Bid_Opening_Summary_WY_TIG_US212(9).pdf
PDF 13 KB Posted
- Attached to
- WY TIGER US212(9) Beartooth Roadway Federal contract opportunity
- Solicitation number
- 6982AF19B000008
About this file
This document contains a bid opening summary and details for a federal contract opportunity for roadway reconstruction on the Beartooth Highway in Wyoming. The bid opening summary shows that three contractors submitted bids for the WY TIG US212(9) project, with bid totals ranging from $27.8 million to $31.9 million. The engineer's estimate for the project was $15.4 million.
The federal contract opportunity provides additional details on the proposed work for the WY TIGER US212(9) Beartooth Roadway project, which includes realignment and reconstruction of 1.6 miles of roadway and construction of a new 600-foot steel bridge. Major work items include roadway excavation, structural backfill, mechanically stabilized earth walls, aggregate base, asphalt paving, culvert placement, hydraulic seeding, and pavement markings. The project also includes four option items. The solicitation number is 6982AF19B000008 and the opportunity was advertised on a full and open basis by the Department of Transportation Federal Highway Administration. The anticipated construction period is June 2019 through October 2020, with an estimated total project cost of $14-17 million.
View the file
Other files for this federal contract opportunity
Show all 50
WY TIGER US212(9) Beartooth Roadway has more files on GovTribe.
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Bid Opening Summary
Project Name: Beartooth Highway Project Number: WY TIG US212(9)
Bid Opening Date: 05/09/2019 Time: 2:00 p.m.
Bid Opening Location: Lakewood, CO Bid Opening Officer: Leslie Karsten
Amendments: (1) 04/26/2019 (2) 04/30/2019
Bidder’s Name Bid Total
1. FirstMark Construction, LLC Billings, MT
A: $26,813,000.00 W: $4,150,000.00 X: $283,000.00 Y: $607,050.00 Z: $92,000.00 Total: $31,945,050.00
2. Missouri River Contractors Helena, MT
A: $22,934,353.74 W: $3,883,416.00 X: $195,373.00 Y: $673,800.00 Z: $130,500.00 Total: $27,817,442.74
3. Oftedal Construction Inc.
Miles City, MT
A: $23,910,598.00 W: $6,239,351.00 X: $223,385.00 Y: $824,450.00 Z: $173,400.00 Total: $31,371,184.00
Engineer’s Estimate
A: $11,819,475.00 W: $3,097,075.00 X: $339,000.00 Y: $122,000.00 Z: $59,000.00 Total: $15,436,550.00
All bids subject to verification
| Bid Opening Summary |
| Bid Opening Date: 05/09/2019 Time: 2:00 p.m. |
File details come from the government source that posted it. Updated .