WY FLAP NAT 505 & BL 6409(1) Casper Mtn Cir Dr & Muddy Mtn Rd
Pre-Solicitation Posted
This opportunity was awarded. See the award notice from , or the latest solicitation from .
- Solicitation number
- 6982AF23B000021
- Agency
-
Federal Highway Administration
Department of Transportation
- Responses due
- Not on record
- Set-aside
- No set-aside
Opportunity facts
- NAICS code
- 237310 Highway, Street, and Bridge Construction
- Place of performance
- Casper, Wyoming, United States
Notice details come from SAM.gov. Updated .
About this opportunity
The Federal Contract Opportunity involves the minor widening, reconstruction, and resurfacing of roads in Natrona County, Wyoming, specifically Casper Mountain Circle Drive and Muddy Mountain Road. The project includes improvements to the roads, construction of parking areas, replacement of a snow fence, and other related tasks. The work is divided into a base schedule and two options, each with specific tasks and requirements.
List of Products and Services:
- Widening and reconstruction of roads
- Resurfacing of roads
- Construction of parking areas
- Replacement of a snow fence
- Coordination with the County and BLM during construction activities
- Rehabilitation and resurfacing of two-lane road and single lane aggregate surfaced roads
- Curve widening of an S-curve area
- Reconditioning ditches
- Adding culverts
- Pavement markings and delineators
- Sub excavation
- Full Depth Reclamation (FDR)
- Aggregate surface course
- Roadway aggregate
- Asphalt concrete pavement.
Notice text
THIS IS NOT A REQUEST FOR BID – PLANS AND SPECIFICATIONS ARE NOT AVAILABLE.
PROJECT NUMBER: WY FLAP NAT 505 & BL 6409(1)
PROJECT NAME: Casper Mtn Cir Dr & Muddy Mtn Rd
PROJECT DESCRIPTION:
Minor widening/reconstruction and resurfacing, restoration, and rehabilitation (3R) project in Natrona County, Wyoming (approximately 8 miles south of Casper, Wyoming). The proposed project is 12 miles long, generally extending from the intersection of Casper Mountain Circle Drive and Hogadon Road to South Circle Drive, and then continues along Muddy Mountain Road and ends at the Bureau of Land Management (BLM) Campground Loop. The route is used primarily as residential and recreational access to Muddy Mountain and is on rolling terrain with survey elevations ranging from 7,425 feet to 8,292 feet.
Proposed improvements include one base schedule and 2 options:
- Schedule A: BLM Muddy Mountain Road improvements
- Option X: County Casper Mountain Circle Drive improvements (S-Curve and new pavement portion)
- Option Y: County Casper Mountain Circle Drive improvements (Full Depth Reclamation [FDR])
SCOPE OF THE WORK:
Both the Schedule and Options require coordination with the County and BLM during construction activities. Casper Mountain Circle Drive provides access to many private residences and Muddy Mountain Road provides access to campgrounds.
Schedule A:
Muddy Mountain Road is approximately 7.49 miles in length and is aggregate surfaced. The project improvements will rehabilitate and resurface the 4.55 miles of two-lane road and 2.83 miles of single lane aggregate surfaced roads. There are two segments of Muddy Mountain Road consisting of steep grades where new pavement is proposed. There will be four new parking areas, with two of the areas modifying existing parking areas. Additionally, there is a snow fence that will be replaced.
Option X:
The Casper Mountain Circle Drive segment is 2.33 miles are aggregate surfaced with proposed new pavement. The new typical section will consist of 11-foot lanes and 1-foot shoulders. Additional improvements include curve widening of an S-curve area, reconditioning ditches, adding culverts, and pavement markings and delineators.
Option Y:
Casper Mountain Circle Drive is approximately 2.65 miles of existing pavement is fatigued and nearing the end of its serviceable life with proposed FDR. Additional improvements include sub excavation, reconditioning ditches, adding culverts, and pavement markings and delineators.
PRINCIPAL WORK ITEMS:
Schedule A:
30110-0000 AGGREGATE SURFACE COURSE 27,800 tons
30202-2000 ROADWAY AGGREGATE, METHOD 2 4,300 tons
40101-5600 ASPHALT CONCRETE PAVEMENT, GYRATORY MIX, 1/2-INCH OR 3/4-INCH NOMINAL MAXIMUM SIZE AGGREGATE, 0.3 TO <3 MILLION ESAL 2,100 tons
60704-0000 CLEANING CULVERT IN PLACE 72 each
61901-0000 FENCE (SNOW FENCE) 900 linear feet
61904-0000 BOLLARD POST 297 each
Option X:
20402-0000 SUBEXCAVATION 200 cubic yards
30110-0000 AGGREGATE SURFACE COURSE 13,000tons
40101-5600 ASPHALT CONCRETE PAVEMENT, GYRATORY MIX, 1/2-INCH OR 3/4-INCH NOMINAL MAXIMUM SIZE AGGREGATE, 0.3 TO <3 MILLION ESAL 6,700 tons
60802-0400 PAVED WATERWAY, TYPE 4 1,300 linear feet
Option Y:
20402-0000 SUBEXCAVATION 1,100 cubic yards
30202-2000 ROADWAY AGGREGATE, METHOD 2 2,700 tons
30401-5500 FULL DEPTH RECLAMATION, METHOD 2, 8-INCH DEPTH 2.400 mile
40101-5600 ASPHALT CONCRETE PAVEMENT, GYRATORY MIX, 1/2-INCH OR 3/4-INCH NOMINAL MAXIMUM SIZE AGGREGATE, 0.3 TO <3 MILLION ESAL 6,100 tons
It is anticipated this project will be advertised in September 2023, and awarded in November 2023. Construction will run from May 2024 thru September 2024. Due to weather restrictions, the site is not accessible from November to May.
The estimated price range of the project work is between $10 million and $20 million.
Notice history
| Notice | Type | Posted |
|---|---|---|
| WY FLAP NAT 505 & BL 6409(1) Casper Mtn Cir Dr & Muddy Mtn Rd | Award Notice | |
| WY FLAP NAT 505 & BL 6409(1) Casper Mtn Cir Dr & Muddy Mtn Rd | Solicitation | |
| This notice | Pre-Solicitation | |
| WY FLAP NAT 505 & BL 6409(1) Casper Mtn Cir Dr & Muddy Mtn Rd | Pre-Solicitation |
Similar open opportunities
| Opportunity | Agency | Set-aside | Responses due |
|---|---|---|---|
| CO OMAD 300(71) Minuteman Missile Access | Federal Highway Administration | Total Small Business | |
| Access Road Repair National Elk Refuge | — | Total Small Business |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Find teaming partners
- Similar opportunities
- Ask GovTribe AI about this opportunity