Wilson Lock Bascule Bridge Replacement, Tennessee River, Florence, Alabama

Award Notice Posted

Solicitation number
W912P5-09-B-0012
Agency
Awarded
to Wright Brothers Construction Co, Inc.
Set-aside
No set-aside

Opportunity facts

Contract number
W912P509C0007 Federal contract award
PSC
Not on record
Place of performance
USA Engineer District, Nashville P.O. Box 1070, 801 Broad Street Nashville TN 37202 US

Notice details come from SAM.gov. Updated .

Notice text

3 versions

Update #3 · Latest ·

The purpose of this modification to the previous notice is directed at the potential contractors who may have submitted questions via e-mail during the question period, which ended on 30 March 2009. If your question is NOT listed on the 'Responses to Questions from Potential Contractors' list that was posted to the Federal Business Opportunities website (www.fbo.gov) on 7 April 2009, please forward a copy of that e-mail to Contract Specialist Kristal Jones at Kristal.R.Jones@usace.army.mil by 2:00 p.m. Friday, April 10, 2009 Please include in the subject line of your e-mail 'W912P5-09-B-0012 Question (resubmit)'

Update #2 ·

GENERAL STATEMENT OF WORK

Contractor shall completely prepare site for Bascule Bridge Replacement at Wilson Auxiliary Lock Tennessee River, Florence, Alabama. Construction services are required for the fabrication and installation of a new two-lane vehicular bridge across the auxiliary lock chamber at Wilson Lock in Florence, Alabama. The new bridge will be a 3-span(70 - 155 112) structure with composite steel plate-girders, concrete deck, and concrete support piers and abutments. Some site grading, paving, and utility work will also be required to tie the bridge into existing roadway and parking areas. Construction will be within the property limits of the Tennessee Valley Authoritys Wilson Lock and Dam Project. Construction administration will be by the Nashville District US Army Corps of Engineers. The drawings and specifications may be downloaded from the FBO web site. A site visit will be conducted in the next 2-4 weeks.  This is a full and open solicitation with Hub Zone preference.

Update #1 ·

GENERAL STATEMENT OF WORK

Contractor shall completely prepare site for Bascule Bridge Replacement at Wilson Auxiliary Lock Tennessee River, Florence, Alabama. Construction services are required for the fabrication and installation of a new two-lane vehicular bridge across the auxiliary lock chamber at Wilson Lock in Florence, Alabama. The new bridge will be a 3-span(70 - 155 112) structure with composite steel plate-girders, concrete deck, and concrete support piers and abutments. Some site grading, paving, and utility work will also be required to tie the bridge into existing roadway and parking areas. Construction will be within the property limits of the Tennessee Valley Authoritys Wilson Lock and Dam Project. Construction administration will be by the Nashville District US Army Corps of Engineers. The drawings and specifications may be downloaded from the FBO web site. A site visit will be conducted in the next 2-4 weeks.

Files

File Type Posted
signsheet032409 —

Notice history

Notice Type Posted
Bascule Bridge Replacement Construction-Access Road Bridge Across Auxillary Lock Latest Award Notice
This notice Original Award Notice

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity

GovTribe for Federal Contractors