Bid_Tabulation_WY_TIG_US212(9).pdf

PDF 735 KB Posted

Attached to
WY TIGER US212(9) Beartooth Roadway Federal contract opportunity
Solicitation number
6982AF19B000008
Issued by
Department of Transportation Federal Highway Administration

About this file

This document contains a tabulation of bids report for the WY TIG US212(9) Beartooth Highway project. The project involves roadway realignment, reconstruction, drainage, a 600 foot steel bridge, MSE walls, aggregate base course, and paving along 2.61 kilometers of US 212 in Wyoming. Key work items in Schedule A include 44,000 cubic meters of roadway excavation, 800 cubic meters of structural backfill, 2,400 square meters of mechanically stabilized earth wall, 25,000 metric tons of aggregate base, 5,000 metric tons of hot asphalt paving, 10,000 square meters of pulverizing, 2,000 cubic meters of structural concrete, 291,700 kilograms of structural steel, 475 meters of pipe culvert placement, 6 hectares of hydraulic seeding, and 580 liters of pavement markings. The project also includes four options related to additional roadway improvements, plantings, bridge stone masonry, and guide sign construction. The bids from three contractors and engineer's estimates are provided for each line item. The report date is May 10, 2019.

View the file

Other files for this federal contract opportunity

Other files attached to WY TIGER US212(9) Beartooth Roadway, newest first.
File Type Posted
QnA_05.06.19.pdf PDF
QnA_05.01.19.pdf PDF
A002.pdf PDF
QnA_4.29.19_-_Final_QnA.pdf PDF
QnA_4.26.19.pdf PDF
A001_WY_TIG_US212(9)_Beartooth_Highway.pdf PDF
(A01)_wy09title.pdf PDF
QnA_4.25.19.pdf PDF
QnA_4.24.19.pdf PDF
1_WY.PFH.4.Beartooth_Highway.Materials.1998b.PDF PDF
27_Pile_Selection-Beartooth_Lake_Outlet_Bridge.pdf PDF
15_WY.PFH.4.Beartooth_Highway.URS_Geotech.2002b.PDF PDF
4_WY.PFH.4.Beartooth_Highway.URS_Geotech.1999c.PDF PDF
5_WY.PFH.4.Beartooth_Highway.NSA_Geophysics.2000.PDF PDF
7_WY.PFH.4.Beartooth_Highway.URS_Geotech.2001a.PDF PDF
24_WY.PFH.4.Beartooth_Highway.KF_Geotech.2003.PDF PDF
32_WY.PFH.4-1(4).Beartooth_Highway.Tech_Memo.Material_Source.2004.pdf PDF
19_ERO.pdf PDF
25_WY.PFH.4.Beartooth_Highway.PBSJ_Bridge_Treatments.2004a.PDF PDF
13_Instrument_Monitoring.pdf PDF
22_WY.PFH.4-1(4).Beartooth_Highway.URS.Geotech-Four_Bridges.2003.pdf PDF
6_WY.PFH.4.Beartooth_Highway.Wall_Aesthetics.2001b.PDF PDF
28_WY.PFH.4-1(4).Beartooth_Highway.Tech_Memo.Slope_Stability.2004.pdf PDF
10_WY.PFH.4.Beartooth_Highway.URS_Geotech_Stations.2001e.pdf PDF
26_WY.PFH.4.Beartooth_Highway.PBSJ_Wall.2004.PDF PDF
31_WY.PFH.4-1(4).Beartooth_Highway.Tech_Memo.Micropile_Types.2004.pdf PDF
18_Beartooth_Ravine_Retaining_Wall_Recommendation.pdf PDF
20_WY.PFH.4-1(4).Beartooth_Highway.URS.Ravine_Bridge.2003.pdf PDF
16_WY.PFH.4.Bearthooth_Highway.URS_Geotech.2002c.PDF PDF
2_WY.PFH.4.Beartooth_Highway.WWC_Geohazard.1998a.PDF PDF
11_WY.PFH.4.Beartooth_Highway.Tech_Memo_to_ERO_Piezometer_Wells.2001f.pdf PDF
17_WY.PFH.4.Beartooth_Highway.URS_Geotech.2002c.PDF PDF
30_WY.PFH.4-1(4).Beartooth_Highway.Tech_Memo.Reference_Compilation.2004.pdf PDF
14_WY.PFH.4.Beartooth_Highway.URS_Wall_Feasibility.2002a.PDF PDF
21_WY.PFH.4-1(4).Beartooth_Highway.URS.Ravine_Bridge_Addendum.2003.pdf PDF
3_WY.PFH.4.Beartooth_Highway.Materials.1999b.PDF PDF
QnA_4.22.19_3_WY.PFH.4.Beartooth_Highway.Materials.1999b.pdf PDF
QnA_4.22.19_4_WY.PFH.4.Beartooth_Highway.URS_Geotech.1999c.PDF PDF
QnA_4.19.19.pdf PDF
QnA_4.12.19_clarification_4_12_19.pdf PDF
QnA_4.12.19.pdf PDF
QnA_4.10.19.pdf PDF
Final_Beartooth_Geotechnical_Memo.pdf PDF
Appendix_G_-_Revised_Final_Fish_Passage_Memo.pdf PDF
Appendix_E_-_roadclassificationrev.pdf PDF
Fen_Mitigation_Analysis_Memo.pdf PDF
Appendix_F_-_Final_Fish_Passage_Recommendation_January_2005.pdf PDF
6982AF19B000008.pdf PDF
WY09_Cross_Sections_02-20-2019_100_25_Add_Set.pdf PDF
WY09_Plan_Set_02-20-2019_100_25_Add_Set.pdf PDF
Show all 50

WY TIGER US212(9) Beartooth Roadway has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Tabulation of Bids Report Date: 05/10/19

1 out of 47Source Selection Information - See FAR 2.101 & 3.104

Project No: WY TIG US212(9)

Project Name: Beartooth Highway

Contractor Responsive?

Engineer's Estimate

FirstMark Construction, LLC

Missouri River Contractors LLC

Oftedal Construction, Inc

Base Schedule A

$11,819,475.00

$26,813,000.00

$22,934,353.74

$23,910,598.00

Option: W

$3,097,075.00

$4,150,000.00

$3,883,416.00

$6,239,351.00

Option: X

$339,000.00

$283,000.00

$195,373.00

$223,385.00

Contractor Responsive?

Engineer's Estimate

FirstMark Construction, LLC

Missouri River Contractors LLC

Oftedal Construction, Inc

Option: Y

$122,000.00

$607,050.00

$673,800.00

$824,450.00

Option: Z

$59,000.00

$92,000.00

$130,500.00

$173,400.00

2 out of 47Source Selection Information - See FAR 2.101 & 3.104

Project No: WY TIG US212(9)

Project Name: Beartooth Highway

Contractor Responsive?

Engineer's Estimate

FirstMark Construction, LLC

Missouri River Contractors LLC

Oftedal Construction, Inc

Total Base Schedule A and Option(s): W

$14,916,550.00

$30,963,000.00

$26,817,769.74

$30,149,949.00

Total Base Schedule A and Option(s): WX

$15,255,550.00

$31,246,000.00

$27,013,142.74

$30,373,334.00

Total Base Schedule A and Option(s): WXY

$15,377,550.00

$31,853,050.00

$27,686,942.74

$31,197,784.00

Contractor Responsive?

Engineer's Estimate

FirstMark Construction, LLC

Missouri River Contractors LLC

Oftedal Construction, Inc

Total Base Schedule A and Option(s): WXZ

$15,314,550.00

$31,338,000.00

$27,143,642.74

$30,546,734.00

Total Base Schedule A and Option(s): WY

$15,038,550.00

$31,570,050.00

$27,491,569.74

$30,974,399.00

Total Base Schedule A and Option(s): WYZ

$15,097,550.00

$31,662,050.00

$27,622,069.74

$31,147,799.00

3 out of 47Source Selection Information - See FAR 2.101 & 3.104

Project No: WY TIG US212(9)

Project Name: Beartooth Highway

Contractor Responsive?

Engineer's Estimate

FirstMark Construction, LLC

Missouri River Contractors LLC

Oftedal Construction, Inc

Total Base Schedule A and Option(s): WZ

$14,975,550.00

$31,055,000.00

$26,948,269.74

$30,323,349.00

Total Base Schedule A and Option(s): X

$12,158,475.00

$27,096,000.00

$23,129,726.74

$24,133,983.00

Total Base Schedule A and Option(s): XY

$12,280,475.00

$27,703,050.00

$23,803,526.74

$24,958,433.00

Contractor Responsive?

Engineer's Estimate

FirstMark Construction, LLC

Missouri River Contractors LLC

Oftedal Construction, Inc

Total Base Schedule A and Option(s): XYZ

$12,339,475.00

$27,795,050.00

$23,934,026.74

$25,131,833.00

Total Base Schedule A and Option(s): XZ

$12,217,475.00

$27,188,000.00

$23,260,226.74

$24,307,383.00

Total Base Schedule A and Option(s): Y

$11,941,475.00

$27,420,050.00

$23,608,153.74

$24,735,048.00

4 out of 47Source Selection Information - See FAR 2.101 & 3.104

Project No: WY TIG US212(9)

Project Name: Beartooth Highway

Contractor Responsive?

Engineer's Estimate

FirstMark Construction, LLC

Missouri River Contractors LLC

Oftedal Construction, Inc

Total Base Schedule A and Option(s): YZ

$12,000,475.00

$27,512,050.00

$23,738,653.74

$24,908,448.00

Total Base Schedule A and Option(s): Z

$11,878,475.00

$26,905,000.00

$23,064,853.74

$24,083,998.00

Total Base Schedule A and Option(s): WXYZ

$15,436,550.00

$31,945,050.00

$27,817,442.74

$31,371,184.00

5 out of 47Source Selection Information - See FAR 2.101 & 3.104

Project No: WY TIG US212(9)

Project Name: Beartooth Highway

Schedule: A

Schedule Type: Base

Solcitation No: 6982AF19B000008

Division: Central Federal Lands

State: WY County: Park

Federal Land: Shoshone National Forest Opened at: Lakewood, CO

Opened by: Leslie Karsten

Date: 05/09/19

I certify that this Bid Tabulation accurately reflects the offers received for this solicitation.

Signed: _______________________________

Title: _______________________________

Date: _______________________________

Contract Awarded to: ____________________ Award Date: ____________________

Contractor Comment Bid Amount Responsive

Missouri River Contractors LLC $22,934,353.74 3384 E US Hwy 12 Helena, MT 59601

Oftedal Construction, Inc $23,910,598.00 P.O. Box 400 Miles City, MT 59301

FirstMark Construction, LLC $26,813,000.00 6611 Trade Center Ave Billings, MT 59101

Engineer's Estimate $11,819,475.00

6 out of 47Source Selection Information - See FAR 2.101 & 3.104

Project No: WY TIG US212(9)

Project Name: Beartooth Highway

Schedule: A

Schedule Type: Base

Line Item Pay Item No. Description Quantity Unit Unit Price Amount

Number

A0020 15101-0000 Mobilization

Missouri River Contractors LLC Lump Sum $2,910,000.00 Oftedal Construction, Inc Lump Sum $2,174,000.00 FirstMark Construction, LLC Lump Sum $2,575,645.00 Engineer's Estimate ALL LPSM Lump Sum $1,182,717.50

A0040 15206-0000 Slope, reference, and clearing and grubbing stake

Missouri River Contractors LLC $20,000.00 $23,460.00 Oftedal Construction, Inc $16,000.00 $18,768.00 FirstMark Construction, LLC $12,000.00 $14,076.00 Engineer's Estimate 1.173 km $10,000.00 $11,730.00

A0060 15214-1000 Survey and staking, bridge

Missouri River Contractors LLC Lump Sum $52,000.00 Oftedal Construction, Inc Lump Sum $21,000.00 FirstMark Construction, LLC Lump Sum $18,000.00 Engineer's Estimate ALL LPSM Lump Sum $50,000.00

A0080 15214-2000 Survey and staking, retaining wall

Missouri River Contractors LLC Lump Sum $45,000.00 Oftedal Construction, Inc Lump Sum $28,000.00 FirstMark Construction, LLC Lump Sum $20,000.00 Engineer's Estimate ALL LPSM Lump Sum $90,000.00

A0100 15215-3000 Survey and staking, drainage structure

Missouri River Contractors LLC $2,000.00 $10,000.00 Oftedal Construction, Inc $1,200.00 $6,000.00 FirstMark Construction, LLC $1,000.00 $5,000.00 Engineer's Estimate 5 Each $1,850.00 $9,250.00

A0120 15216-2000 Survey and staking, grade finishing stakes

Missouri River Contractors LLC $4,100.00 $9,618.60 Oftedal Construction, Inc $3,500.00 $8,211.00 FirstMark Construction, LLC $1,000.00 $2,346.00 Engineer's Estimate 2.346 km $7,500.00 $17,595.00

7 out of 47Source Selection Information - See FAR 2.101 & 3.104

Project No: WY TIG US212(9)

Project Name: Beartooth Highway

Schedule: A

Schedule Type: Base

Line Item Pay Item No. Description Quantity Unit Unit Price Amount

Number

A0140 15301-0000 Contractor quality control

Missouri River Contractors LLC Lump Sum $363,000.00 Oftedal Construction, Inc Lump Sum $346,000.00 FirstMark Construction, LLC Lump Sum $406,000.00 Engineer's Estimate ALL LPSM Lump Sum $120,000.00

A0160 15401-0000 Contractor testing

Missouri River Contractors LLC Lump Sum $150,000.00 Oftedal Construction, Inc Lump Sum $290,000.00 FirstMark Construction, LLC Lump Sum $320,000.00 Engineer's Estimate ALL LPSM Lump Sum $120,000.00

A0180 15501-0000 Construction schedule

Missouri River Contractors LLC Lump Sum $25,000.00 Oftedal Construction, Inc Lump Sum $20,000.00 FirstMark Construction, LLC Lump Sum $50,000.00 Engineer's Estimate ALL LPSM Lump Sum $25,000.00

A0200 15703-1500 Soil erosion control, temporary soil tackifier

Missouri River Contractors LLC $7,000.00 $16,800.00 Oftedal Construction, Inc $1,800.00 $4,320.00 FirstMark Construction, LLC $1,400.00 $3,360.00 Engineer's Estimate 2.400 ha $1,800.00 $4,320.00

A0220 15705-0100 Soil erosion control, silt fence

Missouri River Contractors LLC $15.00 $11,700.00 Oftedal Construction, Inc $20.00 $15,600.00 FirstMark Construction, LLC $19.00 $14,820.00 Engineer's Estimate 780 m $14.00 $10,920.00

A0240 15705-1400 Soil erosion control, sediment log Soil erosion control, sediment log

Missouri River Contractors LLC $65.00 $2,600.00 Oftedal Construction, Inc $20.00 $800.00 FirstMark Construction, LLC $45.00 $1,800.00 Engineer's Estimate 40 m $16.00 $640.00

8 out of 47Source Selection Information - See FAR 2.101 & 3.104

Project No: WY TIG US212(9)

Project Name: Beartooth Highway

Schedule: A

Schedule Type: Base

Line Item Pay Item No. Description Quantity Unit Unit Price Amount

Number

A0260 15706-0200 Soil erosion control, check dam

Missouri River Contractors LLC $235.00 $1,175.00 Oftedal Construction, Inc $300.00 $1,500.00 FirstMark Construction, LLC $500.00 $2,500.00 Engineer's Estimate 5 Each $215.00 $1,075.00

A0280 15706-0300 Soil erosion control, sandbag

Missouri River Contractors LLC $40.00 $2,600.00 Oftedal Construction, Inc $12.00 $780.00 FirstMark Construction, LLC $130.00 $8,450.00 Engineer's Estimate 65 Each $35.00 $2,275.00

A0300 15706-1600 Soil erosion control, stabilized construction entrance

Missouri River Contractors LLC $20,000.00 $20,000.00 Oftedal Construction, Inc $2,000.00 $2,000.00 FirstMark Construction, LLC $50,000.00 $50,000.00 Engineer's Estimate 1 Each $3,500.00 $3,500.00

A0320 15802-0000 Watering for dust control

Missouri River Contractors LLC Lump Sum $30,000.00 Oftedal Construction, Inc Lump Sum $22,000.00 FirstMark Construction, LLC Lump Sum $190,000.00 Engineer's Estimate ALL LPSM Lump Sum $35,000.00

A0340 20101-0000 Clearing and grubbing

Missouri River Contractors LLC $9,300.00 $33,945.00 Oftedal Construction, Inc $70,000.00 $255,500.00 FirstMark Construction, LLC $125,000.00 $456,250.00 Engineer's Estimate 3.650 ha $8,000.00 $29,200.00

A0360 20206-0000 Selective clearing and grubbing

Missouri River Contractors LLC $50.00 $1,500.00 Oftedal Construction, Inc $90.00 $2,700.00 FirstMark Construction, LLC $400.00 $12,000.00 Engineer's Estimate 30 m2 $40.00 $1,200.00

9 out of 47Source Selection Information - See FAR 2.101 & 3.104

Project No: WY TIG US212(9)

Project Name: Beartooth Highway

Schedule: A

Schedule Type: Base

Line Item Pay Item No. Description Quantity Unit Unit Price Amount

Number

A0380 20301-1900 Removal of pipe culvert

Missouri River Contractors LLC $1,500.00 $7,500.00 Oftedal Construction, Inc $2,300.00 $11,500.00 FirstMark Construction, LLC $4,000.00 $20,000.00 Engineer's Estimate 5 Each $2,000.00 $10,000.00

A0400 20301-2400 Removal of signs

Missouri River Contractors LLC $200.00 $200.00 Oftedal Construction, Inc $155.00 $155.00 FirstMark Construction, LLC $330.00 $330.00 Engineer's Estimate 1 Each $200.00 $200.00

A0420 20302-1200 Removal of guardrail

Missouri River Contractors LLC $26.00 $20,020.00 Oftedal Construction, Inc $6.00 $4,620.00 FirstMark Construction, LLC $31.00 $23,870.00 Engineer's Estimate 770 m $10.00 $7,700.00

A0440 20303-1600 Removal of pavement, asphalt

Missouri River Contractors LLC $6.00 $25,200.00 Oftedal Construction, Inc $6.00 $25,200.00 FirstMark Construction, LLC $8.00 $33,600.00 Engineer's Estimate 4,200 m2 $5.00 $21,000.00

A0460 20401-0000 Roadway excavation

Missouri River Contractors LLC $33.00 $1,204,500.00 Oftedal Construction, Inc $75.00 $2,737,500.00 FirstMark Construction, LLC $80.00 $2,920,000.00 Engineer's Estimate 36,500 m3 $13.00 $474,500.00

A0480 20402-0000 Subexcavation

Missouri River Contractors LLC $150.00 $75,000.00 Oftedal Construction, Inc $115.00 $57,500.00 FirstMark Construction, LLC $214.00 $107,000.00 Engineer's Estimate 500 m3 $60.00 $30,000.00

10 out of 47Source Selection Information - See FAR 2.101 & 3.104

Project No: WY TIG US212(9)

Project Name: Beartooth Highway

Schedule: A

Schedule Type: Base

Line Item Pay Item No. Description Quantity Unit Unit Price Amount

Number

A0500 20441-0000 Waste

Missouri River Contractors LLC $12.00 $372,000.00 Oftedal Construction, Inc $15.00 $465,000.00 FirstMark Construction, LLC $35.00 $1,085,000.00 Engineer's Estimate 31,000 m3 $10.00 $310,000.00

A0520 20701-0700 Earthwork geotextile, type II-A

Missouri River Contractors LLC $4.50 $8,100.00 Oftedal Construction, Inc $5.00 $9,000.00 FirstMark Construction, LLC $9.00 $16,200.00 Engineer's Estimate 1,800 m2 $3.50 $6,300.00

A0540 20801-0000 Structure excavation

Missouri River Contractors LLC $25.00 $22,500.00 Oftedal Construction, Inc $40.00 $36,000.00 FirstMark Construction, LLC $440.00 $396,000.00 Engineer's Estimate 900 m3 $100.00 $90,000.00

A0560 20803-0000 Structural backfill

Missouri River Contractors LLC $25.00 $10,500.00 Oftedal Construction, Inc $145.00 $60,900.00 FirstMark Construction, LLC $175.00 $73,500.00 Engineer's Estimate 420 m3 $100.00 $42,000.00

A0580 20811-0000 Shoring and bracing (Ravine Bridge)

Missouri River Contractors LLC $1,500.00 $630,000.00 Oftedal Construction, Inc $825.00 $346,500.00 FirstMark Construction, LLC $1,125.00 $472,500.00 Engineer's Estimate 420 m2 $500.00 $210,000.00

A0600 20811-0000 Shoring and bracing (Ravine Wall)

Missouri River Contractors LLC $900.00 $2,385,000.00 Oftedal Construction, Inc $550.00 $1,457,500.00 FirstMark Construction, LLC $960.00 $2,544,000.00 Engineer's Estimate 2,650 m2 $200.00 $530,000.00

11 out of 47Source Selection Information - See FAR 2.101 & 3.104

Project No: WY TIG US212(9)

Project Name: Beartooth Highway

Schedule: A

Schedule Type: Base

Line Item Pay Item No. Description Quantity Unit Unit Price Amount

Number

A0620 21101-1000 Roadway obliteration, method 1

Missouri River Contractors LLC $12.00 $19,200.00 Oftedal Construction, Inc $10.00 $16,000.00 FirstMark Construction, LLC $5.00 $8,000.00 Engineer's Estimate 1,600 m2 $17.00 $27,200.00

A0640 25101-2000 Placed riprap, class 2

Missouri River Contractors LLC $112.00 $560.00 Oftedal Construction, Inc $90.00 $450.00 FirstMark Construction, LLC $300.00 $1,500.00 Engineer's Estimate 5 m3 $160.00 $800.00

A0660 25120-2000 Riprap ditch, class 2

Missouri River Contractors LLC $300.00 $12,000.00 Oftedal Construction, Inc $90.00 $3,600.00 FirstMark Construction, LLC $120.00 $4,800.00 Engineer's Estimate 40 m $250.00 $10,000.00

A0680 25125-0000 Boulder

Missouri River Contractors LLC $225.00 $7,875.00 Oftedal Construction, Inc $250.00 $8,750.00 FirstMark Construction, LLC $600.00 $21,000.00 Engineer's Estimate 35 Each $280.00 $9,800.00

A0700 25501-0000 Mechanically stabilized earth wall

Missouri River Contractors LLC $425.00 $1,317,500.00 Oftedal Construction, Inc $1,200.00 $3,720,000.00 FirstMark Construction, LLC $1,250.00 $3,875,000.00 Engineer's Estimate 3,100 m2 $375.00 $1,162,500.00

A0740 30101-0000 Aggregate base

Missouri River Contractors LLC $30.00 $345,000.00 Oftedal Construction, Inc $50.00 $575,000.00 FirstMark Construction, LLC $36.00 $414,000.00 Engineer's Estimate 11,500 t $27.00 $310,500.00

12 out of 47Source Selection Information - See FAR 2.101 & 3.104

Project No: WY TIG US212(9)

Project Name: Beartooth Highway

Schedule: A

Schedule Type: Base

Line Item Pay Item No. Description Quantity Unit Unit Price Amount

Number

A0760 40301-0000 Hot asphalt concrete pavement

Missouri River Contractors LLC $150.00 $465,000.00 Oftedal Construction, Inc $190.00 $589,000.00 FirstMark Construction, LLC $170.00 $527,000.00 Engineer's Estimate 3,100 t $135.00 $418,500.00

A0780 40920-1000 Fog seal, emulsified asphalt grade CSS-1 or CSS-1h, SS-1 or SS-1h

Missouri River Contractors LLC $1,200.00 $8,400.00 Oftedal Construction, Inc $1,100.00 $7,700.00 FirstMark Construction, LLC $1,000.00 $7,000.00 Engineer's Estimate 7.0 t $850.00 $5,950.00

A0800 41103-0000 Prime coat (Method 1)

Missouri River Contractors LLC $1.25 $18,750.00 Oftedal Construction, Inc $1.10 $16,500.00 FirstMark Construction, LLC $1.00 $15,000.00 Engineer's Estimate 15,000 m2 $1.80 $27,000.00

A0820 41105-0000 Blotter

Missouri River Contractors LLC $15.00 $1,800.00 Oftedal Construction, Inc $45.00 $5,400.00 FirstMark Construction, LLC $65.00 $7,800.00 Engineer's Estimate 120 t $55.00 $6,600.00

A0840 41201-1000 Tack coat grade CSS-1, CSS-1h, SS-1, or SS-1h

Missouri River Contractors LLC $1,500.00 $12,000.00 Oftedal Construction, Inc $1,100.00 $8,800.00 FirstMark Construction, LLC $1,000.00 $8,000.00 Engineer's Estimate 8.0 t $760.00 $6,080.00

A0860 55201-0200 Structural concrete, class A (AE) (Ravine Bridge)

Missouri River Contractors LLC $3,000.00 $2,994,000.00 Oftedal Construction, Inc $2,200.00 $2,195,600.00 FirstMark Construction, LLC $2,400.00 $2,395,200.00 Engineer's Estimate 998 m3 $1,700.00 $1,696,600.00

13 out of 47Source Selection Information - See FAR 2.101 & 3.104

Project No: WY TIG US212(9)

Project Name: Beartooth Highway

Schedule: A

Schedule Type: Base

Line Item Pay Item No. Description Quantity Unit Unit Price Amount

Number

A0880 55401-1000 Reinforcing steel

Missouri River Contractors LLC $5.00 $291,500.00 Oftedal Construction, Inc $1.60 $93,280.00 FirstMark Construction, LLC $4.00 $233,200.00 Engineer's Estimate 58,300 kg $2.00 $116,600.00

A0900 55401-2000 Reinforcing steel, epoxy coated

Missouri River Contractors LLC $5.00 $515,500.00 Oftedal Construction, Inc $4.50 $463,950.00 FirstMark Construction, LLC $4.00 $412,400.00 Engineer's Estimate 103,100 kg $2.25 $231,975.00

A0920 55502-0000 Structural steel, furnished, fabricated, and erected

Missouri River Contractors LLC $11.00 $3,325,300.00 Oftedal Construction, Inc $9.70 $2,932,310.00 FirstMark Construction, LLC $7.25 $2,191,675.00 Engineer's Estimate 302,300 kg $5.00 $1,511,500.00

A0940 55503-0000 Bridge expansion joints

Missouri River Contractors LLC $1,800.00 $46,350.00 Oftedal Construction, Inc $1,700.00 $43,775.00 FirstMark Construction, LLC $1,660.00 $42,745.00 Engineer's Estimate 25.75 m $330.00 $8,497.50

A0960 55601-0900 Bridge railing, steel (WYDOT TL-3)

Missouri River Contractors LLC $850.00 $239,700.00 Oftedal Construction, Inc $900.00 $253,800.00 FirstMark Construction, LLC $1,300.00 $366,600.00 Engineer's Estimate 282 m $600.00 $169,200.00

A0980 56305-0000 Rock stain

Missouri River Contractors LLC $13.00 $104,000.00 Oftedal Construction, Inc $28.00 $224,000.00 FirstMark Construction, LLC $11.00 $88,000.00 Engineer's Estimate 8,000 m2 $32.00 $256,000.00

14 out of 47Source Selection Information - See FAR 2.101 & 3.104

Project No: WY TIG US212(9)

Project Name: Beartooth Highway

Schedule: A

Schedule Type: Base

Line Item Pay Item No. Description Quantity Unit Unit Price Amount

Number

A1000 56401-1000 Bearing device, elastomeric

Missouri River Contractors LLC $6,800.00 $108,800.00 Oftedal Construction, Inc $6,600.00 $105,600.00 FirstMark Construction, LLC $5,300.00 $84,800.00 Engineer's Estimate 16 Each $3,000.00 $48,000.00

A1020 56501-0200 Drilled shafts, 600mm diameter

Missouri River Contractors LLC $5,000.00 $825,000.00 Oftedal Construction, Inc $4,900.00 $808,500.00 FirstMark Construction, LLC $6,300.00 $1,039,500.00 Engineer's Estimate 165 m $1,000.00 $165,000.00

A1040 56501-0500 Drilled shafts, 1050mm diameter

Missouri River Contractors LLC $33,000.00 $891,000.00 Oftedal Construction, Inc $12,600.00 $340,200.00 FirstMark Construction, LLC $16,000.00 $432,000.00 Engineer's Estimate 27 m $3,000.00 $81,000.00

A1060 60201-0800 600mm pipe culvert

Missouri River Contractors LLC $550.00 $71,500.00 Oftedal Construction, Inc $780.00 $101,400.00 FirstMark Construction, LLC $875.00 $113,750.00 Engineer's Estimate 130 m $300.00 $39,000.00

A1080 60210-0800 End section for 600mm pipe culvert

Missouri River Contractors LLC $800.00 $1,600.00 Oftedal Construction, Inc $290.00 $580.00 FirstMark Construction, LLC $800.00 $1,600.00 Engineer's Estimate 2 Each $450.00 $900.00

A1100 60212-0800 Elbow, 600mm

Missouri River Contractors LLC $1,600.00 $12,800.00 Oftedal Construction, Inc $1,320.00 $10,560.00 FirstMark Construction, LLC $400.00 $3,200.00 Engineer's Estimate 8 Each $700.00 $5,600.00

15 out of 47Source Selection Information - See FAR 2.101 & 3.104

Project No: WY TIG US212(9)

Project Name: Beartooth Highway

Schedule: A

Schedule Type: Base

Line Item Pay Item No. Description Quantity Unit Unit Price Amount

Number

A1120 60404-1000 Catch basin, type 1

Missouri River Contractors LLC $9,000.00 $36,000.00 Oftedal Construction, Inc $10,500.00 $42,000.00 FirstMark Construction, LLC $10,000.00 $40,000.00 Engineer's Estimate 4 Each $6,000.00 $24,000.00

A1140 60504-0000 Geocomposite sheet drain system

Missouri River Contractors LLC $28.00 $5,600.00 Oftedal Construction, Inc $110.00 $22,000.00 FirstMark Construction, LLC $32.50 $6,500.00 Engineer's Estimate 200 m2 $50.00 $10,000.00

A1160 60901-0400 Curb, concrete, 150mm depth

Missouri River Contractors LLC $400.00 $300,000.00 Oftedal Construction, Inc $400.00 $300,000.00 FirstMark Construction, LLC $345.00 $258,750.00 Engineer's Estimate 750 m $200.00 $150,000.00

A1180 60901-1200 Curb, concrete, 350mm depth (Flush)

Missouri River Contractors LLC $275.00 $16,500.00 Oftedal Construction, Inc $270.00 $16,200.00 FirstMark Construction, LLC $235.00 $14,100.00 Engineer's Estimate 60 m $100.00 $6,000.00

A1200 60908-1000 Paved ditch, asphalt

Missouri River Contractors LLC $46.00 $43,700.00 Oftedal Construction, Inc $66.00 $62,700.00 FirstMark Construction, LLC $40.00 $38,000.00 Engineer's Estimate 950 m2 $65.00 $61,750.00

A1220 61501-0100 Sidewalk, concrete (125 mm depth)

Missouri River Contractors LLC $402.00 $56,280.00 Oftedal Construction, Inc $375.00 $52,500.00 FirstMark Construction, LLC $310.00 $43,400.00 Engineer's Estimate 140 m2 $120.00 $16,800.00

16 out of 47Source Selection Information - See FAR 2.101 & 3.104

Project No: WY TIG US212(9)

Project Name: Beartooth Highway

Schedule: A

Schedule Type: Base

Line Item Pay Item No. Description Quantity Unit Unit Price Amount

Number

A1240 61701-1800 Guardrail system G4, type 4, class A steel posts

Missouri River Contractors LLC $119.00 $74,970.00 Oftedal Construction, Inc $100.00 $63,000.00 FirstMark Construction, LLC $105.00 $66,150.00 Engineer's Estimate 630 m $245.00 $154,350.00

A1260 61702-0600 Terminal section, type flared (G4 W-Beam)

Missouri River Contractors LLC $3,900.00 $23,400.00 Oftedal Construction, Inc $5,050.00 $30,300.00 FirstMark Construction, LLC $3,500.00 $21,000.00 Engineer's Estimate 6 Each $2,500.00 $15,000.00

A1280 61707-0000 Structure transition railing

Missouri River Contractors LLC $992.00 $30,256.00 Oftedal Construction, Inc $650.00 $19,825.00 FirstMark Construction, LLC $880.00 $26,840.00 Engineer's Estimate 30.5 m $350.00 $10,675.00

A1300 62201-0150 Dump truck, 7 cubic meter minimum capacity

Missouri River Contractors LLC $148.00 $26,640.00 Oftedal Construction, Inc $150.00 $27,000.00 FirstMark Construction, LLC $185.00 $33,300.00 Engineer's Estimate 180 Hour $140.00 $25,200.00

A1320 62201-0350 Backhoe

Missouri River Contractors LLC $159.00 $12,720.00 Oftedal Construction, Inc $130.00 $10,400.00 FirstMark Construction, LLC $230.00 $18,400.00 Engineer's Estimate 80 Hour $130.00 $10,400.00

A1340 62201-0900 Wheel loader, 2 cubic meter minimum rated capacity

Missouri River Contractors LLC $159.00 $6,360.00 Oftedal Construction, Inc $150.00 $6,000.00 FirstMark Construction, LLC $240.00 $9,600.00 Engineer's Estimate 40 Hour $120.00 $4,800.00

17 out of 47Source Selection Information - See FAR 2.101 & 3.104

Project No: WY TIG US212(9)

Project Name: Beartooth Highway

Schedule: A

Schedule Type: Base

Line Item Pay Item No. Description Quantity Unit Unit Price Amount

Number

A1360 62201-1300 Bulldozer, 120kW minimum flywheel power

Missouri River Contractors LLC $285.00 $11,400.00 Oftedal Construction, Inc $250.00 $10,000.00 FirstMark Construction, LLC $330.00 $13,200.00 Engineer's Estimate 40 Hour $180.00 $7,200.00

A1380 62201-2850 Motor grader, 3.6 meter minimum blade

Missouri River Contractors LLC $180.00 $7,200.00 Oftedal Construction, Inc $150.00 $6,000.00 FirstMark Construction, LLC $230.00 $9,200.00 Engineer's Estimate 40 Hour $170.00 $6,800.00

A1400 62201-3000 Hydraulic excavator

Missouri River Contractors LLC $247.00 $9,880.00 Oftedal Construction, Inc $220.00 $8,800.00 FirstMark Construction, LLC $250.00 $10,000.00 Engineer's Estimate 40 Hour $170.00 $6,800.00

A1420 62201-3150 Hydraulic excavator, crawler mounted, 0.7m3 minimum capacity with thumb attachment

Missouri River Contractors LLC $128.00 $10,240.00 Oftedal Construction, Inc $220.00 $17,600.00 FirstMark Construction, LLC $300.00 $24,000.00 Engineer's Estimate 80 Hour $160.00 $12,800.00

A1440 62301-0000 General labor

Missouri River Contractors LLC $73.00 $2,920.00 Oftedal Construction, Inc $82.00 $3,280.00 FirstMark Construction, LLC $100.00 $4,000.00 Engineer's Estimate 40 Hour $65.00 $2,600.00

A1460 62302-0100 Special labor, slope scaling

Missouri River Contractors LLC $475.00 $28,500.00 Oftedal Construction, Inc $220.00 $13,200.00 FirstMark Construction, LLC $180.00 $10,800.00 Engineer's Estimate 60 Hour $400.00 $24,000.00

18 out of 47Source Selection Information - See FAR 2.101 & 3.104

Project No: WY TIG US212(9)

Project Name: Beartooth Highway

Schedule: A

Schedule Type: Base

Line Item Pay Item No. Description Quantity Unit Unit Price Amount

Number

A1480 62302-1000 Special labor, hired technical services

Missouri River Contractors LLC $147.00 $8,820.00 Oftedal Construction, Inc $160.00 $9,600.00 FirstMark Construction, LLC $130.00 $7,800.00 Engineer's Estimate 60 Hour $145.00 $8,700.00

A1500 62302-1100 Special labor, hired survey services

Missouri River Contractors LLC $198.00 $11,880.00 Oftedal Construction, Inc $165.00 $9,900.00 FirstMark Construction, LLC $150.00 $9,000.00 Engineer's Estimate 60 Hour $165.00 $9,900.00

A1520 62407-0000 Placing conserved topsoil

Missouri River Contractors LLC $3.00 $10,950.00 Oftedal Construction, Inc $16.00 $58,400.00 FirstMark Construction, LLC $35.00 $127,750.00 Engineer's Estimate 3,650 m3 $12.00 $43,800.00

A1540 62510-2000 Seeding, hydraulic method (Seed Mix D: Forbs)

Missouri River Contractors LLC $11,000.00 $15,400.00 Oftedal Construction, Inc $6,000.00 $8,400.00 FirstMark Construction, LLC $5,500.00 $7,700.00 Engineer's Estimate 1.40 ha $11,000.00 $15,400.00

A1560 62510-2000 Seeding, hydraulic method (Seed Mix B: <44+900)

Missouri River Contractors LLC $10,000.00 $25,000.00 Oftedal Construction, Inc $2,200.00 $5,500.00 FirstMark Construction, LLC $2,000.00 $5,000.00 Engineer's Estimate 2.50 ha $8,000.00 $20,000.00

A1580 62510-2000 Seeding, hydraulic method (Seed Mix E: Ghost Creek)

Missouri River Contractors LLC $14,000.00 $65,800.00 Oftedal Construction, Inc $4,700.00 $22,090.00 FirstMark Construction, LLC $4,250.00 $19,975.00 Engineer's Estimate 4.70 ha $8,000.00 $37,600.00

19 out of 47Source Selection Information - See FAR 2.101 & 3.104

Project No: WY TIG US212(9)

Project Name: Beartooth Highway

Schedule: A

Schedule Type: Base

Line Item Pay Item No. Description Quantity Unit Unit Price Amount

Number

A1600 62510-2000 Seeding, hydraulic method (Seed Mix A: Riparian/Wetland)

Missouri River Contractors LLC $10,000.00 $3,000.00 Oftedal Construction, Inc $5,000.00 $1,500.00 FirstMark Construction, LLC $4,500.00 $1,350.00 Engineer's Estimate 0.30 ha $8,000.00 $2,400.00

A1620 62515-3000 Mulching, hydraulic method, bonded fiber matrix

Missouri River Contractors LLC $20,000.00 $42,000.00 Oftedal Construction, Inc $9,800.00 $20,580.00 FirstMark Construction, LLC $8,890.00 $18,669.00 Engineer's Estimate 2.10 ha $9,000.00 $18,900.00

A1640 62520-0000 Fertilizer (Organic)

Missouri River Contractors LLC $850.00 $1,785.00 Oftedal Construction, Inc $4,700.00 $9,870.00 FirstMark Construction, LLC $4,250.00 $8,925.00 Engineer's Estimate 2.10 ha $4,000.00 $8,400.00

A1660 62901-0700 Rolled erosion control product, type 2.C

Missouri River Contractors LLC $4.75 $18,525.00 Oftedal Construction, Inc $3.50 $13,650.00 FirstMark Construction, LLC $10.00 $39,000.00 Engineer's Estimate 3,900 m2 $5.00 $19,500.00

A1680 63301-0000 Sign system

Missouri River Contractors LLC $1,500.00 $19,500.00 Oftedal Construction, Inc $1,500.00 $19,500.00 FirstMark Construction, LLC $1,350.00 $17,550.00 Engineer's Estimate 13 Each $1,100.00 $14,300.00

A1700 63309-0100 Delineator, type 1

Missouri River Contractors LLC $39.00 $2,535.00 Oftedal Construction, Inc $39.00 $2,535.00 FirstMark Construction, LLC $65.00 $4,225.00 Engineer's Estimate 65 Each $55.00 $3,575.00

20 out of 47Source Selection Information - See FAR 2.101 & 3.104

Project No: WY TIG US212(9)

Project Name: Beartooth Highway

Schedule: A

Schedule Type: Base

Line Item Pay Item No. Description Quantity Unit Unit Price Amount

Number

A1720 63309-0300 Delineator, type 3

Missouri River Contractors LLC $47.00 $705.00 Oftedal Construction, Inc $45.00 $675.00 FirstMark Construction, LLC $15.00 $225.00 Engineer's Estimate 15 Each $55.00 $825.00

A1740 63309-1000 Delineator, type snowpole

Missouri River Contractors LLC $66.00 $10,230.00 Oftedal Construction, Inc $72.00 $11,160.00 FirstMark Construction, LLC $155.00 $24,025.00 Engineer's Estimate 155 Each $25.00 $3,875.00

A1760 63404-0200 Pavement markings, type B

Missouri River Contractors LLC $20.00 $3,800.00 Oftedal Construction, Inc $22.00 $4,180.00 FirstMark Construction, LLC $40.00 $7,600.00 Engineer's Estimate 190 l $30.00 $5,700.00

A1780 63501-1000 Temporary traffic control, traffic and safety supervisor

Missouri River Contractors LLC Lump Sum $446,000.00 Oftedal Construction, Inc Lump Sum $455,000.00 FirstMark Construction, LLC Lump Sum $287,500.00 Engineer's Estimate ALL LPSM Lump Sum $175,000.00

A1800 63502-0700 Temporary traffic control, cone

Missouri River Contractors LLC $27.00 $2,700.00 Oftedal Construction, Inc $28.00 $2,800.00 FirstMark Construction, LLC $24.00 $2,400.00 Engineer's Estimate 100 Each $20.00 $2,000.00

A1820 63502-1300 Temporary traffic control, drum

Missouri River Contractors LLC $62.00 $6,200.00 Oftedal Construction, Inc $60.00 $6,000.00 FirstMark Construction, LLC $55.00 $5,500.00 Engineer's Estimate 100 Each $50.00 $5,000.00

21 out of 47Source Selection Information - See FAR 2.101 & 3.104

Project No: WY TIG US212(9)

Project Name: Beartooth Highway

Schedule: A

Schedule Type: Base

Line Item Pay Item No. Description Quantity Unit Unit Price Amount

Number

A1840 63502-1500 Temporary traffic control, warning light type A

Missouri River Contractors LLC $39.00 $780.00 Oftedal Construction, Inc $40.00 $800.00 FirstMark Construction, LLC $35.00 $700.00 Engineer's Estimate 20 Each $25.00 $500.00

A1860 63502-1700 Temporary traffic control, warning light type C

Missouri River Contractors LLC $39.00 $3,900.00 Oftedal Construction, Inc $40.00 $4,000.00 FirstMark Construction, LLC $35.00 $3,500.00 Engineer's Estimate 100 Each $35.00 $3,500.00

A1880 63502-2000 Temporary traffic control, portable changeable message sign

Missouri River Contractors LLC $12,500.00 $37,500.00 Oftedal Construction, Inc $14,000.00 $42,000.00 FirstMark Construction, LLC $12,500.00 $37,500.00 Engineer's Estimate 3 Each $10,000.00 $30,000.00

A1900 63502-2100 Temporary traffic control, crash cushion

Missouri River Contractors LLC $5,000.00 $20,000.00 Oftedal Construction, Inc $6,000.00 $24,000.00 FirstMark Construction, LLC $4,550.00 $18,200.00 Engineer's Estimate 4 Each $7,000.00 $28,000.00

A1920 63502-3100 Temporary traffic control, traffic signal system

Missouri River Contractors LLC $85,000.00 $170,000.00 Oftedal Construction, Inc $90,000.00 $180,000.00 FirstMark Construction, LLC $82,000.00 $164,000.00 Engineer's Estimate 2 Each $25,000.00 $50,000.00

A1940 63503-0300 Temporary traffic control, barricade type 3

Missouri River Contractors LLC $222.00 $9,768.00 Oftedal Construction, Inc $215.00 $9,460.00 FirstMark Construction, LLC $195.00 $8,580.00 Engineer's Estimate 44 m $200.00 $8,800.00

22 out of 47Source Selection Information - See FAR 2.101 & 3.104

Project No: WY TIG US212(9)

Project Name: Beartooth Highway

Schedule: A

Schedule Type: Base

Line Item Pay Item No. Description Quantity Unit Unit Price Amount

Number

A1960 63503-0400 Temporary traffic control, concrete barrier

Missouri River Contractors LLC $357.00 $357,000.00 Oftedal Construction, Inc $350.00 $350,000.00 FirstMark Construction, LLC $315.00 $315,000.00 Engineer's Estimate 1,000 m $200.00 $200,000.00

A1980 63503-1000 Temporary traffic control, plastic fence

Missouri River Contractors LLC $12.00 $20,220.00 Oftedal Construction, Inc $17.00 $28,645.00 FirstMark Construction, LLC $16.40 $27,634.00 Engineer's Estimate 1,685 m $13.00 $21,905.00

A2000 63504-1000 Temporary traffic control, construction sign

Missouri River Contractors LLC $330.00 $17,490.00 Oftedal Construction, Inc $370.00 $19,610.00 FirstMark Construction, LLC $330.00 $17,490.00 Engineer's Estimate 53.0 m2 $300.00 $15,900.00

A2020 63505-1000 Temporary traffic control, pavement markings

Missouri River Contractors LLC $1,078.00 $3,913.14 Oftedal Construction, Inc $3,300.00 $11,979.00 FirstMark Construction, LLC $1,500.00 $5,445.00 Engineer's Estimate 3.630 km $1,500.00 $5,445.00

A2040 63506-0500 Temporary traffic control, flagger

Missouri River Contractors LLC $45.00 $540,000.00 Oftedal Construction, Inc $54.00 $648,000.00 FirstMark Construction, LLC $49.50 $594,000.00 Engineer's Estimate 12,000 Hour $37.00 $444,000.00

A2060 63506-0600 Temporary traffic control, pilot car

Missouri River Contractors LLC $70.00 $252,000.00 Oftedal Construction, Inc $74.00 $266,400.00 FirstMark Construction, LLC $67.50 $243,000.00 Engineer's Estimate 3,600 Hour $85.00 $306,000.00

23 out of 47Source Selection Information - See FAR 2.101 & 3.104

Project No: WY TIG US212(9)

Project Name: Beartooth Highway

Schedule: A

Schedule Type: Base

Line Item Pay Item No. Description Quantity Unit Unit Price Amount

Number

A2080 64703-1000 Mitigation, landscaping log

Missouri River Contractors LLC $333.00 $333.00 Oftedal Construction, Inc $250.00 $250.00 FirstMark Construction, LLC $500.00 $500.00 Engineer's Estimate 1 Each $450.00 $450.00

Total Schedule - All Items

Missouri River Contractors LLC $22,934,353.74 Oftedal Construction, Inc $23,910,598.00 FirstMark Construction, LLC $26,813,000.00 Engineer's Estimate $11,819,475.00

24 out of 47Source Selection Information - See FAR 2.101 & 3.104

Project No: WY TIG US212(9)

Project Name: Beartooth Highway

Schedule: W

Schedule Type: Options

Solcitation No: 6982AF19B000008

Division: Central Federal Lands

State: WY County: Park

Federal Land: Shoshone National Forest Opened at: Lakewood, CO

Opened by: Leslie Karsten

Date: 05/09/19

I certify that this Bid Tabulation accurately reflects the offers received for this solicitation.

Signed: _______________________________

Title: _______________________________

Date: _______________________________

Contract Awarded to: ____________________ Award Date: ____________________

Contractor Comment Bid Amount Responsive

Missouri River Contractors LLC $3,883,416.00 3384 E US Hwy 12 Helena, MT 59601

FirstMark Construction, LLC $4,150,000.00 6611 Trade Center Ave Billings, MT 59101

Oftedal Construction, Inc $6,239,351.00 P.O. Box 400 Miles City, MT 59301

Engineer's Estimate $3,097,075.00

25 out of 47Source Selection Information - See FAR 2.101 & 3.104

Project No: WY TIG US212(9)

Project Name: Beartooth Highway

Schedule: W

Schedule Type: Options

Line Item Pay Item No. Description Quantity Unit Unit Price Amount

Number

W0020 15101-0000 Mobilization

Missouri River Contractors LLC Lump Sum $266,000.00 FirstMark Construction, LLC Lump Sum $415,000.00 Oftedal Construction, Inc Lump Sum $838,200.00 Engineer's Estimate ALL LPSM Lump Sum $309,970.00

W0040 15206-0000 Slope, reference, and clearing and grubbing stake

Missouri River Contractors LLC $20,000.00 $34,600.00 FirstMark Construction, LLC $10,000.00 $17,300.00 Oftedal Construction, Inc $13,000.00 $22,490.00 Engineer's Estimate 1.730 km $10,000.00 $17,300.00

W0060 15215-1000 Survey and staking, approach road

Missouri River Contractors LLC $5,000.00 $5,000.00 FirstMark Construction, LLC $6,000.00 $6,000.00 Oftedal Construction, Inc $6,700.00 $6,700.00 Engineer's Estimate 1 Each $2,000.00 $2,000.00

W0080 15215-3000 Survey and staking, drainage structure

Missouri River Contractors LLC $2,000.00 $22,000.00 FirstMark Construction, LLC $1,000.00 $11,000.00 Oftedal Construction, Inc $1,100.00 $12,100.00 Engineer's Estimate 11 Each $1,850.00 $20,350.00

W0100 15216-2000 Survey and staking, grade finishing stakes

Missouri River Contractors LLC $4,100.00 $14,186.00 FirstMark Construction, LLC $2,900.00 $10,034.00 Oftedal Construction, Inc $3,300.00 $11,418.00 Engineer's Estimate 3.460 km $7,500.00 $25,950.00

W0120 15301-0000 Contractor quality control

Missouri River Contractors LLC Lump Sum $180,000.00 FirstMark Construction, LLC Lump Sum $57,200.00 Oftedal Construction, Inc Lump Sum $250,000.00 Engineer's Estimate ALL LPSM Lump Sum $30,000.00

26 out of 47Source Selection Information - See FAR 2.101 & 3.104

Project No: WY TIG US212(9)

Project Name: Beartooth Highway

Schedule: W

Schedule Type: Options

Line Item Pay Item No. Description Quantity Unit Unit Price Amount

Number

W0140 15401-0000 Contractor testing

Missouri River Contractors LLC Lump Sum $75,000.00 FirstMark Construction, LLC Lump Sum $72,547.50 Oftedal Construction, Inc Lump Sum $185,000.00 Engineer's Estimate ALL LPSM Lump Sum $30,000.00

W0160 15501-0000 Construction schedule

Missouri River Contractors LLC Lump Sum $15,000.00 FirstMark Construction, LLC Lump Sum $25,000.00 Oftedal Construction, Inc Lump Sum $20,000.00 Engineer's Estimate ALL LPSM Lump Sum $10,000.00

W0180 15703-1500 Soil erosion control, temporary soil tackifier

Missouri River Contractors LLC $7,000.00 $24,500.00 FirstMark Construction, LLC $1,400.00 $4,900.00 Oftedal Construction, Inc $1,900.00 $6,650.00 Engineer's Estimate 3.500 ha $1,800.00 $6,300.00

W0200 15705-0100 Soil erosion control, silt fence

Missouri River Contractors LLC $15.00 $26,550.00 FirstMark Construction, LLC $9.00 $15,930.00 Oftedal Construction, Inc $20.00 $35,400.00 Engineer's Estimate 1,770 m $14.00 $24,780.00

W0220 15705-1400 Soil erosion control, sediment log

Missouri River Contractors LLC $65.00 $7,800.00 FirstMark Construction, LLC $26.00 $3,120.00 Oftedal Construction, Inc $20.00 $2,400.00 Engineer's Estimate 120 m $16.00 $1,920.00

W0240 15706-0200 Soil erosion control, check dam

Missouri River Contractors LLC $235.00 $14,100.00 FirstMark Construction, LLC $250.00 $15,000.00 Oftedal Construction, Inc $300.00 $18,000.00 Engineer's Estimate 60 Each $215.00 $12,900.00

27 out of 47Source Selection Information - See FAR 2.101 & 3.104

Project No: WY TIG US212(9)

Project Name: Beartooth Highway

Schedule: W

Schedule Type: Options

Line Item Pay Item No. Description Quantity Unit Unit Price Amount

Number

W0260 15706-0300 Soil erosion control, sandbag

Missouri River Contractors LLC $40.00 $1,800.00 FirstMark Construction, LLC $50.00 $2,250.00 Oftedal Construction, Inc $12.00 $540.00 Engineer's Estimate 45 Each $35.00 $1,575.00

W0280 15802-0000 Watering for dust control

Missouri River Contractors LLC Lump Sum $15,000.00 FirstMark Construction, LLC Lump Sum $75,000.00 Oftedal Construction, Inc Lump Sum $22,000.00 Engineer's Estimate ALL LPSM Lump Sum $15,000.00

W0300 20101-0000 Clearing and grubbing

Missouri River Contractors LLC $9,300.00 $37,944.00 FirstMark Construction, LLC $20,000.00 $81,600.00 Oftedal Construction, Inc $70,000.00 $285,600.00 Engineer's Estimate 4.080 ha $8,000.00 $32,640.00

W0320 20206-0000 Selective clearing and grubbing

Missouri River Contractors LLC $50.00 $1,500.00 FirstMark Construction, LLC $160.00 $4,800.00 Oftedal Construction, Inc $90.00 $2,700.00 Engineer's Estimate 30 m2 $40.00 $1,200.00

W0340 20301-1900 Removal of pipe culvert

Missouri River Contractors LLC $1,500.00 $16,500.00 FirstMark Construction, LLC $2,000.00 $22,000.00 Oftedal Construction, Inc $2,250.00 $24,750.00 Engineer's Estimate 11 Each $2,000.00 $22,000.00

W0360 20301-2400 Removal of signs

Missouri River Contractors LLC $200.00 $1,000.00 FirstMark Construction, LLC $250.00 $1,250.00 Oftedal Construction, Inc $29.00 $145.00 Engineer's Estimate 5 Each $200.00 $1,000.00

28 out of 47Source Selection Information - See FAR 2.101 & 3.104

Project No: WY TIG US212(9)

Project Name: Beartooth Highway

Schedule: W

Schedule Type: Options

Line Item Pay Item No. Description Quantity Unit Unit Price Amount

Number

W0380 20302-1200 Removal of guardrail

Missouri River Contractors LLC $26.00 $2,600.00 FirstMark Construction, LLC $27.00 $2,700.00 Oftedal Construction, Inc $6.00 $600.00 Engineer's Estimate 100 m $10.00 $1,000.00

W0400 20303-1600 Removal of pavement, asphalt

Missouri River Contractors LLC $6.00 $13,200.00 FirstMark Construction, LLC $7.00 $15,400.00 Oftedal Construction, Inc $7.00 $15,400.00 Engineer's Estimate 2,200 m2 $5.00 $11,000.00

W0420 20401-0000 Roadway excavation

Missouri River Contractors LLC $25.00 $500,000.00 FirstMark Construction, LLC $30.00 $600,000.00 Oftedal Construction, Inc $75.00 $1,500,000.00 Engineer's Estimate 20,000 m3 $13.00 $260,000.00

W0440 20402-0000 Subexcavation

Missouri River Contractors LLC $150.00 $375,000.00 FirstMark Construction, LLC $141.00 $352,500.00 Oftedal Construction, Inc $90.00 $225,000.00 Engineer's Estimate 2,500 m3 $60.00 $150,000.00

W0460 20403-0000 Unclassified borrow

Missouri River Contractors LLC $15.00 $112,500.00 FirstMark Construction, LLC $14.00 $105,000.00 Oftedal Construction, Inc $13.00 $97,500.00 Engineer's Estimate 7,500 m3 $35.00 $262,500.00

W0480 20701-0700 Earthwork geotextile, type II-A

Missouri River Contractors LLC $4.50 $15,300.00 FirstMark Construction, LLC $4.00 $13,600.00 Oftedal Construction, Inc $5.00 $17,000.00 Engineer's Estimate 3,400 m2 $3.50 $11,900.00

29 out of 47Source Selection Information - See FAR 2.101 & 3.104

Project No: WY TIG US212(9)

Project Name: Beartooth Highway

Schedule: W

Schedule Type: Options

Line Item Pay Item No. Description Quantity Unit Unit Price Amount

Number

W0500 25101-2000 Placed riprap, class 2

Missouri River Contractors LLC $112.00 $2,800.00 FirstMark Construction, LLC $120.00 $3,000.00 Oftedal Construction, Inc $90.00 $2,250.00 Engineer's Estimate 25 m3 $160.00 $4,000.00

W0520 25101-3000 Placed riprap, class 3

Missouri River Contractors LLC $112.00 $3,360.00 FirstMark Construction, LLC $125.00 $3,750.00 Oftedal Construction, Inc $90.00 $2,700.00 Engineer's Estimate 30 m3 $175.00 $5,250.00

W0540 25101-4000 Placed riprap, class 4

Missouri River Contractors LLC $112.00 $11,200.00 FirstMark Construction, LLC $130.00 $13,000.00 Oftedal Construction, Inc $90.00 $9,000.00 Engineer's Estimate 100 m3 $180.00 $18,000.00

W0560 25120-2000 Riprap ditch, class 2

Missouri River Contractors LLC $300.00 $27,000.00 FirstMark Construction, LLC $70.00 $6,300.00 Oftedal Construction, Inc $90.00 $8,100.00 Engineer's Estimate 90 m $250.00 $22,500.00

W0580 25125-0000 Boulder

Missouri River Contractors LLC $225.00 $15,300.00 FirstMark Construction, LLC $460.00 $31,280.00 Oftedal Construction, Inc $250.00 $17,000.00 Engineer's Estimate 68 Each $280.00 $19,040.00

W0620 30101-0000 Aggregate base

Missouri River Contractors LLC $30.00 $465,000.00 FirstMark Construction, LLC $32.00 $496,000.00 Oftedal Construction, Inc $50.00 $775,000.00 Engineer's Estimate 15,500 t $27.00 $418,500.00

30 out of 47Source Selection Information - See FAR 2.101 & 3.104

Project No: WY TIG US212(9)

Project Name: Beartooth Highway

Schedule: W

Schedule Type: Options

Line Item Pay Item No. Description Quantity Unit Unit Price Amount

Number

W0640 40301-0000 Hot asphalt concrete pavement

Missouri River Contractors LLC $150.00 $495,000.00 FirstMark Construction, LLC $170.00 $561,000.00 Oftedal Construction, Inc $187.00 $617,100.00 Engineer's Estimate 3,300 t $135.00 $445,500.00

W0660 40920-1000 Fog seal, emulsified asphalt grade CSS-1 or CSS-1h, SS-1 or SS-1h

Missouri River Contractors LLC $1,200.00 $10,800.00 FirstMark Construction, LLC $1,000.00 $9,000.00 Oftedal Construction, Inc $1,100.00 $9,900.00 Engineer's Estimate 9.0 t $850.00 $7,650.00

W0680 41103-0000 Prime coat (Method 1)

Missouri River Contractors LLC $1.25 $23,750.00 FirstMark Construction, LLC $1.00 $19,000.00 Oftedal Construction, Inc $1.11 $21,090.00 Engineer's Estimate 19,000 m2 $1.80 $34,200.00

W0700 41105-0000 Blotter

Missouri River Contractors LLC $15.00 $2,250.00 FirstMark Construction, LLC $65.00 $9,750.00 Oftedal Construction, Inc $45.00 $6,750.00 Engineer's Estimate 150 t $55.00 $8,250.00

W0720 41201-1000 Tack coat grade CSS-1, CSS-1h, SS-1, or SS-1h

Missouri River Contractors LLC $1,500.00 $13,500.00 FirstMark Construction, LLC $1,000.00 $9,000.00 Oftedal Construction, Inc $1,100.00 $9,900.00 Engineer's Estimate 9.0 t $760.00 $6,840.00

W0740 56305-0000 Rock stain

Missouri River Contractors LLC $13.00 $39,000.00 FirstMark Construction, LLC $11.00 $33,000.00 Oftedal Construction, Inc $28.00 $84,000.00 Engineer's Estimate 3,000 m2 $32.00 $96,000.00

31 out of 47Source Selection Information - See FAR 2.101 & 3.104

Project No: WY TIG US212(9)

Project Name: Beartooth Highway

Schedule: W

Schedule Type: Options

Line Item Pay Item No. Description Quantity Unit Unit Price Amount

Number

W0760 60103-0200 Concrete, headwall for 1050mm pipe culvert (equivalent diameter)

Missouri River Contractors LLC $70,000.00 $210,000.00 FirstMark Construction, LLC $3,700.00 $11,100.00 Oftedal Construction, Inc $82,800.00 $248,400.00 Engineer's Estimate 3 Each $5,500.00 $16,500.00

W0780 60201-0800 600mm pipe culvert

Missouri River Contractors LLC $250.00 $46,250.00 FirstMark Construction, LLC $700.00 $129,500.00 Oftedal Construction, Inc $270.00 $49,950.00 Engineer's Estimate 185 m $300.00 $55,500.00

W0800 60201-1000 900mm pipe culvert

Missouri River Contractors LLC $325.00 $8,125.00 FirstMark Construction, LLC $725.00 $18,125.00 Oftedal Construction, Inc $350.00 $8,750.00 Engineer's Estimate 25 m $400.00 $10,000.00

W0820 60201-1100 1050mm pipe culvert

Missouri River Contractors LLC $350.00 $33,250.00 FirstMark Construction, LLC $750.00 $71,250.00 Oftedal Construction, Inc $445.00 $42,275.00 Engineer's Estimate 95 m $550.00 $52,250.00

W0840 60202-0600 900mm equivalent diameter arch or elliptical pipe culvert (1070 mm x 740 mm)

Missouri River Contractors LLC $450.00 $11,250.00 FirstMark Construction, LLC $725.00 $18,125.00 Oftedal Construction, Inc $360.00 $9,000.00 Engineer's Estimate 25 m $450.00 $11,250.00

W0860 60202-0700 1050mm equivalent diameter arch or elliptical pipe culvert (1240 mm x 840 mm)

Missouri River Contractors LLC $514.00 $12,850.00 FirstMark Construction, LLC $750.00 $18,750.00 Oftedal Construction, Inc $480.00 $12,000.00 Engineer's Estimate 25 m $550.00 $13,750.00

32 out of 47Source Selection Information - See FAR 2.101 & 3.104

Project No: WY TIG US212(9)

Project Name: Beartooth Highway

Schedule: W

Schedule Type: Options

Line Item Pay Item No. Description Quantity Unit Unit Price Amount

Number

W0880 60210-0800 End section for 600mm pipe culvert

Missouri River Contractors LLC $800.00 $8,000.00 FirstMark Construction, LLC $370.00 $3,700.00 Oftedal Construction, Inc $260.00 $2,600.00 Engineer's Estimate 10 Each $450.00 $4,500.00

W0900 60210-1000 End section for 900mm pipe culvert

Missouri River Contractors LLC $925.00 $1,850.00 FirstMark Construction, LLC $550.00 $1,100.00 Oftedal Construction, Inc $640.00 $1,280.00 Engineer's Estimate 2 Each $750.00 $1,500.00

W0920 60210-1100 End section for 1050mm pipe culvert

Missouri River Contractors LLC $1,300.00 $1,300.00 FirstMark Construction, LLC $800.00 $800.00 Oftedal Construction, Inc $1,820.00 $1,820.00 Engineer's Estimate 1 Each $1,150.00 $1,150.00

W0940 60211-1000 End section for 900mm equivalent diameter arch or elliptical pipe culvert (1070 mm x 740 mm)

Missouri River Contractors LLC $925.00 $1,850.00 FirstMark Construction, LLC $550.00 $1,100.00 Oftedal Construction, Inc $640.00 $1,280.00 Engineer's Estimate 2 Each $700.00 $1,400.00

W0960 60211-1100 End section for 1050mm equivalent diameter arch or elliptical pipe culvert (1240 mm x 840 mm)

Missouri River Contractors LLC $1,200.00 $2,400.00 FirstMark Construction, LLC $775.00 $1,550.00 Oftedal Construction, Inc $1,820.00 $3,640.00 Engineer's Estimate 2 Each $1,500.00 $3,000.00

W0980 60212-0800 Elbow, 600mm

Missouri River Contractors LLC $1,600.00 $3,200.00 FirstMark Construction, LLC $300.00 $600.00 Oftedal Construction, Inc $1,250.00 $2,500.00 Engineer's Estimate 2 Each $700.00 $1,400.00

33 out of 47Source Selection Information - See FAR 2.101 & 3.104

Project No: WY TIG US212(9)

Project Name: Beartooth Highway

Schedule: W

Schedule Type: Options

Line Item Pay Item No. Description Quantity Unit Unit Price Amount

Number

W1000 60212-1000 Elbow, 900mm (Equivalent Diameter Arch or Elliptical Pipe Culvert) (1070 mm x 740 mm)

Missouri River Contractors LLC $1,600.00 $1,600.00 FirstMark Construction, LLC $450.00 $450.00 Oftedal Construction, Inc $1,600.00 $1,600.00 Engineer's Estimate 1 Each $700.00 $700.00

W1020 60212-1100 Elbow, 1050mm

Missouri River Contractors LLC $1,400.00 $2,800.00 FirstMark Construction, LLC $400.00 $800.00 Oftedal Construction, Inc $1,375.00 $2,750.00 Engineer's Estimate 2 Each $1,300.00 $2,600.00

W1040 60212-1100 Elbow, 1050mm (Equivalent Diameter Arch or Elliptical Pipe Culvert) (1240 mm x 840 mm)

Missouri River Contractors LLC $1,850.00 $1,850.00 FirstMark Construction, LLC $500.00 $500.00 Oftedal Construction, Inc $2,000.00 $2,000.00 Engineer's Estimate 1 Each $1,300.00 $1,300.00

W1060 60404-1000 Catch basin, type 1

Missouri River Contractors LLC $9,300.00 $18,600.00 FirstMark Construction, LLC $8,000.00 $16,000.00 Oftedal Construction, Inc $10,500.00 $21,000.00 Engineer's Estimate 2 Each $6,000.00 $12,000.00

W1080 60501-0000 Standard underdrain system

Missouri River Contractors LLC $83.00 $47,725.00 FirstMark Construction, LLC $220.00 $126,500.00 Oftedal Construction, Inc $180.00 $103,500.00 Engineer's Estimate 575 m $135.00 $77,625.00

W1100 60901-0400 Curb, concrete, 150mm depth

Missouri River Contractors LLC $400.00 $260,000.00 FirstMark Construction, LLC $335.00 $217,750.00 Oftedal Construction, Inc $400.00 $260,000.00 Engineer's Estimate 650 m $200.00 $130,000.00

34 out of 47Source Selection Information - See FAR 2.101 & 3.104

Project No: WY TIG US212(9)

Project Name: Beartooth Highway

Schedule: W

Schedule Type: Options

Line Item Pay Item No. Description Quantity Unit Unit Price Amount

Number

W1120 60908-1000 Paved ditch, asphalt

Missouri River Contractors LLC $46.00 $41,400.00 FirstMark Construction, LLC $40.00 $36,000.00 Oftedal Construction, Inc $66.00 $59,400.00 Engineer's Estimate 900 m2 $65.00 $58,500.00

W1140 61701-1800 Guardrail system G4, type 4, class A steel posts

Missouri River Contractors LLC $119.00 $17,850.00 FirstMark Construction, LLC $105.00 $15,750.00 Oftedal Construction, Inc $120.00 $18,000.00 Engineer's Estimate 150 m $245.00 $36,750.00

W1160 61702-0600 Terminal section, type flared (G4 W-Beam)

Missouri River Contractors LLC $3,900.00 $7,800.00 FirstMark Construction, LLC $3,500.00 $7,000.00 Oftedal Construction, Inc $6,400.00 $12,800.00 Engineer's Estimate 2 Each $2,500.00 $5,000.00

W1180 62201-0150 Dump truck, 7 cubic meter minimum capacity

Missouri River Contractors LLC $148.00 $5,920.00 FirstMark Construction, LLC $185.00 $7,400.00 Oftedal Construction, Inc $150.00 $6,000.00 Engineer's Estimate 40 Hour $140.00 $5,600.00

W1200 62201-0350 Backhoe

Missouri River Contractors LLC $159.00 $3,180.00 FirstMark Construction, LLC $230.00 $4,600.00 Oftedal Construction, Inc $130.00 $2,600.00 Engineer's Estimate 20 Hour $130.00 $2,600.00

W1220 62201-0900 Wheel loader, 2 cubic meter minimum rated capacity

Missouri River…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .