WY TIGER US212(9) Beartooth Roadway
Closed Solicitation Posted
This opportunity was awarded. See the award notice from .
- Solicitation number
- 6982AF19B000008
- Agency
- Federal Highway Administration Department of Transportation
- Responses due
- Set-aside
- No set-aside
Opportunity facts
- NAICS code
- 237310 Highway, Street, and Bridge Construction
- Place of performance
- Shoshone National Forest Park County, Wyoming WY 82414 USA
Notice details come from SAM.gov. Updated .
About this opportunity
This solicitation seeks construction services for the WY TIGER US212(9) Beartooth Roadway project. The Department of Transportation Federal Highway Administration is procuring the realignment and reconstruction of 2.61 kilometers of roadway and construction of a new 600 foot steel bridge along U.S. Route 212 in Wyoming at an elevation of 10,950 feet. Key requirements include roadway excavation, drainage, mechanically stabilized earth walls, aggregate base, asphalt paving, and a construction timeline of June 2019 through October 2020. Bids are due on May 2, 2019 and the award will be made on a full and open competitive basis.
The opportunity has no set-aside designation. The primary NAICS code is 237110 and PSC code is D304. The estimated total value is between $14-17 million. Work will involve 44,000 cubic meters of excavation and take place within the Shoshone National Forest in Wyoming over a 4-6 month construction season annually from 2019 through 2020. Four optional scopes of work relate to additional roadway improvements, landscaping, stone masonry features, and guide sign construction.
Notice text
2 versions
Update #2 · Latest ·
THIS IS AN INVITATION FOR BID, PLANS AND SPECIFICATIONS ARE CURRENTLY AVAILABLE.
PROJECT DETAILS:
This project is being developed in cooperation with the Shoshone National Forest (SNF), the Wyoming Department of Transportation (WYDOT), and the National Park Service (NPS). The Beartooth Highway in Wyoming begins at the Wyoming/Montana State Line east of Cooke City, Montana, following US 212 for 56.1 kilometers to the Wyoming/Montana State Line southwest of Red Lodge, Montana. The project is located entirely within the Shoshone National Forest and is maintained by the NPS out of Yellowstone National Park. In addition to being a Forest Highway, the route carries the special designation as a National Park Approach Road, a Scenic Byway, and All American Road.
This project includes realignment and reconstruction of 2.61 km (1.6 miles) of roadway and a new bridge on U.S. 212, otherwise called Beartooth Highway. The project is located at an elevation of 10,950 feet with an anticipated construction season of 4-6 months per year. This project is located in an environmentally sensitive remote location with potential for unusually severe weather.
TYPE OF CONSTRUCTION:
Roadway realignment, reconstruction, rock excavation, grading, drainage, 600 ft steel bridge, MSE walls, aggregate base course, and paving, traffic control, public information.
This project consists of:
Principal work items on Schedule A include: 44,000 cm (cubic meters) of roadway excavation; 800 cm structural backfill; 2,400 m2 (square meters) mechanically stabilized earth wall; 25,000t (metric tons) aggregate base; 5,000t of hot asphalt paving; 10,000 m2 pulverizing; 2,000 cm structural concrete; 291,700 kg structural steel, furnished, fabricated and erected; 475m of pipe culvert placement; 6 Ha (hectares) hydraulic seeding; 580 L (liters) of pavement markings; 9,000 flagger hours.
This project will have one Schedule and four Options; Option W includes .68 miles of roadway improvements, Option X will be used for plantings and landscaping, Option Y places stone masonry on the bridge, and Option Z constructs masonry guide signs along the project.
Estimated total cost for the project is $14,000,000 to $17,000,000.
Update #1 ·
THIS IS NOT AN INVITATION FOR BID, PLANS AND SPECIFICATIONS ARE CURRENTLY NOT AVAILABLE. THE TENTATIVE ADVERTISMENT DATE IS MARCH 28, 2019. THE PROJECT WILL BE ADVERTISED ON A FULL & OPEN BASIS (UNRESTRICTED)
PROJECT DETAILS:
This project is being developed in cooperation with the Shoshone National Forest (SNF), the Wyoming Department of Transportation (WYDOT), and the National Park Service (NPS). The Beartooth Highway in Wyoming begins at the Wyoming/Montana State Line east of Cooke City, Montana, following US 212 for 56.1 kilometers to the Wyoming/Montana State Line southwest of Red Lodge, Montana. The project is located entirely within the Shoshone National Forest and is maintained by the NPS out of Yellowstone National Park. In addition to being a Forest Highway, the route carries the special designation as a National Park Approach Road, a Scenic Byway, and All American Road.
This project includes realignment and reconstruction of 2.61 km (1.6 miles) of roadway and a new bridge on U.S. 212, otherwise called Beartooth Highway. The project is located at an elevation of 10,950 feet with an anticipated construction season of 4-6 months per year. This project is located in an environmentally sensitive remote location with potential for unusually severe weather.
TYPE OF CONSTRUCTION:
Roadway realignment, reconstruction, rock excavation, grading, drainage, 600 ft steel bridge, MSE walls, aggregate base course, and paving, traffic control, public information.
This project consists of:
Principal work items on Schedule A include: 44,000 cm (cubic meters) of roadway excavation; 800 cm structural backfill; 2,400 m2 (square meters) mechanically stabilized earth wall; 25,000t (metric tons) aggregate base; 5,000t of hot asphalt paving; 10,000 m2 pulverizing; 2,000 cm structural concrete; 291,700 kg structural steel, furnished, fabricated and erected; 475m of pipe culvert placement; 6 Ha (hectares) hydraulic seeding; 580 L (liters) of pavement markings; 9,000 flagger hours.
This project will have one Schedule and four Options; Option W includes .68 miles of roadway improvements, Option X will be used for plantings and landscaping, Option Y places stone masonry on the bridge, and Option Z constructs masonry guide signs along the project.
It is anticipated this project will be advertised in March 2019 with construction beginning in June 2019 and extending through October 2020.
Estimated total cost for the project is $14,000,000 to $17,000,000.
Attachments
Show all 50
This notice has more attachments on GovTribe.
Notice history
| Notice | Type | Posted |
|---|---|---|
| WY TIGER US212(9) Beartooth Roadway | Award Notice | |
| WY TIGER US212(9) Beartooth Roadway | Solicitation |
On GovTribe
Work this opportunity on GovTribe
- Track it in your pipeline
- Find teaming partners
- Similar opportunities
- Ask GovTribe AI about this opportunity