About this file

This document provides details for a federal contract opportunity to reconstruct sections of the Beartooth Highway in Wyoming. The project involves realigning and rebuilding 2.61 kilometers of U.S. Route 212, including construction of a new 600 foot steel bridge. Key work items include 44,000 cubic meters of roadway excavation, 2,400 square meters of mechanically stabilized earth wall, 25,000 metric tons of aggregate base, 5,000 metric tons of hot asphalt paving, and various other construction activities. The project is located at an elevation of 10,950 feet in the Shoshone National Forest and has an anticipated construction period of four to six months per year between June 2019 and October 2020. The estimated total cost ranges between $14-17 million. The solicitation will be advertised on March 28, 2019 through the Department of Transportation Federal Highway Administration.

Reference 9

View the file

Other files for this federal contract opportunity

Other files attached to WY TIGER US212(9) Beartooth Roadway, newest first.
File Type Posted
Bid_Tabulation_WY_TIG_US212(9).pdf PDF
QnA_05.06.19.pdf PDF
QnA_05.01.19.pdf PDF
A002.pdf PDF
QnA_4.29.19_-_Final_QnA.pdf PDF
QnA_4.26.19.pdf PDF
A001_WY_TIG_US212(9)_Beartooth_Highway.pdf PDF
(A01)_wy09title.pdf PDF
QnA_4.25.19.pdf PDF
QnA_4.24.19.pdf PDF
1_WY.PFH.4.Beartooth_Highway.Materials.1998b.PDF PDF
27_Pile_Selection-Beartooth_Lake_Outlet_Bridge.pdf PDF
15_WY.PFH.4.Beartooth_Highway.URS_Geotech.2002b.PDF PDF
4_WY.PFH.4.Beartooth_Highway.URS_Geotech.1999c.PDF PDF
5_WY.PFH.4.Beartooth_Highway.NSA_Geophysics.2000.PDF PDF
7_WY.PFH.4.Beartooth_Highway.URS_Geotech.2001a.PDF PDF
24_WY.PFH.4.Beartooth_Highway.KF_Geotech.2003.PDF PDF
32_WY.PFH.4-1(4).Beartooth_Highway.Tech_Memo.Material_Source.2004.pdf PDF
19_ERO.pdf PDF
25_WY.PFH.4.Beartooth_Highway.PBSJ_Bridge_Treatments.2004a.PDF PDF
13_Instrument_Monitoring.pdf PDF
22_WY.PFH.4-1(4).Beartooth_Highway.URS.Geotech-Four_Bridges.2003.pdf PDF
6_WY.PFH.4.Beartooth_Highway.Wall_Aesthetics.2001b.PDF PDF
28_WY.PFH.4-1(4).Beartooth_Highway.Tech_Memo.Slope_Stability.2004.pdf PDF
10_WY.PFH.4.Beartooth_Highway.URS_Geotech_Stations.2001e.pdf PDF
26_WY.PFH.4.Beartooth_Highway.PBSJ_Wall.2004.PDF PDF
31_WY.PFH.4-1(4).Beartooth_Highway.Tech_Memo.Micropile_Types.2004.pdf PDF
18_Beartooth_Ravine_Retaining_Wall_Recommendation.pdf PDF
20_WY.PFH.4-1(4).Beartooth_Highway.URS.Ravine_Bridge.2003.pdf PDF
16_WY.PFH.4.Bearthooth_Highway.URS_Geotech.2002c.PDF PDF
2_WY.PFH.4.Beartooth_Highway.WWC_Geohazard.1998a.PDF PDF
11_WY.PFH.4.Beartooth_Highway.Tech_Memo_to_ERO_Piezometer_Wells.2001f.pdf PDF
17_WY.PFH.4.Beartooth_Highway.URS_Geotech.2002c.PDF PDF
30_WY.PFH.4-1(4).Beartooth_Highway.Tech_Memo.Reference_Compilation.2004.pdf PDF
14_WY.PFH.4.Beartooth_Highway.URS_Wall_Feasibility.2002a.PDF PDF
21_WY.PFH.4-1(4).Beartooth_Highway.URS.Ravine_Bridge_Addendum.2003.pdf PDF
QnA_4.22.19_3_WY.PFH.4.Beartooth_Highway.Materials.1999b.pdf PDF
QnA_4.22.19_4_WY.PFH.4.Beartooth_Highway.URS_Geotech.1999c.PDF PDF
QnA_4.19.19.pdf PDF
QnA_4.12.19_clarification_4_12_19.pdf PDF
QnA_4.12.19.pdf PDF
QnA_4.10.19.pdf PDF
Final_Beartooth_Geotechnical_Memo.pdf PDF
Appendix_G_-_Revised_Final_Fish_Passage_Memo.pdf PDF
Appendix_E_-_roadclassificationrev.pdf PDF
Fen_Mitigation_Analysis_Memo.pdf PDF
Appendix_F_-_Final_Fish_Passage_Recommendation_January_2005.pdf PDF
6982AF19B000008.pdf PDF
WY09_Cross_Sections_02-20-2019_100_25_Add_Set.pdf PDF
WY09_Plan_Set_02-20-2019_100_25_Add_Set.pdf PDF
Show all 50

WY TIGER US212(9) Beartooth Roadway has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

File details come from the government source that posted it. Updated .