22_WY.PFH.4-1(4).Beartooth_Highway.URS.Geotech-Four_Bridges.2003.pdf

PDF 17 KB Posted

Attached to
WY TIGER US212(9) Beartooth Roadway Federal contract opportunity
Solicitation number
6982AF19B000008
Issued by
Department of Transportation Federal Highway Administration

About this file

This memorandum provides additional geotechnical recommendations for four bridge projects on the Beartooth Highway in Wyoming. Steel H-piles may be used for foundations, with allowable working stresses of 82.8 MPa at all sites except the Beartooth Lake Outlet Bridge. At that site, HP12x74 or HP14x89 piles should be driven six meters into underlying cohesive soil to achieve capacities of 130-160 kN or 150-180 kN, respectively.

The federal contract opportunity is for roadway realignment and reconstruction work on 2.61 km of U.S. Route 212, the Beartooth Highway. The project includes excavation, grading, drainage, construction of a 600-foot steel bridge, mechanically stabilized earth walls, aggregate base course, paving, and traffic control. The estimated cost is $14-17 million. The solicitation number is 6982AF19B000008 and anticipated advertisement is March 28, 2019 through the Federal Highway Administration and Wyoming Department of Transportation. The construction period is from June 2019 to October 2020.

Reference 22

View the file

Other files for this federal contract opportunity

Other files attached to WY TIGER US212(9) Beartooth Roadway, newest first.
File Type Posted
Bid_Tabulation_WY_TIG_US212(9).pdf PDF
QnA_05.06.19.pdf PDF
QnA_05.01.19.pdf PDF
A002.pdf PDF
QnA_4.29.19_-_Final_QnA.pdf PDF
QnA_4.26.19.pdf PDF
A001_WY_TIG_US212(9)_Beartooth_Highway.pdf PDF
(A01)_wy09title.pdf PDF
QnA_4.25.19.pdf PDF
QnA_4.24.19.pdf PDF
26_WY.PFH.4.Beartooth_Highway.PBSJ_Wall.2004.PDF PDF
31_WY.PFH.4-1(4).Beartooth_Highway.Tech_Memo.Micropile_Types.2004.pdf PDF
18_Beartooth_Ravine_Retaining_Wall_Recommendation.pdf PDF
20_WY.PFH.4-1(4).Beartooth_Highway.URS.Ravine_Bridge.2003.pdf PDF
16_WY.PFH.4.Bearthooth_Highway.URS_Geotech.2002c.PDF PDF
2_WY.PFH.4.Beartooth_Highway.WWC_Geohazard.1998a.PDF PDF
11_WY.PFH.4.Beartooth_Highway.Tech_Memo_to_ERO_Piezometer_Wells.2001f.pdf PDF
17_WY.PFH.4.Beartooth_Highway.URS_Geotech.2002c.PDF PDF
1_WY.PFH.4.Beartooth_Highway.Materials.1998b.PDF PDF
27_Pile_Selection-Beartooth_Lake_Outlet_Bridge.pdf PDF
15_WY.PFH.4.Beartooth_Highway.URS_Geotech.2002b.PDF PDF
4_WY.PFH.4.Beartooth_Highway.URS_Geotech.1999c.PDF PDF
5_WY.PFH.4.Beartooth_Highway.NSA_Geophysics.2000.PDF PDF
7_WY.PFH.4.Beartooth_Highway.URS_Geotech.2001a.PDF PDF
24_WY.PFH.4.Beartooth_Highway.KF_Geotech.2003.PDF PDF
32_WY.PFH.4-1(4).Beartooth_Highway.Tech_Memo.Material_Source.2004.pdf PDF
19_ERO.pdf PDF
25_WY.PFH.4.Beartooth_Highway.PBSJ_Bridge_Treatments.2004a.PDF PDF
13_Instrument_Monitoring.pdf PDF
6_WY.PFH.4.Beartooth_Highway.Wall_Aesthetics.2001b.PDF PDF
28_WY.PFH.4-1(4).Beartooth_Highway.Tech_Memo.Slope_Stability.2004.pdf PDF
10_WY.PFH.4.Beartooth_Highway.URS_Geotech_Stations.2001e.pdf PDF
30_WY.PFH.4-1(4).Beartooth_Highway.Tech_Memo.Reference_Compilation.2004.pdf PDF
14_WY.PFH.4.Beartooth_Highway.URS_Wall_Feasibility.2002a.PDF PDF
21_WY.PFH.4-1(4).Beartooth_Highway.URS.Ravine_Bridge_Addendum.2003.pdf PDF
3_WY.PFH.4.Beartooth_Highway.Materials.1999b.PDF PDF
QnA_4.22.19_3_WY.PFH.4.Beartooth_Highway.Materials.1999b.pdf PDF
QnA_4.22.19_4_WY.PFH.4.Beartooth_Highway.URS_Geotech.1999c.PDF PDF
QnA_4.19.19.pdf PDF
QnA_4.12.19_clarification_4_12_19.pdf PDF
QnA_4.12.19.pdf PDF
QnA_4.10.19.pdf PDF
Appendix_F_-_Final_Fish_Passage_Recommendation_January_2005.pdf PDF
Final_Beartooth_Geotechnical_Memo.pdf PDF
Appendix_G_-_Revised_Final_Fish_Passage_Memo.pdf PDF
Appendix_E_-_roadclassificationrev.pdf PDF
Fen_Mitigation_Analysis_Memo.pdf PDF
WY09_Cross_Sections_02-20-2019_100_25_Add_Set.pdf PDF
6982AF19B000008.pdf PDF
WY09_Plan_Set_02-20-2019_100_25_Add_Set.pdf PDF
Show all 50

WY TIGER US212(9) Beartooth Roadway has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

N:\WY\wy4-1(4)\Geotech\7_FinalDocs\URS.Four Bridges Addendum.Memo.7-03.doc

TECHNICAL MEMORANDUM

To: Matt DeMarco Geotechnical Engineer Federal Highway Administration Central Federal Lands Division 555 Zang Street #259 Lakewood, CO 80228

From: Richard Tocher, P.E.

Project Manager

Date: July 29, 2003

Subject: Addendum No. 1, Geotechnical Investigation, Four Bridges, Beartooth

Highway U.S. 212 Park County, Wyoming FHWA T.O. No. DTFH68-01-T-00039 URS Project No. 22234609.00300

The following memorandum provides additional geotechnical recommendations for the design and construction of the four bridges, Beartooth Highway, U.S. 212, Park County, Wyoming.

We previously prepared a geotechnical investigation for the project with the results presented in a report dated November 6, 2002. We met on March 11, 003 to review the foundation recommendations. We have developed the following additional recommendations:

1. Bridges may be founded on HP 10x49, HP10x57, HP12x74 or HP14x89, depending on required capacity. All sites except Beartooth Lake Outlet should be designed for an allowable pile working stress of 82.8 MPa.

2. Steel H-piles at the Beartooth Lake Outlet Bridge should be driven into the underlying cohesive soil layer. A HP12x74 will develop an appropriate capacity of 130 to 160 kN when driven 6 meters into the cohesive layer. A HP14x89 will develop an approximate capacity of 150 to 180 kN when driven 6 meters into the cohesive layer.

cc: Tim Rogers, FHWA CFLHD, TECHNICAL MEMORANDUM

File details come from the government source that posted it. Updated .