Y1DA--Bldgs. 135 and 143 sidewalk replacement

Closed Solicitation Posted

Solicitation number
36C24225R0109
Agency
Veterans Integrated Service Network 2 Veterans Health Administration, Department of Veterans Affairs
Responses due
Set-aside
Service-Disabled Veteran-Owned Small Business

Opportunity facts

NAICS code
237310 Highway, Street, and Bridge Construction
PSC
Y1DA Construction Of Hospitals And Infirmaries
Place of performance
VA New Jersey Health Care System, Lyons Campus 151 Knollcroft Rd Lyons, New Jersey 07939, United States
Points of contact

Notice details come from SAM.gov. Updated .

About this opportunity

The Department of Veterans Affairs Veterans Integrated Service Network 2, through the Samuel S. Stratton VA Medical Center, is soliciting proposals for sidewalk replacement at Buildings 135 and 143 of the VA New Jersey Healthcare System's Lyons campus. The project encompasses approximately 1,500 square feet of concrete sidewalk replacement utilizing 4000 PSI concrete with #6 gauge welded wire mesh and chain-link security fencing. Key contract requirements include compliance with Davis-Bacon wage rates for Somerset County, New Jersey, registration in SAM.gov, and verification as a Service-Disabled Veteran-Owned Small Business (SDVOSB). Evaluation will be based on technical capability, price, and past performance, with the government reserving the right to award without discussions. Bidders must submit a 5-page capability statement by the proposal due date of October 22, 2025, at 12:00 PM EST, with all requests for information due by October 17, 2025, and a mandatory site visit scheduled for October 15, 2025, at 10:00 AM EST.

This contract opportunity is 100% set aside for Service-Disabled Veteran-Owned Small Businesses. The project magnitude is between $25,000 and $100,000, with a compressed performance period of 10 calendar days from the Notice to Proceed. Work must be conducted during standard hours of 0700-1630 with no weekend or holiday work permitted. The place of performance is 151 Knollcroft Road, Lyons, New Jersey 07939. Contractors are required to submit supporting documentation including a Limitations on Subcontracting certificate and a Buy American Certificate, with proposals to be submitted via email to Scott Nussbaum, Contract Specialist, at Scott.Nussbaum@va.gov.

Notice text

2 versions

Update #2 · Latest ·

5. PROJECT NUMBER (if applicable)

CODE

7. ADMINISTERED BY

2. AMENDMENT/MODIFICATION NUMBER

CODE

6. ISSUED BY

8. NAME AND ADDRESS OF CONTRACTOR

4. REQUISITION/PURCHASE REQ. NUMBER

3. EFFECTIVE DATE

9A. AMENDMENT OF SOLICITATION NUMBER

9B. DATED

PAGE OF PAGES

10A. MODIFICATION OF CONTRACT/ORDER NUMBER

10B. DATED

BPA NO.

1. CONTRACT ID CODE

FACILITY CODE

CODE

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers

E. IMPORTANT:

is extended,

(a) By completing Items 8 and 15, and returning __________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the

offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR

ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY

is not extended.

12. ACCOUNTING AND APPROPRIATION DATA

(REV. 11/2016)

is required to sign this document and return ___________ copies to the issuing office.

is not,

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.

15C. DATE SIGNED

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES

SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter

or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to

the opening hour and date specified.

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER

Contractor

16C. DATE SIGNED

14. DESCRIPTION OF AMENDMENT/MODIFICATION

16B. UNITED STATES OF AMERICA

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER

16A. NAME AND TITLE OF CONTRACTING OFFICER

15B. CONTRACTOR/OFFEROR

STANDARD FORM 30

PREVIOUS EDITION NOT USABLE

Prescribed by GSA - FAR (48 CFR) 53.243

(Type or print)

(Type or print)

(Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

(Number, street, county, State and ZIP Code)

(If other than Item 6)

(Specify type of modification and authority)

(such as changes in paying office, appropriation date, etc.)

(If required)

(SEE ITEM 11)

(SEE ITEM 13)

(X)

CHECK

ONE

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

(Signature of person authorized to sign)

(Signature of Contracting Officer)

1

4

0001

561-26-1-5101-0001

N/A

36C242

Department of Veterans Affairs

Samuel S. Stratton VA Medical Center

113 Holland Avenue

Albany NY 12208-3410

36C242

Department of Veterans Affairs

Samuel S. Stratton VA Medical Center

Network Contracting Activity

113 Holland Avenue

Albany NY 12208-3410

To all Offerors/Bidders

36C24225R0109

10-08-2025

X

X

X

1

x

1

Amendment 0001 to RFP 36C24225R0109 Replace Sidewalks for bldgs. 135 & 143 at the Lyons Campus of the NJHCS.

THE PURPOSE OF THIS AMENDMENT IS TO POST RFI QUESTIONS AND ANSWERS WITH SUPPORTING DOCUMENTATION.

PLEASE SEE THE ATTACHED CONTINUATION PAGES.

DANIEL BARONE

SENIOR CONTRACTING OFFICER

Page 2 of 5

AMENDMENT 0001 TO SOLICITATION 36C24225R0109 PROJECT replace the sidewalks for buildings 135 & 143, VA NJHCS.

The proposal due date for the subject solicitation remains Wednesday, October 22, 2025, at 12:00pm EST.

ALL proposal shall be emailed to Scott Nussbaum, Administrative Contracting Officer, at Scott.Nussbaum@va.gov prior to the proposal due date.

Please see the attached Technical Questions and Answers dated 10/20/2025.

All other terms and conditions of this solicitation under VA Solicitation 36C24225R0109 remains unchanged.

Page 5 of 5

Sidewalk replacement RFIs and answers:

Is there / will there be a designated location to drop the bin per sidewalk location? Designated by the COR

Should we make the sidewalk surface smooth or sweep the finishing? Surface SweepÂ

What are the hours of operation to conduct work on the sidewalks? 0700-1630

Can work be conducted on the weekends and during holidays? No Weekends or Holidays

Approved / recommended fence of preference? Chain-link

When is this project's approximate start date? Within 10 days of the Notice to Proceed.

Will we be allowed to keep equipment on site? Yes We will find a spot for it

Will there be permits & inspections? Yes for inspection

Is the entire 1,500 sq. ft. area identified for removal and replacement, or will the extent be verified on-site based on condition? YES marked in Yellow Paint

Are there drawings or marked site plans identifying the exact sections of sidewalks for demolition and replacement? None available at this time.

Just to confirm it is three locations one section in front of building 135 and two sections behind bldg. 143 Per walk through

Behind bldg. 143 is it acceptable to sawcut this area and reinstall the pavers? If it is flush to the ADA warning pads? This was briefly mentioned during the site visit. Yes is red

The SOW specifies 4000 PSI concrete and #4 rebar can the contractor use welded wire mesh instead of rebar where appropriate? # 6 gauge welded wire mesh is acceptable.

Are control joints and expansion joints required? If so, at what spacing? Control joints should be 1.25

Is geotextile fabric required under the gravel base? NO

Is the specified overnight cure acceptable with curing blankets, or is a specific curing compound required? Yes

Are there any known drainage issues or required corrections in the project area? NO

Will on-site storage/staging for materials and dumpsters be permitted near Buildings 135 and 143? Designated by the COR

Are there restricted hours for construction activity or material deliveries? Hours of operation to conduct work on the sidewalks is 0700-1630

The SOW requires security fencing. Please confirm required height and type (e.g., chain link, orange safety, safety mesh fencing etc.). Chain link, 6

Are there known underground utilities (water, electrical, communication) near the work area? The GC would have to check

Will VA provide utility locates prior to excavation? YES

The SOW allows 10 calendar days from NTP. Does this include cure time, or is cure time considered outside the 10 days? The contractor has 10 calendar days from the NTP to start working.

Will VA accommodate weather delays (e.g., excessive rain, freezing temps) through time extensions? Unknowns will be handled as they arise.

What are the standard work hours at the Lyons campus? Answered above.

Will weekend or after-hours work be permitted to meet the 10-day period? Answered above.

Are material submittals limited to concrete mix design and rebar certifications, or are additional documents (e.g., safety plan, work schedule, QC plan) required? Yes

Who will be the on-site COR responsible for daily inspections and receiving reports? Michael Weaver

What documentation is required for final acceptance? daily reports, photos, curing logs

The solicitation requests a cost breakdown does VA require a specific format or SF 1442 continuation sheet? Or SF 1449? SF 1442

Will technical capability be evaluated based solely on the 5-page capability statement, or should resumes and project references be included separately? Evaluations will be determined IAW FAR Subpart 13.106-1 (a) (2). The Government shall award this procurement on the basis of technical capability, price and past performance. Please provide a maximum 5-page capability statement that indicates the vendor has trained personnel and experience with the same or similar work.

Is there any past performance requirement for this solicitation? See answer above.

Update #1 ·

Please see attached solicitation and supporting documents.

See attached document: 36C24225R0109.

See attached document: SOW.

See attached document: LIMITATIONS ON SUBCONTRACTING.

See attached document: FAR 52.225-2 BUY AMERICAN CERTIFICATE

Attachments

Files attached to this notice, newest first
File Type Posted
36C24225R0109 0001_1.docx DOCX document
36C24225R0109_2.docx DOCX document
36C24225R0109 final.pdf PDF

On GovTribe

Work this opportunity on GovTribe

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity