This document provides a compilation of geotechnical references related to the Beartooth Highway project in Wyoming. It includes 27 technical reports, memoranda, and studies produced between 1998-2004 covering topics such as bridge and retaining wall foundations, earthwork, rock slopes, material sources, and landslides. The reports contain information on geology, subsurface investigations, hydrology, materials testing, and design recommendations for excavations, foundations, retaining walls, and slopes. Contractors are advised to review all applicable reports for any given subject.

The related federal contract opportunity is for roadway realignment and reconstruction work on 2.61 km of US 212 Beartooth Highway at an elevation of 10,950 feet. Scope includes rock excavation, grading, drainage, a 600 ft steel bridge, MSE walls, aggregate base course, paving, traffic control, and public information. Estimated costs range from $14-17 million. Bidding will open in March 2019 with construction from June 2019 to October 2020. The project involves four agencies and will be awarded on a full and open basis.

Reference 30

View the file

Other files for this federal contract opportunity

Other files attached to WY TIGER US212(9) Beartooth Roadway, newest first.
File Type Posted
Bid_Opening_Summary_WY_TIG_US212(9).pdf PDF
QnA_05.06.19.pdf PDF
QnA_05.01.19.pdf PDF
A002.pdf PDF
QnA_4.29.19_-_Final_QnA.pdf PDF
QnA_4.26.19.pdf PDF
A001_WY_TIG_US212(9)_Beartooth_Highway.pdf PDF
(A01)_wy09title.pdf PDF
(A06)_wy09site.PDF PDF
QnA_4.25.19_revision_1.pdf PDF
QnA_4.24.19.pdf PDF
13_Instrument_Monitoring.pdf PDF
22_WY.PFH.4-1(4).Beartooth_Highway.URS.Geotech-Four_Bridges.2003.pdf PDF
6_WY.PFH.4.Beartooth_Highway.Wall_Aesthetics.2001b.PDF PDF
28_WY.PFH.4-1(4).Beartooth_Highway.Tech_Memo.Slope_Stability.2004.pdf PDF
10_WY.PFH.4.Beartooth_Highway.URS_Geotech_Stations.2001e.pdf PDF
26_WY.PFH.4.Beartooth_Highway.PBSJ_Wall.2004.PDF PDF
31_WY.PFH.4-1(4).Beartooth_Highway.Tech_Memo.Micropile_Types.2004.pdf PDF
18_Beartooth_Ravine_Retaining_Wall_Recommendation.pdf PDF
20_WY.PFH.4-1(4).Beartooth_Highway.URS.Ravine_Bridge.2003.pdf PDF
16_WY.PFH.4.Bearthooth_Highway.URS_Geotech.2002c.PDF PDF
2_WY.PFH.4.Beartooth_Highway.WWC_Geohazard.1998a.PDF PDF
11_WY.PFH.4.Beartooth_Highway.Tech_Memo_to_ERO_Piezometer_Wells.2001f.pdf PDF
17_WY.PFH.4.Beartooth_Highway.URS_Geotech.2002c.PDF PDF
14_WY.PFH.4.Beartooth_Highway.URS_Wall_Feasibility.2002a.PDF PDF
21_WY.PFH.4-1(4).Beartooth_Highway.URS.Ravine_Bridge_Addendum.2003.pdf PDF
3_WY.PFH.4.Beartooth_Highway.Materials.1999b.PDF PDF
29_WY.PFH.4-1(4).Beartooth_Highway.Yeh.Tech_Memo.Talus_Grouting.2005.pdf PDF
33_Fen_Mitigation_Analysis_Memo.pdf PDF
9_WY.PFH.4.Beartooth_Highway.ERO_Soil.2001c.PDF PDF
1_WY.PFH.4.Beartooth_Highway.Materials.1998b.PDF PDF
27_Pile_Selection-Beartooth_Lake_Outlet_Bridge.pdf PDF
15_WY.PFH.4.Beartooth_Highway.URS_Geotech.2002b.PDF PDF
4_WY.PFH.4.Beartooth_Highway.URS_Geotech.1999c.PDF PDF
5_WY.PFH.4.Beartooth_Highway.NSA_Geophysics.2000.PDF PDF
7_WY.PFH.4.Beartooth_Highway.URS_Geotech.2001a.PDF PDF
QnA_4.22.19_4_WY.PFH.4.Beartooth_Highway.URS_Geotech.1999c.PDF PDF
QnA_4.22.19.pdf PDF
QnA_4.19.19.pdf PDF
QnA_4.12.19_clarification_4_12_19.pdf PDF
QnA_4.12.19.pdf PDF
QnA_4.10.19.pdf PDF
Fen_Mitigation_Analysis_Memo.pdf PDF
Appendix_F_-_Final_Fish_Passage_Recommendation_January_2005.pdf PDF
Final_Beartooth_Geotechnical_Memo.pdf PDF
Appendix_G_-_Revised_Final_Fish_Passage_Memo.pdf PDF
Appendix_E_-_roadclassificationrev.pdf PDF
WY09_Cross_Sections_02-20-2019_100_25_Add_Set.pdf PDF
WY09_Plan_Set_02-20-2019_100_25_Add_Set.pdf PDF
6982AF19B000008.pdf PDF
Show all 50

WY TIGER US212(9) Beartooth Roadway has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

To: Bert McCauley, Project Manager, CFLHD

From: Matt DeMarco, Geotechnical Engineer, CFLHD

Subject: Compilation of Geotechnical References, Beartooth Highway Project, WY HPP 4-1(4)

Since 1998, CFLHD has undertaken numerous geotechnical investigations along the (4) segment of the Beartooth Highway, ranging from conventional subsurface drilling and test pit investigations to state-of-the-art geophysical surveys. As a result, nearly thirty formal reports and/or Technical Memoranda have been produced covering a wide variety of topics, including bridge and retaining wall foundations, earthwork, rock slopes, material sources, and landslides, to name just a few. To assist Contractors in identifying relevant geotechnical references during construction, this memo presents a compilation of all related reports and memos, highlighting general contents of each, and conveniently tables priority references by geotechnical subject.

Each of the referenced documents, including all contract reports, is available from CFLHD.

General Category Specific Category Reference No.

Specific Project Locations and

Structures

Landslide at ~39+900 7, 9, 2 Beartooth Ravine Bridge 7, 12, 17, 19, 26 Beartooth Ravine Retaining Wall 7, 11, 19, 20, 23, 26 Beartooth Lake Outlet Bridge 7, 13, 19, 26, 22, 18 Little Bear Creek Bridges 7, 13, 26, 18 Fen Mitigation Bridge 7, 11, 19, 26 Long Lake Outlet Bridge 7, 13, 24, 26, 18 Ghost Creek and other material sources 3, 25, 24, 1

General Geotechnical

Topics

Local and regional geology/seismicity 7, 4, 2 Geotechnical hazards (general) 7, 2 Subsurface investigations – boring/test pit logs 7, 12, 13, 19, 24 Subsurface investigations – geophysical surveys 7, 5, 4 Surface and groundwater hydrology studies 15 Rock and soil laboratory testing 7, 8, 11, 12, 13, 19, 25 Material source investigations 3, 25, 24, 1 Earthwork information 7, 8, 24 Landslide/soil slope stability investigations 7, 9, 2 Rock slope investigations 7, 4, 2 Deep foundation design recommendations 7, 20, 26, 22, 18 Retaining wall design and construction 20, 23, 16, 14, 10, 6 Retaining wall and bridge aesthetic treatments 21, 6 Bridge and wall constructability 20, 11, 12, 10 Water/drainage problems 7, 15, 1

The reference numbers provided in this table refer to the complete references given in the next section. The primary geotechnical reference for the (4) project is the comprehensive study

Technical Memorandum

Date: November 24, 2004 performed by URS and reported on in the spring of 2001 (Reference 7). Reference numbers are listed in the approximate order of priority, with primary documents (first reference number in the list for a given topic) representing the latest engineering values or design summaries, or the greatest source of overall topic information.

The Contractor is cautioned that while later documents may contain information that supercedes prior documents, they may not be comprehensive in application. It is recommended that all reports pertaining to a particular subject be reviewed. Also, stationing referred to in the above table, and the following reference listing, is the stationing current at the time of the report.

Geotechnical-Related References

(1) FHWA, 1998, “Wyoming Beartooth Highway, Mile Post 24.5 to Mile Post 43.1, Preliminary

Materials Report,” CFLHD Geotechnical Report 98-16, Technical Services Branch, CFLHD-FHWA, Denver, CO, October 1998, 6 pp. (plus appendices).

• Materials source summary

• Water problems summary

• Maintenance requirements

• Culvert recommendations

• Roadway investigation and base/subgrade lab testing

• Preliminary pavement recommendations

• Site photos

(2) Woodward-Clyde Federal Services, 1998, “Initial Geohazards Evaluation and Geological

Study: Beartooth Highway, U.S. 212, Wyoming,” FHWA Contract Report, Woodward- Clyde Project No. FHAT0011, Denver, CO, October 27, 1998, 11 pp. (plus appendices).

• Regional geology and Seismicity

• Landslide hazard summary

• Rockfall hazard summary

• Slope stability hazard summary

• Talus ravel hazard summary

(3) FHWA, 1999, “Wyoming Beartooth Highway, Materials Source Investigation,” CFLHD

Geotechnical Report 99-14, Technical Services Branch, CFLHD-FHWA, Denver, CO, September 1999, 6 pp. (plus appendices).

• Ghost Creek and Station 52+000 material source investigation and lab testing

• Station 46+800 borrow source investigation

• Site photos, investigation maps, excavation logs

(4) URS Greiner Woodward-Clyde Federal Services, 1999, “Initial Geotechnical Investigation:

Beartooth Highway, U.S. 212, Wyoming,” FHWA Contract Report, URS Greiner Woodward-Clyde Project No. 68-FHAT002200, Denver, CO, October 29, 1999, 12 pp.

(plus appendices).

• Geologic mapping

• Rock fall hazard evaluation

• Seismic refraction surveys

• Site photos, road hazard rating survey sheets, rock slope maps

(5) NSA Engineering, Inc., 2000, “Tomographic Ground Imaging for the Beartooth Highway, U.S. 212, WY,” Contract Report for URS Corp. by NSA Engineering, Inc., Golden, CO, Dec. 8, 2000, 8 pp. (plus appendices).

• 2-D seismic tomographic imaging of the Beartooth Ravine area

(6) Holdeman Landscape Architecture, 2001, “Aesthetic Retaining Wall Options, Beartooth

Highway,” Contract Report for Washington Infrastructure Services by Holdeman Landscape Architecture, Denver, CO, April 2001, 13 pp. (plus appendices).

• Retaining wall aesthetic treatments

• CIP and MSE wall options

• Reinforced slope options

(7) URS Corp., 2001, “Final Report – Geotechnical Investigation of Selected Features:

Beartooth Highway, U.S. 212, WY,” FHWA Contract Report TO No. DTFH68-01-T- 00027, URS Corp., Denver, CO, April 3, 2001, 57 pp. (plus appendices).

• Project background o Geology summary o Prior URS/Woodward Clyde work summary

• Station 39+800 to 40+000 landslide investigation

• Beartooth Ravine Bridge o Subsurface investigation o Excavation options o Foundation options and design information o Constructability issues

• Beartooth Ravine Retaining Wall o Rock slope investigations o Subsurface investigations o Rock slope hazard mitigation options o Excavation options o Foundation options and design information o Constructability issues

• Beartooth Lake Outlet Bridge o Subsurface investigation o Foundation options and design information

• Little Bear Creek Bridges o Subsurface investigations o Foundation options and design information

• Fen Mitigation Bridge o Subsurface investigations o Foundation options and design information

• Long Lake Outlet Bridge o Subsurface investigations o Foundation options and design information

• Station 53+200 to 54+800 o Rock slope investigations o Rock slope hazard mitigation options

• Station 56+800 to 57+200 o Subsurface investigations o Retaining wall options and design information

• Bar Drift Area o Subsurface investigations

• General information o Foundation design information and recommendations o Retaining wall design information and recommendations o Excavation and constructability information o Earthwork information o Extensive boring and test pit logs o Site photos and investigation maps o Extensive laboratory testing o Seismic tomography overview o Seismic refraction overview o Rock cut mapping o Slope stability analyses o Inclinometer data

(8) ERO Resources Corp., 2001, “Topsoil Suitability Report: Portions of U.S. 212 (FH4), The

Beartooth Highway, Park County, WY,” ERO Resources Corp., Denver, CO, July, 2001, 22 pp. (plus appendices).

• Topsoil and surface rock surveys and mapping

• Topsoil quality testing

(9) URS Corp., 2002, “Technical Memorandum – Instrument Monitoring, Beartooth Highway, U.S. 212, Wyoming,” URS Project No. 68-FHAT0039.00, January 3, 2002, 3 pp.

• Preliminary inclinometer results at Station 39+980.

(10) URS Corp., 2002, “Final Report – Beartooth Highway Retaining Wall Feasibility Study and

Geotechnical Recommendations, Beartooth Highway, (U.S. 212, Park County), Wyoming,” FHWA Contract Report TO No. DTFH68-01-T-00039, URS Corp., Denver, CO, February 5, 2002, 30 pp. (plus appendices).

• Beartooth Ravine, Fen Mitigation, and Long Lake retaining wall design alternatives

• Order-of-magnitude cost evaluations

• Wall schematics and geology mapping

• Beartooth Ravine wall simulations

(11) URS Corp., 2002, “Final Report – Geotechnical Investigation, Beartooth Ravine and Fen

Mitigation Area, Beartooth Highway, U.S. 212, Park County, WY,” FHWA Contract Report TO No. DTFH68-01-T-00039, URS Corp., Denver, CO, September 23, 2002, 15 pp. (plus appendices).

• Beartooth Ravine o Additional subsurface investigations o Excavation options o Foundation options and design information o Constructability issues

• Fen Mitigation Area o Additional subsurface investigations o Foundation options and design information

• Boring logs

• Laboratory test results

(12) URS Corp., 2002, “Final Report – Geotechnical Investigation, Beartooth Ravine Bridge, Beartooth Highway, U.S. 212, Park County, WY,” FHWA Contract Report TO No.

DTFH68-01-T-00039, URS Corp., Denver, CO, November 5, 2002, 10 pp. (plus appendices).

• Additional subsurface investigations

• Excavation options

• Foundation options and design information

• Constructability issues

• Boring logs

(13) URS Corp., 2002, “Final Report – Geotechnical Investigation, Four Bridges, Beartooth

Highway, U.S. 212, Park County, WY,” FHWA Contract Report TO No. DTFH68-01-T- 00039, URS Corp., Denver, CO, November 6, 2002, 17 pp. (plus appendices).

• Beartooth Lake Outlet Bridge o Additional subsurface investigations o Foundation and retaining wall options and design information

• Little Bear Creek Bridges o Additional subsurface investigations o Foundation options and design information

• Long Lake Outlet Bridge o Additional subsurface investigations o Foundation and retaining wall options and design information

• Site photos

• Boring logs

• Site investigation maps

(14) URS Corp., 2003, “Technical Memorandum – Beartooth Ravine Wall Recommendation –

Draft,” URS Project No. 22234609.00300, May 5, 2003, 2 pp. (plus drawing).

• Preliminary Double-T cantilever wall design factors

(15) ERO Resources Corp., 2003, “Final Report – Wetlands Hydrology Report: The Beartooth

Highway, U.S. 121, Wyoming Forest Highway 4, Park County, Wyoming,” ERO Resources Corp., Denver, CO, May 30, 2003, 13 pp. (plus appendices).

• Hydrology investigations summary

• Wetland investigation mapping

• Monitoring well location mapping and data

(16) URS Corp., 2003, “Technical Memorandum – Beartooth Ravine Retaining Wall Structure

Selection Recommendation”, URS Project No. 22234609.00300, June 20, 2003, 2 pp.

• Pre-cast vs. CIP Z-wall summary

(17) URS Corp., 2003, “Technical Memorandum – Addendum No. 1, Beartooth Ravine Bridge, Geotechnical Investigation,” URS Project No. 22234609.00300, June 20, 2003, 1 pp.

• Additional foundation recommendations and design information for the Beartooth Ravine

Bridge

(18) URS Corp., 2003, “Technical Memorandum – Addendum No. 1, Geotechnical

Investigation, Four Bridges, Beartooth Highway, U.S. 212, Park County, WY,” URS Project No. 22234609.00300, July 29, 2003, 1 pp.

• Additional H-pile recommendations for the Beartooth Lake Outlet, Little Bear Creek No.s 1&2, and Long Lake Outlet Bridges

(19) Kleinfelder, Inc., 2003, “Final Report – Geotechnical Investigation Report, Beartooth

Highway Project, Shoshone National Forest, Park County, WY,” FHWA Contract Report TO No. DTFH68-03-T-00012, Kleinfelder, Inc., Colorado Springs, CO, December 19, 2003, 24 pp. (plus appendices).

• Additional subsurface investigations o Beartooth Ravine Bridge parking pull-out, abutments, and anticipated crane pads o Beartooth Ravine Wall o Beartooth Lake pull-out/bridge access o Fen Mitigation Bridge

• Boring logs

• Laboratory testing results

(20) PBS&J, 2004, “Beartooth Ravine Wall Report,” Beartooth Highway, FHWA Project –

Wyoming HPP4-1(4), February 24, 2004, 17 pp. (plus appendices).

• Beartooth Ravine retaining wall options summary

• Wall design information

• Wall constructability summary

• Wall and Ravine Bridge construction scheduling summary

(21) PBS&J, 2004, “Beartooth Ravine Bridge and Wall Aesthetics Treatments

Recommendations,” Beartooth Highway, FHWA Project – Wyoming HPP 4-1(4), March 2004, 9 pp. (plus appendices).

• Beartooth Ravine Bridge and wall aesthetic treatments

• Beartooth Outlet Bridge aesthetic treatments

(22) FHWA, 2004, “Technical Memorandum – Recommendations for Pile Selection, Beartooth Lake Outlet Bridge,” Technical Services Branch, CFLHD-FHWA, Denver, CO, March 10, 2004, 3 pp. (plus attachments).

• Reassessment of H-pile design requirements

• Design information and pile capacity information

(23) FHWA, 2004, “Technical Memorandum – Slope Stability Assessment for the Beartooth

Ravine Retaining Wall,” Technical Services Branch, CFLHD-FHWA, Denver, CO, April 30, 2004, 5 pp.

• Beartooth Ravine wall global stability assessment results and design information

• MSE retaining wall and surcharge load analysis results

(24) Kleinfelder, Inc., 2004, “Final Report – Geotechnical Investigation Report, Beartooth

Highway Project, Shoshone National Forest, Park County, WY,” FHWA Contract Report TO No. DTFH68-04-T-00015, Kleinfelder, Inc., Colorado Springs, CO, November 5, 2004, 18 pp. (plus appendices).

• Additional test pit investigations for subex requirements

• Site photos

• Test pit mapping and logging

• Sample collection summary

(25) FHWA, 2004, “Technical Memorandum – Compilation of Material Source Testing for the

Beartooth Highway Project, WY FS 4-1(4),” Technical Services Branch, CFLHD- FHWA, Denver, CO, November 22, 2004.

• Summary of material source lab data

(26) FHWA, 2004, “Technical Memorandum – Micropile Types and Ultimate Bond Stress

Values for Retaining Wall and Bridge Construction on the Beartooth Highway Project, WY FS 4-1(4),” Technical Services Branch, CFLHD-FHWA, Denver, CO, November 23, 2004.

• Micropile allowable bond stress design information compilation

(27) FHWA, 2004, “Technical Memorandum – Compilation of Geotechnical References, Beartooth Highway, WY HPP 4-1(4),” Technical Services Branch, CFLHD-FHWA, Denver, CO, November 24, 2004.

If we can be of any further assistance in this matter, please don’t hesitate to contact me directly at (720) 963-3520.

______________________________________________ Date_________________ Matthew J. DeMarco Lead Geotechnical Engineer, CFLHD

General Category
Geotechnical-Related References

File details come from the government source that posted it. Updated .