Y1DB--558-19-305 XR2 Pharmacy Processing System

Closed Solicitation Posted

This opportunity was awarded. See the award notice from .

Solicitation number
36C24624B0002
Agency
Veterans Integrated Service Network 6 Veterans Health Administration, Department of Veterans Affairs
Responses due
Set-aside
No set-aside

Opportunity facts

NAICS code
238210 Electrical Contractors and Other Wiring Installation Contractors
PSC
Y1DB Construction Of Laboratories And Clinics

Notice details come from SAM.gov. Updated .

About this opportunity

This solicitation seeks construction services to prepare existing pharmacy space at the Durham VA Medical Center in Durham, North Carolina for installation of an Omnicell XR2 Packaging Unit. The Department of Veterans Affairs Veterans Health Administration VISN 6 will evaluate proposals based on the ability to perform limited demolition and finishes work in the pharmacy as well as mechanical and electrical improvements in the interstitial space above, including installing a new air compressor and associated power and piping on the second floor concrete slab, in accordance with provided design drawings and specifications while maintaining healthcare facility operations. Proposals are due by February 6, 2024.

There is no set-aside designation for this opportunity. The NAICS code is 238210 and PSC code R499. The estimated value for construction costs ranges from $100,000 to $250,000 to be completed within 150 calendar days from notice to proceed. Work will be performed at the VA Medical Center in Durham and conducted during standard business hours on weekdays, excluding federal holidays, with the potential for additional time as authorized.

Notice text

Project 558-19-305

XR2 Pharmacy Processing System Site Prep

STATEMENT OF WORK

Page 2 of 2

Page 2 of 2

XR2 Pharmacy Processing System Site Preparation

(Construction)

Project 558-19-305

STATEMENT OF WORK

Preparation of existing pharmacy space for installation

of the Omnicell XR2 Packaging Unit

General: The scope of this project is to prepare a portion of the existing pharmacy space for the installation of the Omnicell XR2 Packaging Unit. This unit will be installed by the VA after this project is complete. The pharmacy is in Building 1, 1st Floor F-wing at the Durham Veterans Affairs Medical Center in Durham, NC. Work will include limited demolition and finishes in the Pharmacy. Mechanical and electrical improvements will be completed in the interstitial space on the 2nd floor above the Pharmacy.

This project includes the installation of a new air compressor and associated power and piping. The air compressor will be located on the concrete slab portion of the 2nd floor interstitial space above the pharmacy department. Access to this space from within the building requires traversing on a walk-on ceiling with a maximum weight capacity of 25 psf. There are two options for accessing this concrete slab portion with heavy, large equipment or materials as follows:

Transport of the air compressor can be from the facility s loading dock, through the building to the 2nd floor interstitial space. Access to the concrete slab portion of this space will require the air compressor unit to be broken down into sections to adhere to the loading limits of the walk-on ceiling.

Access to this concrete portion of this interstitial space can also be accomplished through an existing removable louver in the exterior wall of the building. This louver is located near the designed installation location of the air compressor. However, delivery of any material or equipment using this means will require an extended reach fork-lift to accomplish the transfer from the outside parking area and through the louver to inside the building. Lift equipment will be obtained by contractor. Reinstallation of the louver will require recaulking of its perimeter at the building.

The final conditions of the project will be a space with improved interior finishes and utilities compatible with the requirements of station sourced equipment. Work will be executed in the First and Second Floors of F-Wing, Building 1, Durham VA.

Construction Cost: Estimated cost of construction: $100,000 - $250,000.

Construction Duration: 150 Calendar days from notice to proceed (NTP).

Phasing: Project construction will be phased as indicated on drawings.

Construction Services: Perform work as described above and in accordance with professionally developed design drawings and specifications.

Place of Performance: Tasks will be performed at the VA Medical Center, Durham, NC. Work will be in an occupied healthcare facility in operation 24 hours a day.

Hours of Performance: Construction will be during business hours, 0730-1600, Monday through Friday with all federal holidays observed. Additional time outside of this allowed time may be authorized by VA.

END STATEMENT OF WORK -

Attachments

Files attached to this notice, newest first
File Type Posted
ATTACHMENT A 558-19-305 XR2 Pharmacy_Second Floor Plan.pdf PDF
558-19-305 XR2 Pharmacy Specifications.pdf PDF
36C24624B0002_1.docx DOCX document

Notice history

Notices posted for this opportunity, newest first
Notice Type Posted
Y1DB--558-19-305 | XR2 Pharmacy Processing System | Durham VAMC | Award Award Notice
Y1DB--558-19-305 XR2 Pharmacy Processing System This notice · Latest solicitation Solicitation
Y1DB--558-19-305 XR2 Pharmacy Processing System Original Pre-Solicitation

On GovTribe

Work this opportunity on GovTribe

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity