About this opportunity

This pre-solicitation notice is for an integrated design-build contract to modify Whittier Narrows Dam in Los Angeles County, California. The U.S. Army Corps of Engineers District Tulsa will solicit proposals to address internal erosion in the dam foundation through measures along the downstream toe, and to address overtopping failure through embankment raises, parapet walls, and hardened crest and downstream slope. Proposals are due on or around April 19, 2024 under solicitation number W912BV23R0039 to be issued on or around January 19, 2024. The contract will be awarded using a best value tradeoff process.

The project is not designated for any set aside and will be competed on an unrestricted basis. It falls under NAICS code 237990 (Other Heavy and Civil Engineering Construction) with a small business size standard of $45 million. The estimated value is between $250-500 million, with a 365 day preconstruction phase and up to 2,069 calendar days allotted for construction activities.

Notice text

2 versions

Update #2 · Latest ·

This is a PRE-SOLICITATION notice for the Integrated Design and Construction (IDaC) project for Whittier Narrows Dam Safety Modification Project, Los Angeles County, California. THIS IS NOT A SOLICITATION FOR PROPOSALS AND NO CONTRACT WILL BE AWARDED FROM THIS SYNOPSIS. 

The U.S. Army Corps of Engineers – Tulsa has been tasked to solicit and award a construction contract for the Whittier Narrows Dam Safety Modification Project.  The proposed project will be a competitive, firm-fixed price, IDaC, contract procured in accordance with FAR 15, Negotiated Procurement using the Best Value trade-off process.

Whittier Narrows Dam is owned by the Federal government and operated and maintained by the USACE Los Angeles District (SPL) and is 11 miles east of downtown Los Angeles. The areas both upstream and downstream are highly urbanized with approximately 10 cities located between Santa Fe Dam and Whittier Narrows Dam, and 25 cities between Whittier Narrows Dam and the Pacific Ocean. Approximately one million people live in the downstream flood plain. The dam itself is a three-mile-long earthen embankment with a maximum height of 56 feet. The dam can impound waters from the intermittent San Gabriel and Rio Hondo Rivers with Tainter-gated outlet structures at each. Utility galleries, multiple municipal and private utilities, facilities as well as county and local roads traverse the dam. This construction contract will address internal erosion in the foundation and overtopping during extreme floods. The plan addresses internal erosion by construction of various measures along the downstream toe. The plan also addresses failure through overtopping by hardening the crest and downstream slope to prevent erosion leading to breach, raising two roads and adjoining embankments, and constructing concrete parapet walls. Multiple utilities and other non-federal facilities will be impacted, closed or relocated as a result of the modification work.

The overall purpose of the Whittier Narrows DSMP is to implement modifications at Whittier Narrows Dam to reduce life safety risks in an expeditious and efficient manner. Whittier Narrows Dam is designated as Dam Safety Action Classification (DSAC) 1, meaning it has an extremely high incremental risk where the combination of life or economic consequences with likelihood of failure is extremely high, and immediate action is required to avoid failure. The risks associated with dam failure will be reduced through construction of a new reinforced concrete labyrinth control structure, construction of composite embankment connections including embedded roller compacted concrete (RCC) monoliths, new reinforced concrete chute slabs anchored to foundation rock, new underdrain system for the chute, and new reinforced concrete cantilever spillway chute walls.

In accordance with DFARS 236.204, the estimated magnitude of construction for this project is between $250,000,000.00 and $500,000,000.00

Estimated duration of the construction phase of this project is 365 days for the preconstruction services with an option to execute the construction for a total of 2,069 calendar days.

The North American Industry Classification System code for this procurement is 237990 which has a small business size standard of $45.0M. 

Small Businesses are reminded under FAR 52.219-14, (Deviation 2019-O0003), Limitations on Subcontracting.  Firm will not pay more than 85% of the amount paid by the Government for contract performance, excluding the cost of materials, to subcontractors that are not similarly situated entities. Any work that a similarly situated entity further subcontracts will count toward the 85% subcontract amount that cannot be exceeded.  Large Businesses must comply with the FAR 52.219-9 by submitting a Small Business Subcontracting Plan should this action be solicited as Full and Open Competition and an award is made to a large business firm.

TYPE OF SET-ASIDE: NONE – This requirement will be solicited as UNRESTRICTED.

Anticipated solicitation issuance date is on or about 01 February 2024, and the estimated proposal due date will be on or about 07 May 2024.  The official solicitation number W912BV23R0039 will be issued under SAM.gov via PIEE.eb.mil

Update #1 ·

This is a PRE-SOLICITATION notice for the Integrated Design and Construction (IDaC) project for the Whittier Narrows Dam Safety Modification Project, Los Angeles County, California. THIS IS NOT A SOLICITATION FOR PROPOSALS AND NO CONTRACT WILL BE AWARDED FROM THIS SYNOPSIS. 

The U.S. Army Corps of Engineers – Tulsa has been tasked to solicit and award a construction contract for the Prado Dam Spillway Modification Project.  The proposed project will be a competitive, firm-fixed price, IDaC, contract procured in accordance with FAR 15, Negotiated Procurement using the Best Value trade-off process.

Prado Dam is owned by the Federal government and operated and maintained by the USACE Los Angeles District (SPL). Prado Dam is located in Riverside County, California, approximately 2 miles west of the City of Corona, northeast of the California State Route (SR) 91 (Riverside Freeway) and Corona Freeway (SR 71) interchange.  Portions of the reservoir are in Riverside and San Bernardino Counties. The Prado Dam provides flood risk management (FRM) to the largest watershed in southern California, with 1.4 million residents between Riverside County and the Pacific Ocean. 

The overall purpose of the Prado Dam Spillway Modification Project (DSMP) is to implement modifications at Prado Dam to decrease dam safety risks to a tolerable level and reduce life safety risks in an expeditious and efficient manner. Prado Dam has been designated as Dam Safety Action Classification (DSAC) 2, meaning it has a very high incremental risk where the combination of life or economic consequences with likelihood of failure is very high and immediate action is required to avoid failure.

The risks associated with dam failure will be reduced through construction of a new reinforced concrete labyrinth control structure, construction of composite embankment connections including embedded roller compacted concrete (RCC) monoliths, new reinforced concrete chute slabs anchored to foundation rock, new underdrain system for the chute, and new reinforced concrete cantilever spillway chute walls.

In accordance with DFARS 236.204, the estimated magnitude of construction for this project is over $500,000,000.00.

Estimated duration of the construction phase of this project is 365 days for the preconstruction services with an option to execute the construction for a total of 2,520 calendar days (7 years).

The North American Industry Classification System code for this procurement is 237990 which has a small business size standard of $45.0M. 

Small Businesses are reminded under FAR 52.219-14, (Deviation 2019-O0003), Limitations on Subcontracting.  Firm will not pay more than 85% of the amount paid by the Government for contract performance, excluding the cost of materials, to subcontractors that are not similarly situated entities. Any work that a similarly situated entity further subcontracts will count toward the 85% subcontract amount that cannot be exceeded.  Large Businesses must comply with the FAR 52.219-9 by submitting a Small Business Subcontracting Plan should this action be solicited as Full and Open Competition and an award is made to a large business firm.

TYPE OF SET-ASIDE: NONE – This requirement will be solicited as UNRESTRICTED.

Anticipated solicitation issuance date is on or about 21 November 2023, and the estimated proposal due date will be on or about 28 February 2024.  The official solicitation number W912BV23R0032 will be issued under SAM.gov via PIEE.eb.mil

Files

Notice history

Notice Type Posted
Whittier Narrows Dam Safety Modification Project Latest solicitation Solicitation
This notice Original Pre-Solicitation

Similar open opportunities

Opportunity Agency Set-aside Responses due
Bradbury Dam Outlet Valve Replacement NAICS 237990 — No set-aside
Brine pipeline access improvements City of Menifee, Riverside County, CA · NAICS 237110 ENDIST Los Angeles Total Small Business
Joe Pool Dam Slide Repairs Joe Pool Lake, 6399 FM 1382, Dallas, TX 75249 75249 · NAICS 237990 ENDIST Fort Worth Total Small Business