25_WY.PFH.4.Beartooth_Highway.PBSJ_Bridge_Treatments.2004a.PDF
PDF 89 MB Posted
- Attached to
- WY TIGER US212(9) Beartooth Roadway Federal contract opportunity
- Solicitation number
- 6982AF19B000008
About this file
This solicitation is for a roadway realignment and bridge construction project located on U.S. Route 212 in Wyoming, also known as the Beartooth Highway. Work includes 44,000 cubic meters of roadway excavation, 2,400 square meters of mechanically stabilized earth wall, 25,000 metric tons of aggregate base, 5,000 metric tons of hot asphalt paving, and construction of a 600 foot steel bridge. The project also involves pulverizing 10,000 square meters of existing roadway, placing 2,000 cubic meters of structural concrete, and erecting 291,700 kilograms of structural steel. Additional work comprises 475 meters of pipe culvert placement, 6 hectares of hydraulic seeding, and 580 liters of pavement markings. The solicitation is being issued by the Department of Transportation Federal Highway Administration with an anticipated advertisement date of March 28, 2019. Construction is scheduled to begin in June 2019 and be completed by October 2020, with an estimated total cost of $14-17 million.
Reference 25
View the file
Other files for this federal contract opportunity
Show all 50
WY TIGER US212(9) Beartooth Roadway has more files on GovTribe.
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
File details come from the government source that posted it. Updated .