Manager

iii. Step 3. Click Add Roles

iv. Step 4. Fill in your Location Code (CAGE Code) [next]

i. Provide a justification for your registration [next]

j. Follow the remaining prompts to submit your registration

The Procurement Integrated Enterprise Environment (PIEE) help desk may be reached by calling telephone number 866-618-5988 for assistance.

Update #1 ·

USACE, Pittsburgh District, has an upcoming requirement to replace the siding of the Resource Managers Office at Youghiogheny River Lake. The work described herein shall be performed at the Youghiogheny Resource Managers Office (RMO) building located within the Youghiogheny River Lake project area in Confluence, Pennsylvania. The building currently serves as administrative office space for the U.S. Army Corps of Engineers. The RMO building was constructed in 1986 and is a multi-level, timber-framed structure built into the hillside overlooking the impoundment side of the dam. The exterior walls consist of 2x6 wood stud framing with 6-inch fiberglass batt insulation (R-19, foil-faced). Interior partitions consist of 2x4 wood studs with 1/2-inch gypsum wallboard. The existing exterior wall assembly consists of 1/2-inch asphalt-saturated fibrous sheathing with 5/8-inch cedar-faced T1-11 plywood siding, for a combined nominal thickness of 1-1/8 inches. Exterior trim and fascia consist of various widths of cedar lumber. The building is supported by cast-in-place concrete footings and 12-inch concrete masonry unit (CMU) foundation walls. The rear wall section and balcony framing are supported by 4 feet-0 inches wide by 5 feet-0 inches deep concrete footings, laminated wood columns (8-3/4 inches x 15 feet-0 inches), and laminated wood beams (8-3/4 inches x 15 feet-0 inches).This project consists of the removal and replacement of the existing exterior wall cladding system. The Contractor shall remove and dispose of the existing T1-11 siding and 1/2-inch asphalt-saturated fibrous sheathing in their entirety. The Contractor shall furnish and install a new exterior wall assembly consisting of 1/2-inch APA-rated structural wood sheathing, a continuous weather-resistive barrier (WRB), 3/8-inch nominal preservative-treated wood furring strips, and 5/16-inch fiber cement lap siding in accordance with manufacturer requirements. The new wall assembly is intended to match the existing wall thickness (approximately 1-1/8 inches) to maintain alignment with existing window and door openings. Minor dimensional variation within normal construction tolerances are acceptable and shall not require modification or resetting of existing windows and doors. The Contractor shall not reset, relocate, or otherwise modify existing windows and doors. Furring strips shall be installed vertically over the WRB at a maximum spacing of 16 inches on center and shall be fastened through the sheathing into wall framing members. Fiber cement siding shall be installed horizontally over the furring strips and fastened through the furring and sheathing into wall framing members. Furring strips are intended to provide a drainage and ventilation cavity and shall not be used as the sole fastening substrate for the fiber cement lap siding. The Contractor shall ensure that all fiber cement lap siding edges are supported by framing members or approved blocking in accordance with manufacturer requirements. The Contractor shall furnish and install all required trim at windows, doors, corners, and transitions. Trim material shall be fiber cement. The cedar hand railing on the balconys is to be new capped PVC or capped composite decking of matching color to fiber cement board siding. The Contractor shall provide complete flashing at all required locations, including but not limited to head flashing at windows and doors, Z-flashing at horizontal joints and transitions, and kick-out flashing at roof-to-wall intersections. All flashing shall be integrated with the WRB in a shingle-lap manner to maintain a continuous drainage plane.

Notice history

Notice Type Posted
Youghiogheny Resource Managers Building Siding Replacement Latest solicitation Solicitation
This notice Original Pre-Solicitation

Similar open opportunities

Opportunity Agency Set-aside Responses due
Borough of Millvale, Pennsylvania, Local Protection Project (LPP) PL84-99 Rehabilitation Millvale, Pennsylvania, United States · NAICS 237990 ENDIST Pittsburgh Total Small Business
Borough of Etna, Pennsylvania, Local Protection Project (LPP) PL84-99 Rehabilitation 15223 · NAICS 237990 ENDIST Pittsburgh Total Small Business
TX-caddo lake NWR-VC siding repair Karnack TX · NAICS 238170 — Total Small Business
Mosquito Lake Control Tower Structural Standing Seam Metal Roof Replacement 2961-B Warren-Meadville Road, Cortland, OH 44410 · NAICS 238160 ENDIST Pittsburgh Total Small Business

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity