Bid_Opening_Summary_WY_TIG_US212(9).pdf

PDF 13 KB Posted

Attached to
WY TIGER US212(9) Beartooth Roadway Federal contract opportunity
Solicitation number
6982AF19B000008
Issued by
Department of Transportation Federal Highway Administration

About this file

This document contains a bid opening summary and details for a federal contract opportunity for roadway reconstruction on the Beartooth Highway in Wyoming. The bid opening summary shows that three contractors submitted bids for the WY TIG US212(9) project, with bid totals ranging from $27.8 million to $31.9 million. The engineer's estimate for the project was $15.4 million.

The federal contract opportunity provides additional details on the proposed work for the WY TIGER US212(9) Beartooth Roadway project, which includes realignment and reconstruction of 1.6 miles of roadway and construction of a new 600-foot steel bridge. Major work items include roadway excavation, structural backfill, mechanically stabilized earth walls, aggregate base, asphalt paving, culvert placement, hydraulic seeding, and pavement markings. The project also includes four option items. The solicitation number is 6982AF19B000008 and the opportunity was advertised on a full and open basis by the Department of Transportation Federal Highway Administration. The anticipated construction period is June 2019 through October 2020, with an estimated total project cost of $14-17 million.

View the file

Other files for this federal contract opportunity

Other files attached to WY TIGER US212(9) Beartooth Roadway, newest first.
File Type Posted
Bid_Tabulation_WY_TIG_US212(9).pdf PDF
QnA_05.01.19.pdf PDF
A002.pdf PDF
QnA_4.29.19_-_Final_QnA.pdf PDF
QnA_4.26.19.pdf PDF
(A06)_wy09site.PDF PDF
(A01)_wy09title.pdf PDF
QnA_4.25.19_revision_1.pdf PDF
QnA_4.25.19.pdf PDF
QnA_4.24.19.pdf PDF
30_WY.PFH.4-1(4).Beartooth_Highway.Tech_Memo.Reference_Compilation.2004.pdf PDF
14_WY.PFH.4.Beartooth_Highway.URS_Wall_Feasibility.2002a.PDF PDF
21_WY.PFH.4-1(4).Beartooth_Highway.URS.Ravine_Bridge_Addendum.2003.pdf PDF
3_WY.PFH.4.Beartooth_Highway.Materials.1999b.PDF PDF
29_WY.PFH.4-1(4).Beartooth_Highway.Yeh.Tech_Memo.Talus_Grouting.2005.pdf PDF
33_Fen_Mitigation_Analysis_Memo.pdf PDF
9_WY.PFH.4.Beartooth_Highway.ERO_Soil.2001c.PDF PDF
13_Instrument_Monitoring.pdf PDF
22_WY.PFH.4-1(4).Beartooth_Highway.URS.Geotech-Four_Bridges.2003.pdf PDF
6_WY.PFH.4.Beartooth_Highway.Wall_Aesthetics.2001b.PDF PDF
28_WY.PFH.4-1(4).Beartooth_Highway.Tech_Memo.Slope_Stability.2004.pdf PDF
10_WY.PFH.4.Beartooth_Highway.URS_Geotech_Stations.2001e.pdf PDF
1_WY.PFH.4.Beartooth_Highway.Materials.1998b.PDF PDF
27_Pile_Selection-Beartooth_Lake_Outlet_Bridge.pdf PDF
15_WY.PFH.4.Beartooth_Highway.URS_Geotech.2002b.PDF PDF
4_WY.PFH.4.Beartooth_Highway.URS_Geotech.1999c.PDF PDF
5_WY.PFH.4.Beartooth_Highway.NSA_Geophysics.2000.PDF PDF
7_WY.PFH.4.Beartooth_Highway.URS_Geotech.2001a.PDF PDF
24_WY.PFH.4.Beartooth_Highway.KF_Geotech.2003.PDF PDF
32_WY.PFH.4-1(4).Beartooth_Highway.Tech_Memo.Material_Source.2004.pdf PDF
19_ERO.pdf PDF
25_WY.PFH.4.Beartooth_Highway.PBSJ_Bridge_Treatments.2004a.PDF PDF
26_WY.PFH.4.Beartooth_Highway.PBSJ_Wall.2004.PDF PDF
31_WY.PFH.4-1(4).Beartooth_Highway.Tech_Memo.Micropile_Types.2004.pdf PDF
18_Beartooth_Ravine_Retaining_Wall_Recommendation.pdf PDF
20_WY.PFH.4-1(4).Beartooth_Highway.URS.Ravine_Bridge.2003.pdf PDF
QnA_4.22.19_3_WY.PFH.4.Beartooth_Highway.Materials.1999b.pdf PDF
QnA_4.22.19.pdf PDF
QnA_4.22.19_4_WY.PFH.4.Beartooth_Highway.URS_Geotech.1999c.PDF PDF
QnA_4.19.19.pdf PDF
QnA_4.12.19_clarification_4_12_19.pdf PDF
QnA_4.10.19.pdf PDF
Fen_Mitigation_Analysis_Memo.pdf PDF
Final_Beartooth_Geotechnical_Memo.pdf PDF
Appendix_G_-_Revised_Final_Fish_Passage_Memo.pdf PDF
Appendix_E_-_roadclassificationrev.pdf PDF
Appendix_F_-_Final_Fish_Passage_Recommendation_January_2005.pdf PDF
WY09_Plan_Set_02-20-2019_100_25_Add_Set.pdf PDF
6982AF19B000008.pdf PDF
WY09_Cross_Sections_02-20-2019_100_25_Add_Set.pdf PDF
Show all 50

WY TIGER US212(9) Beartooth Roadway has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Bid Opening Summary

Project Name: Beartooth Highway Project Number: WY TIG US212(9)

Bid Opening Date: 05/09/2019 Time: 2:00 p.m.

Bid Opening Location: Lakewood, CO Bid Opening Officer: Leslie Karsten

Amendments: (1) 04/26/2019 (2) 04/30/2019

Bidder’s Name Bid Total

1. FirstMark Construction, LLC Billings, MT

A: $26,813,000.00 W: $4,150,000.00 X: $283,000.00 Y: $607,050.00 Z: $92,000.00 Total: $31,945,050.00

2. Missouri River Contractors Helena, MT

A: $22,934,353.74 W: $3,883,416.00 X: $195,373.00 Y: $673,800.00 Z: $130,500.00 Total: $27,817,442.74

3. Oftedal Construction Inc.

Miles City, MT

A: $23,910,598.00 W: $6,239,351.00 X: $223,385.00 Y: $824,450.00 Z: $173,400.00 Total: $31,371,184.00

Engineer’s Estimate

A: $11,819,475.00 W: $3,097,075.00 X: $339,000.00 Y: $122,000.00 Z: $59,000.00 Total: $15,436,550.00

All bids subject to verification

Bid Opening Summary
Bid Opening Date: 05/09/2019 Time: 2:00 p.m.