Fen_Mitigation_Analysis_Memo.pdf
PDF 8 MB Posted
- Attached to
- WY TIGER US212(9) Beartooth Roadway Federal contract opportunity
- Solicitation number
- 6982AF19B000008
About this file
This memorandum provides details on a federal contract opportunity for roadway reconstruction and bridge construction work on the Beartooth Highway in Wyoming. The project involves realigning and reconstructing 2.61 km of roadway and building a new 600 foot steel bridge at an elevation of 10,950 feet, with construction anticipated to take place between June 2019 and October 2020. Key work items include 44,000 cubic meters of roadway excavation, 800 cubic meters of structural backfill, 2,400 square meters of mechanically stabilized earth wall, 25,000 metric tons of aggregate base, 5,000 metric tons of hot asphalt paving, and other elements. The estimated total cost range for the project is $14-17 million. The solicitation is being conducted by the Department of Transportation Federal Highway Administration.
Fen Mitigation Analysis Memo
View the file
Other files for this federal contract opportunity
Show all 50
WY TIGER US212(9) Beartooth Roadway has more files on GovTribe.
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
File details come from the government source that posted it. Updated .