13_Instrument_Monitoring.pdf
PDF 2 MB Posted
- Attached to
- WY TIGER US212(9) Beartooth Roadway Federal contract opportunity
- Solicitation number
- 6982AF19B000008
About this file
This document outlines a federal contract opportunity for roadway construction work. The project involves realigning and reconstructing 2.61 km of U.S. Route 212 in Wyoming, known as the Beartooth Highway, including a new 600 foot steel bridge. Additional work includes rock excavation, grading, drainage, aggregate base course, paving, traffic control, and public information. Principal work items include roadway excavation, structural backfill, mechanically stabilized earth walls, aggregate base, hot asphalt paving, pulverizing, structural concrete, structural steel, pipe culvert placement, hydraulic seeding, pavement markings, and flagger labor. The solicitation number is 6982AF19B000008 and is being issued by the Department of Transportation Federal Highway Administration. The project is located within the Shoshone National Forest and maintained by the National Park Service out of Yellowstone National Park. Construction is anticipated to begin in June 2019 and extend through October 2020, with an estimated total cost between $14-17 million.
Reference 13
View the file
Other files for this federal contract opportunity
Show all 50
WY TIGER US212(9) Beartooth Roadway has more files on GovTribe.
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
File details come from the government source that posted it. Updated .